HomeMy WebLinkAboutNOVOVESKY GARDEN CENTER PUD - PRELIMINARY - 13-95A - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTSOILS AND PAVEMENT DESIGN
COLLINDALE BUSINESS PARK FIFTH FILING
(NOVOVESKY GARDEN SHOP)
FOR TIMBERLINE ROAD:
Used the same pavement thickness design as that used for the east side of
Timberline Road directly opposite the Novovesky site.
FOR ONSITE PAVEMENT:
Used pavement design per previous projects in the Collindale Business Park.
FOR ONSITE BUILDINGS:
No soils study necessary for greenhouse builidngs.
By ���:�a / o-G-..-L,
Phillip I Robinson P.E. & L.S.
*# 4502
o y� t
!I ��
��0iii1T1111%tt ...