HomeMy WebLinkAboutLANDINGS OFFICE PARK P.U.D. - PRELIMINARY - 10-95 - CORRESPONDENCE - STAFF'S PROJECT COMMENTSThis completes the review comments at this time. Additional
comments may be forthcoming as the various departments and
reviewing agencies continue to review this request. Please be aware
of the following dates and deadlines to assure your ability to stay
on schedule for the April 24, 1995 Planning and Zoning Board
hearing:
******************************************************************
Plan revisions are due no later than the end of the working day,
April 5, 1995. Please contact me for the number of folded revisions
required for each document.
PMTfs, renderings, and 8 folded copies of final revisions (for the
Planning and Zoning Board packets) are due by 3:00 p.m. on April
17, 1995.
******************************************************************
Please contact me at 221-6750 if you have questions or concerns
related to these comments. I would like to schedule a meeting with
you as soon as possible, if necessary, to discuss these comments.
Sinc rely,
Steve Olt
Project Planner
xc: Kerrie Ashbeck
Stormwater Utility
Transportation
Vaught -Frye
Ripley Associates
Northern Engineering
file/Project Planner
necessary at some time in the future. This could be addressed
in the development agreement for the project.
12. There is a small, triangular piece of property at the
northeast corner of J.F.K. Parkway and Boardwalk Drive that is
under "other" ownership. What is the status of this property
and how does it fit into/affect this development?
13. What is the status of the Phase Two owner's involvement in
this preliminary P.U.D. plan? Is he fully aware of this
proposal and is he willing to participate? This item cannot go
before the Planning and Zoning Board for a decision, even at
the preliminary level, if the Phase Two owner is not willing
and able to be a part of the development.
14. The traffic impact study will have to be redone if the
property owner of Phase Two is not willing to participate and
withdraws from the development proposal.
15. An off -site drainage easement is required across the S.I.D.
property that is south and east of this development, east of
the Post Office. At least a letter of intent for this off -site
easement, and any other off -site easements deemed necessary,
is required by the revision date of April 5th.
16. Your plans are showing undetained storm drainage to the west,
into J.F.K. Parkway. There is no capacity on the ShopKo site
for this drainage water.
17. No maximum water depth in the parking lot detention is
indicated.
18. The individual site phasing considerations for improvements
and landscaping will be important. How will the perimeter
landscaping be phased? Continuity from a plant material
growth/maturity standpoint is important.
19. The overall parking numbers seem high. At 3 to 4 parking
spaces per 1,000 square feet of office space, a range of 85 to
110 spaces should be sufficient. Reducing the parking number
will enable you to create more comfortable human scale spaces
in the interior.
20. The grade differential from street level on J.F.K. Parkway up
to the site may present some physical transition problems.
21. A copy of the comments received from the Engineering
Department, along with a red -lined copy of the Site Plan &
Plat with additional comments, is enclosed with this letter.
b. Distances from property lines to each building envelope
must be shown, not from the property lines to the
buildings. Also, distances to 2 property lines should be
shown.
C. what is the stairway for on the south side of Building 1?
If it's part of the building, then it needs to be within
the envelope. How do you get to it?
d. There needs to be a note on the Landscape Plan requiring
installation of landscaping, or acceptable collateral,
prior to issuance of a certificate of occupancy.
4. A copy of the comments received from the Building Inspection
Department is attached to this letter.
5. The south entry from Boardwalk Drive (10' to 11' either side
of the center island) is not wide enough for fire apparatus.
6. Comments from the Water/Wastewater Department have been
forwarded to your engineer on a red -lined set of utility
plans.
7. The plans indicate the intent to use native plant materials in
this project. The Natural Resource Division does encourage
this and will want to see a specific plant species list with
the final P.U.D.
8. The Transportation Department has the following comments:
a. The J.F.K. Parkway/Boardwalk Drive intersection may
require a median and control of J.F.K. access upon
opening of the connection with Horsetooth Road, possibly
impacting this site. You should be aware of this.
b. Opportunities should be provided for future pedestrian
links to the vacant parcel to the north.
9. The use and the concept for the site look good, particularly
the scale of the buildings and spaces. The Site Plan, however,
does not appear to be consistent with your stated goals,
specifically in the area of proposed pedestrian circulation.
The Site Plan is very mechanical and parking lot oriented. The
pedestrian aspects are attached last as skimpy lines. That's
not how people naturally move. Please see a marked -up Site
Plan that is enclosed.
10. A copy of the comments received from the Stormwater Utility is
enclosed along with red -lined copies of the Site and Landscape
Plans that have additional comments.
11. Access control onto J.F.K. Parkway and Board Drive will be
necessary. Some form of control for traffic movement must be
designed at these entrys. Medians in both street may be
Commi .y Planning and Environmental vices
Planning Department
City of Fort Collins
March 15, 1995
Jon Prouty
Lagunitas Company
3307 South College Avenue, #200
Fort Collins, CO. 80525
Dear Jon,
Staff has reviewed your documents for the Landings office Park
P.U.D., Preliminary that were submitted to the City for review on
February 21, 1995, and would like to offer the following comments:
1. Public Service Company has the following comments:
a. Easements adjacent to all rights -of -way must be such that
from the back of walk to the rear line of the utility
easement is 13' minimum. Consider designating all areas
outside of the building envelopes as utility easements.
The City's concerns are that a blanket utility
easement method could, however, affect your
landscape plan. There are planting restrictions in
utility easements.
b. Building 8 envelope/building does not allow enough
clearance between back of walk on J.F.K. Parkway and
envelope/building. There must be 13' minimum for adequate
utility clearance.
C. There is potential conflict with 15" storm, fire hydrant,
future gas, future electric at the south entry into the
project. It's too tight for everybody.
d. No trees can be planted within 4' of gas lines.
2. A copy of the comments received from U.S. West is attached to
this letter.
3. The comments received from the Zoning Department are as
follows:
a. This property needs to be platted. A formal subdivision
plat, separate from the Site Plan, will be required with
the final P.U.D.
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750
FAX (303) 221-6378 TDD (303) 224-6002