Loading...
HomeMy WebLinkAboutST. ELIZABETH ANN SETON CHURCH EXPANSION - MAJOR AMENDMENT - MJA170001 - CORRESPONDENCE -08/01/2017: Where did these marked easements come from? Dedicated by separate document? See redlines. Comment Number: 6 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: The titles on the sheet 2 do not match. See redlines. Comment Number: 7 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: There are line over text issues. See redlines. Topic: Site Plan Comment Number: 1 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: Where did these marked easements come from? Dedicated by separate document? See redlines. Comment Number: 2 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: Please revise the legal description as marked. See redlines. Comment Number: 3 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. Department: Zoning Contact: Ryan Boehle, 970-416-24017 rboehle@fcgov.com Topic: General Comment Number: 1 Comment Originated: 10/04/2017 10/04/2017: No comments. Thank you. requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do not meet requirements. Please submit; an Erosion Control Plan (Based upon returned redlines), an Erosion Control Report (that meet the Erosion Control Criteria please see the returned criteria sheet), and an Escrow / Security Calculation (Was not included). If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Department: Technical Services Contact: Jeff County, 970-221-6588, icountv@fcgov.com Topic: Construction Drawings Comment Number: 8 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. Comment Number: 9 Comment Originated: 08/01/2017 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - X.XX�. Comment Number: 10 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: There are text over text issues. See redlines. Comment Number: 11 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: There are line over text issues. See redlines. Topic: Landscape Plans Comment Number: 4 10/05/2017: This will be reviewed at the next round of review. 08/01/2017: There are cut off text issues. See redlines. Comment Number: 5 10/05/2017: This will be reviewed at the next round of review. Comment Originated: 08/01/2017 Comment Originated: 08/01/2017 Comment Originated: 08/01/2017 Comment Originated: 08/01/2017 09/25/2017: The Utility Plan, Grading Plan, Site Plan and Landscape Plans all include the existing easements with text that includes 'by separate document" which is confusing because that leads me to question if the easement is existing or yet to be dedicated. Please either remove the'BSY text or include the reception number for these various existing easements. Comment Number: 12 Comment Originated: 09/25/2017 09/25/2017: There is a note on the Grading Plan that states that an underdrain may be required after soil investigation ... Please note that we will either require that the geotechnical recommendation be included in the drainage report prior to plan and report approval, or we will require that the underdrain be included in the design plans. In addition, typically, the outfall system for rain gardens includes an underdrain that drains to an area inlet box (with the rim set 12" above the rain garden bottom) that outfalls through a pipe to the detention basin. We have found that "overtopping" designs for rain gardens tend to result in erosion problems with vegetation establishment issues and we discourage this type of design. Comment Number: 13 Comment Originated: 09/25/2017 09/25/2017: Please note that the proposed drainage easement will need to be submitted, reviewed and approved as a part of this development application. Comment Number: 14 Comment Originated: 09/25/2017 09/25/2017: All other comments have been adequately addressed. Thank you. Contact: Jesse Schlam, 970-218-2932, Ischlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 07/20/2017 09/26/2017: Current Erosion Control Materials Submitted do not meet requirements. The erosion control requirements are in the Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3. a copy of the erosion control requirements can be found at www.fcgov.com/eroison. The Erosion Control Materials will need to be submitted at time of the first round of FDP. Please resubmit an Erosion Control Plans as the recently received materials have comments and redlines that needed to be addressed to meet City Criteria. Please resubmit an Erosion Control Report as the recently received materials has comments and redlines that needed to be addressed to meet City Criteria. Please resubmit an Erosion Control Escrow / Security Calculation as the recently received materials has comments and redlines, that needed to be addressed to meet City Criteria and as a result have changed the Erosion Control Plans and would require a recalculation of the Escrow. The site disturbs more than 10,000 sq. ft. and therefore Erosion and Sediment Control Materials need to be submitted. Based upon the area of disturbance, State permits for stormwater will be required since the site is over an acre and should be pulled before Construction Activities begin. Erosion Control Materials will need to be produced, reviewed, and accepted to meet City Erosion Control Criteria before Development Agreement Language can be drafted. If you need clarification concerning the Erosion Control Material Requirements or Comments presented above please contact myself. Jesse Schlam (970) 224-6015 jschlam@fcgov.com 07/20/2017: The site disturbs more than 10,000 sq. ft., therefore Erosion and Sediment Control Materials need to be submitted. The erosion control plans to indicate the limits of rollover curbing. Comment Number: 6 Comment Originated: 10/01/2017 10/01/2017: SIGN LOCATION East Plaza: Fire lane sign will need to be relocated at the edge of the fire lane. East & West Plaza: Fire lane sign should better indicate that the plaza is designed to accommodate fire apparatus. Rather than "Fire Lane No Parking", please modify signs to read, "Fire Lane - Weight Limit 40 Tons on Plaza Surface'. Department: Planning Services Contact: Clay Frickey, 970-224-60459 cfrickey@fcgov.com Topic: Building Elevations Comment Number: 7 Comment Originated: 10/03/2017 10/03/2017: Please provide staff with digital copies of a photosimulation showing what the church addition looks like from the neighborhoods to the north and east of the church site. These images will help the discussion about building height at the hearing and will assist with assessing any impacts the addition might have on the neighborhoods. Topic: Landscape Plans Comment Number: 5 Comment Originated: 08/01/2017 08/01/2017: It looks like the new concrete fire lane will impact some existing trees. Please meet with our Forestry department to determine a mitigation value for these trees and mitigate for the loss of these trees on -site. Topic: Site Plan Comment Number: 3 Comment Originated: 08/01/2017 10/03/2017: Repeat comment. This comment must be addressed before hearing. 08/01/2017: How is the site handling bicycle parking? There should be one space per 3,000 sq. ft. Please show this on the site plan and add a bicycle parking section to the parking table. Department: Stormwater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic: Drainage Report Comment Number: 15 Comment Originated: 09/25/2017 09/25/2017: Please note in the drainage report that the rain garden has not been sized to include the future parking or impervious areas. It is fine if your design does not include these future areas, but they will have to provide LID in the future. I would recommend that you consider building those areas into your LID calculations and design now to potentially alleviate or eliminate the need for additional LID in the future. Comment Number: 16 Comment Originated: 09/25/2017 09/25/2017: Please see the redlined report and plans for minor comments. Topic: General Comment Number: 11 Comment Originated: 09/25/2017 pre -submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Comment Number: 4 Comment Originated: 08/09/2017 08/09/2017: The allowable building height for a type VA building, A occupancy is 70 feet above. The top of the roof structure (not including the cross/steeple) is 73 feet above the average grade. The roof structure must be lowered to 70 feet above average grade. Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General Comment Number: 1 Comment Originated: 08/01/2017 09/25/2017: 08/01/2017: Light & Powers existing electric facilities look to be clear of the new addition. Field locate and verify the existing primary on the South side will not be in conflict with the new addition. Comment Number: 2 Comment Originated: 08/01/2017 08/01/2017: Any relocation or modification to existing electric facilities will be at the expense of the owner/developer. Comment Number: 3 Comment Originated: 08/01/2017 08/01/2017: Any proposed Light & Power electric facilities or existing electric facilities that will remain within the limits of the project must be located within a utility easement. Comment Number: 4 Comment Originated: 08/01/2017 08/01/2017: Does the applicant anticipate any change to the existing electric service? If yes, a C-1 Form and a One -line diagram will need to be submitted to Light & Power Engineering. A link to the C-1 form is below: http://www.fcgov.com/utilities/business/builders-and-developers/development-fo rms-guidelines-regulations Comment Number: 5 Comment Originated: 08/01/2017 08/01/2017: Electric Capacity Fee, Building Site charges, and any system modification charges necessary will apply to this development. Please contact Light & Power Engineering if you have any questions at 970-221-6700. Please reference our Electric Service Standards, development charges and fee estimator at the following link: http://www.fcgov.com/utilities/business/builders-and-developers Department: PFA Contact: Jim Lynxwiler, 970-416-2869, ilynxwiler@poudre-fire.org Topic: General Comment Number: 3 Comment Originated: 08/01/2017 08/01/2017: ROLLOVER CURBS The transitional fire lanes may incorporate roll over curbing onto the east plaza or entry to the west drive. No vertical curbing will be a permitted. Please update likely need to be rebuilt. I'd suggest contacting our Inspection Manager, Steve Cicione at 970 692-4418 to schedule a site visit to discuss the drive approach and potentially then update the plans as a result. 07/27/2017: In addition to the access ramps at public street intersections, the two driveway approaches onto Seton Street and one driveway approach onto Southridge Greens Boulevard would need to be be re -built with City/ADA compliance utilizing LCUASS designs such as 706.1 or 706.3 for the eastern driveway out to Seton Street and the driveway out to Southridge Green Boulevard, and 707.2 for the western driveway out to Seton Street. Note that City Streets will not upgrade these crossings as part of their concrete repair work. Comment Number: 6 Comment Originated: 07/27/2017 10/03/2017: Among the "etc." items from the submittal requirements for the civil drawings, please also have added the affirmation statement item I.J. in Appendix E-4 of LCUASS. 07/27/2017: Additional information on the civil set as part of our submittal requirements (General Notes, Construction Notes, Indemnification Statement etc.) is required. Department: Forestry Contact: Molly Roche, mroche@fc oq v.com Topic: Landscape Plans Comment Number: 1 09/25/2017: Comment Originated: 09/25/2017 It appears as though some trees may be impacted by the new fire lane. Please address and discuss feasibility of retaining trees on -site. If a site meeting would be helpful, contact Molly Roche (mroche@fcgov.com). Comment Number: 2 09/25/2017: Comment Originated: 09/25/2017 Please add Tree Inventory and Mitigation information to the landscape plans. This should include all existing trees on -site labeled and listed in a legend. Please provide reasons why trees are to be removed by adding a column to the Tree Mitigation legend labeled "Reason for Removal". Comment Number: 3 09/25/2017: Comment Originated: 09/25/2017 Please use the most current version of the City of Fort Collins General Landscape Notes (revised Nov 2015), which are available from Molly Roche. Department: Internal Services Contact: Sarah Carter, 970-416-2748, scatter@fcgov.com Topic: Building Insp Plan Review Comment Number: 1 Comment Originated: 08/08/2017 08/08/2017: Please schedule a pre -submittal meeting with Building Services for this project. Pre -Submittal meetings assist the designer/builder by assuring, early on in the design, that the new projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid -design stage for this meeting to be effective. Applicants of new projects should email scarter@fcgov.com to schedule a Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax tcgov. com/developmentreview October 06, 2017 Cathy Mathis TB Group 444 Mountain Ave Berthoud, CO 80513 RE: St. Elizabeth Ann Seton Catholic Church Expansion, MJA170001, Round Number 2 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcqov.com Topic: General Comment Number: 2 Comment Originated: 07/27/2017 10/03/2017: Carried over for reference pending verification from PFA on the configuration. 07/27/2017: The new proposed emergency access would require the dedication of an emergency access easement. The process to dedicate an easement can be found here under Easement Dedication and would need to be completed prior to plan approvals. http://www.fcgov.com/engineering/devrev.php Comment Number: 3 Comment Originated: 07/27/2017 10/03/2017: Carried over for reference as it appears this is still applicable. 07/27/2017: Should the portion of the rain garden that falls outside of the existing drainage easement need to be dedicated as an easement, the easement process identified in the previous link would also be applicable. Comment Number: 5 Comment Originated: 07/27/2017 10/03/2017: With the indication on the civil plans indicating that the westernmost drive approach out to Seton Street is ADA compliant, Engineering Inspection visited the site and viewed that the existing sidewalk crossing does not meet ADA with regards to slope and believes the overall approach would