Loading...
HomeMy WebLinkAboutNOVOVESKY GARDEN CENTER PUD - PRELIMINARY - 13-95A - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTSOILS AND PAVEMENT DESIGN COLLINDALE BUSINESS PARK FIFTH FILING (NOVOVESKY GARDEN SHOP) FOR TIMBERLINE ROAD: Used the same pavement thickness design as that used for the east side of Timberline Road directly opposite the Novovesky site. FOR ONSITE PAVEMENT: Used pavement design per previous projects in the Collindale Business Park. FOR ONSITE BUILDINGS: No soils study necessary for greenhouse builidngs. By ���:�a / o-G-..-L, Phillip I Robinson P.E. & L.S. *# 4502 o y� t !I �� ��0iii1T1111%tt ...