Loading...
HomeMy WebLinkAboutLANDINGS OFFICE PARK P.U.D. - PRELIMINARY - 10-95 - SUBMITTAL DOCUMENTS - ROUND 1 - EASEMENTSMEMO To: Susanne Edminster From: Glen Schlueter p Date: February 14, 1995 Subj: Easement across S.I.D. Property @ JFK & Boardwalk Jon Prouty has contacted me since our telephone conversation on February 9th. His engineer has an approximate size of the easement needed. They believe it may fit in 10 feet or a maximum of 20 feet. In order to confine the water to,this small of an easement a swale would have to be constructed. Jon is proposing to construct the swale as any future developer of the property would have to do. So in other words there would be an improvement to the property not devaluation of the property. The future owner would have to dedicate an easement to handle the offsite•drainage and construct the swale since there is already an existing pipe draining water from the street onto the property. Jon proposes the swale follow the western property line which is usually what is done. If the new owner wants it in a different location it is simply shown on the plat which easements are vacated and which are being added. If you have any questions or want to discuss this just give me a call at 6065. Thanks cc: Jonathan J. Prouty DRAINAGE EASEMENT A drainage easement has been agreed to by Glen Schlueter at Stormwater and Susanne Edminster permitting our storm water drainage to proceed south under Boardwalk and then south along the east side of a piece of SID property owned by the City of Fort Collins down to an irrigation canal at which point it enters the storm drainage system via this canal. Final width of storm drainage swale will be between 10 and 15 feet as determined by final storm water engineering calculations with City of Fort Collins Stormwater Department approval. See attachment with regard to this matter.