HomeMy WebLinkAboutFREIGHT DEPOT PUD - PRELIMINARY - 29-95 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYCenter For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2..1 Page 1
MMMMMMMMMMMMMMMYMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMXMMMMMMMMMMMM
File Name ................
Streets: (N-S) mason (E-W) access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/16/95 � n
Other Information......... existing .short
Two-way Stop -controlled Intersection
Northbound I Southbound Eastbound Westbound
L T R; L T R; L T R; L T R
No. Lanes ; 0 2< 0; 0 0 0; 0 0 0; 0 0 1
Stop/Yield ; Ni -N; 1
Volumes 290 51 20
PHF .95 .95; -i .95
Grade 0 I 0 0 ; 0
SU/RV's (%); 0 0; i 0
PCE's , 1.1 1.11 ; 1.1
-------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up -
Maneuver
Gap (tg)------------Time
(tf)
----
-------------------------------------------'-
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
- 6.50
3.30
Left Turn Minor
Road
7.00
3.40,
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2:1 Page 2
YYYYXXXXXXYYYXXXXXYXXYYYYXXXXXXXXYXYYYYYYYYYYXYYXYXXXXYYYYYYYXXX
i
WorkSheet for TWSC
Intersection
--------------------------------------------------------
Step 1: RT from Minor Street
-WB EB
-----------------------------------------------------
Conflicting Flows: (vph)
148
Potentials Capacity: (pcph)
1165
Movement Capacity: (pcph)
1165 -
Prob. of Queue -free State:
--------------------------------------------------------
0.98
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
I XYYXXXYYXXXXYXXXXYYYXXYYYXXXYXXXYXXXYYXXXXY##XY##YYYXXYYXXXYXXX
Intersection Performance Summary
FiowRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS " By App
-------- ------ ------ ------ ------------ ------
WB R 23 1165 3.2 A
Intersection Delay = 0.4
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
X XXMMMMMxXXXMXXxMMXMXXXMXXXMMMMMXXMXMXMMMMMMMMXMMMMMMMM##MMMMXMx
File Name ................
Streets: (N-S) mason (E-W) access
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/16/95
Other Information......... existing short
Two-way Stop -controlled Intersection
Northbound I Southbound Eastbound Westbound
L T R; L T R; L T R; L T R
__-_ ____ ---- i---- ____ ---- i---- ____ ---- i----
No. Lanes 0 2< 0; 0 0 0; 0 0 0; 0 0 1
Stop/Yield N; N; ;
Volumes 150 15; 5
PHF ; .95 .95; ' .95
Grade 0 ; 0 0 ; 0
MC's (%) 0 0; 0
SU/RV's (%); 0 0; ; 0
CV's (%) 0 0; ; 0
PCE's 1.1 1.1; ; ; 1.1
------------------------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
zMMzxzxXMZMXzxzXzzzzMzzxMMxXXxzzxMxzxzXXXMMX#XZMM#XXx#XzxMzzzxzx
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB ES
Conflicting Flows: (vph) 82
Potential Capacity: (pcph) 1258
Movement Capacity: (pcph) 1258
Prob. of Queue -free State: 1.00
-------------------------------------------------------
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
#XXXXXXXXXX#XXXXXXXXX#XXXXXXXXYX##XXXX#XXXxXX#XXXXMXXXXXXXXXXXXX
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ------------ ------ -------
WB R 6 1258 2.9 A
Intersection Delay = 0.5
Center For Microcomputers In Transportation Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2
ZiiiZXXXYYYiYZZiiZZYYXXYiYYiiiZi#ZZXXX#XXXXYXiXXiZZ##XYYY#YYXYKZ#YXXXYiXXXiX#XX#YiiYYZZZiZYYYXiiiZZiZZZXXXiiiiiiZZZZXXXiXYiYiiZZ
File Name ................
Streets: (N-S) mason (E-W) maple
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/16/95 `i M
Other Information.......... existing short
Two-way Stop -controlled Intersection
---------- ---- Northbound I ; Southbound ; Eastbound Westbound
L T R; L T R; L T R; L T R
�____ -___--- -i---- ____ ___ ___ ________1____ _-_-
No. Lanes 1 0> 2< 0; 0 0 0: 1 1 0; 0 1 1
Stop/Yield N; N;
Volumes 45 210 35; 5 75 i 150 35
PHF .95 .95 .95; ! .95 .95 .95 .95
Grade 0 0 0 0
MC's (%) 0 0 01 0 0 0 0
SU/RV's (%); 0 0 0; I 0 0 0 0
CV's (%) 0 0 0; 0 0 0 0
PCE's 1.1 1.1 1.1; 1.1 1.1 ; 1.1 1.1
------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap
(tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor-
Road
7.00
3.40
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
122
Potential Capacity: (pcph)
1201
Movement Capacity: (pcph)
1201
Prob. of Queue -free State:
0.97
--------------------------------------------------------
Step 2: LT from Major Street
SB
NB
____,____________________________________________________
Conflicting Flows: (vph)
0
-
Potential Capacity: (pcph)
1714
Movement Capacity: (pcph)
1714
Prob. of Queue -free State:
0.97
TH Saturation Flow Rate: (pcphpl)
3400
RT Saturation Flow Rate: (pcphpl)
1700
Major LT Shared Lane Prob.
of Queue -free State:
0.97
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
-------------------------------------------------------
Conflicting Flows: (vph)
272
290
Potential Capacity: (pcph)
756
738
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.97
Movement Capacity: (pcph)
731
713
Prob. of Queue -free State:
0.76
0.88
--------------------------------------------------------
Step 4: LT from Minor Street
WS
EB
-------------------------------------------------------
Conflicting Flows: (vph)
330
Potential Capacity: (pcph)
651
Major LT..Minor TH
Impedance Factor:
0.74
Adjusted Impedance Factor:
0.80
Capacity Adjustment Factor
due to Impeding Movements
0.77
Movement Capacity: (pcph)
--------------------'-----------------'-------------
501
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS
By App
________ ______ ______ ______
EB L 6 501
____________
7.3
______
8
-------
EB T 87 713
5.8
B
5.8
WB T 174 731
6.5
B
5.8
WB R 41 1201
3.1
A
NB L 52 1714
2.2
A
0.3
Intersection Delay =
3.0
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection- Release 2.1 Page 1
XXXX#XXXMX#XXXX#XXXXXXXXXXXXXX#XXXX#XXX#X#XX#XX#XXXXXXX XXXX#XXXX
File Name ................
Streets: (N-S) mason (E-W) maple
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... mjd
Date of Analysis.......... 6/16/95
Other Information......... existing short A M
Two-way Stop -controlled Intersection
1, Northbound Southbound Eastbound Westbound
L T R; L T R; L T R.; L T R
---- ---- ----I---- --------; ---- --------' ---- ---- ----
No. Lanes '; 0> 2< 0; 0 0 0; 1 1 0; 0 1 1
Stop/Yield ; N; N;
Volumes 1 30 90 30; - 5 100 110 5
PHF .95 .95 .95; .95 .95 ; .95 .95
Grade 0 0 0 0
MC's (%) ; 0 0 0; ; 0 0 0 0
SU/RV's (%); 0 0 0; 0 0 0 0
CV's (%) 0 0 0; 0 0 0 0
PCE's 1.1 1.1 1.11 1.1 1.1 1.1 1.1
________________________________________________________________________
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
(tg)____-__-_---Time
(tf)
----
-----------------------------
Left Turn Major
--__-_---Gap
Road
-----
5.50
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
#XXXXXXXXXXXXXXXXXXZXXXXXXXZXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXZXXM.'X
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street W8 EB
Conflicting Flows: (vph)
60
Potential Capacity: (pcph)
1291
Movement Capacity: (pcph)
1291
Prob. of Queue -free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
SB
NS
-------------------------------------------------------
Conflicting Flows: (vph)
0
Potential Capacity: (pcph)
1714
Movement Capacity: (pcph)
1714
Prob. of Queue -free State:
0.96
TH Saturation Flow Rate: (pcphpl)
3400
RT Saturation Flow Rate: (pcphpl)
-
1700
Major LT Shared Lane Prob.
of Queue -free State:
0.98
------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
________________________________________________________
Conflicting Flows: (vph)
135
150
Potential Capacity: (pcph)
909
891
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Movement Capacity: (pcph)
889
872
Prob. of Queue -free State-
86
087
-------------0____------_
j Step 4: LT from Minor Street
WB
EB
------------------------------------------------------
Conflicting Flows: (vph)
174
' Potential Capacity: (pcph)
820
Major LT, Minor TH
Impedance Factor:
0.84
Adjusted Impedance Factor:
0.88
Capacity Adjustment Factor
due to Impeding Movements
0.87
Movement Capacity: (pcph)
------------------------ _ ------ __________________________
714
Intersection Performance
Summary
i FlowRate MoveCap SharedCap
Avg.Total
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS
________ ______ ______ ______
EB L 6 714
------------
5.1
------
B
EB T 416 872
4.8
A
WB T 128 889
4.7
A
WB R 6 1291
2.8
A
NB L 35 1714
2.1
A
Intersection Delay =
3.0
Delay
By APp
4.8
4.6
0.4
HCM: SIGNALIZF,O INTEHRSECTION SUMMARY Version 2.4 01-04-1980
Center or Microcomputers In r•ans portation
Streets: (E-W) laporte (N-S) mason
Analyst: Matt Delich File Name:
Area Type: CBD 6-16-95 am pm
Comment: existing short
Eastbound Westbound Northbound Southbound
L T R I L T R; L T R; L T R
�---- --- - --- -- ---- ----'---- ---- ----
No. Lanes 1 2 2 < > 2 <
Volumes 35 235 135 35: 45 95 50
PHF or PK1510.95 0.95 i 0.95 0.95;0.95 0.95 0.951
Lane Width 112.0 12.0 ; 12.0 12.0
Grade 0 ; 0 0
% Heavy Veh; 1 1 1 1; 1 1 1
Parking ;(Y/N) Y 20 ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops 0; 01 0
Con. Peds 0; 0; 0; 0
Ped Button ;(Y/N) N ;(Y/N) N ;(Y/N) N ;
Arr Type 1 3 3 3 3; 3 3 3
RTOR Vols ; 0; 0; 0;
Lost Time 13.00 3.00 3.00 3.00;3.00 3.00 3.00
Prop. Share; -1 -1; -1 -1; -1 -1;
Prop- Prot.; -2; -2; -2;
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left ;NB Left
Thru * Thru
Right Right
Peds Peds
WB Left ;SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right ;EB Right
S8 Right ;WB Right
Green 30.0P ;Green 45.OP
Yellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 85 secs Phase combination order: #1 #5
-----------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C .Approach:
Mvmts- Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 407 1080 0.091 0.376 13.0 8 13.6 B
T 1147 3048 0.226 0.376 13.7 B
WB TR 1111 2952 0.169 0.376 13.4 8 13.4 B
NB LTR 1601 2895 0.131 0.553 7.0 B 7.0 8
Intersection Delay = 11.6 sec/veh Intersection LOS = B
Lost Time/Cycle. L = 6.0 sec Critical v/c(x) = 0.169
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
enter or Microcomputers In Transportation
-------------------------------------------------------------------'---
-----------------------------------------------------------------------
Streets: (E-W) laporte (N-S) mason
Analyst: Matt Delich File Name:
j Area Type: CBD 6-16-95 am
Comment: existing short
Eastbound Westbound ; Northbound , Southbound
L T R ; -L T R ; L T R ; L T R
---- ------------ ------------ -------- '---- ---- ----
No. Lanes 1 2 2 < ; > 2 <
Volumes 30 225 255 40; 95 225 105
PHF or PK1510.95 0.95 0.95 0.95:0.95 0.95 0.95;
Lane Width 112.0 12.0 12.0 ; 12.0
Grade 0 0 0
% Heavy Veh; 1 1 1 1; 1 1 .1;
Parking ;(Y/N) Y 20 ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops ; 0; 0; 0;
Con. Peds ; 0; 0; 0; 0
Ped Button i(Y/N) N ;(Y/N) N ;(Y/N) N
Arr Type 3 3 3 3; 3 3 3;
RTOR Vols ; 0; 0; - 0
Lost Time ;3.00 3.00 3.00 3.00:3.00 3.00 3.00;
Prop. Share; -1 -1; -1 -1; -1 -1;
Prop. Prot.; -2; -2; -2;
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * ; Thru
Right ' Right
Peds ; Peds
WS Left ;SB Left
Thru * ; Thru
Right * Right
Peds ; Peds
NB Right ;EB Right
SB Right ;WB Right
Green 30.OP ;Green 45.OP
Yellow/AR 5.0 ;Yellow/AR 5.0
Cycle Length: 85 secs Phase combination order: #1 #5
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 300 797 0.107 0.376 13.1 B 13.6 B
T 1147 3048 0.217 0.376 13.7 8
WB TR 1123 2984 0.289 0.376 14.1 B 14.1 B
NB LTR 1604 2901 0.293 0.553 7.7 B 7.7 B
Intersection Delay = 11.2 sec/veh Intersection LOS = 8
Lost Time/Cycle. L = 6.0 Sac Critical v/c(x) = 0.292
-----------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
Streets: (E-W) (E-W) laprorte/+szse WAta U-r (N-S) college
Analyst: Matt Delich File Name:
Area Type: CBO 6-16-95 am pm
Comment: existing short
Eastbound Westbound Northbound Southbound
L T R L T R ; L T R ; L T R
---- --------;---- ---- ----;---- ---- ----;---- ---- ----
No. Lanes 1 1 1 1 1< 1 2 \ 1 2<
Volumes 105 130 65; 20 50 20; 75 28060; 20 465 50
PHF or PK15;0.95 0.95 0.95:0.95 0.95 0.95:0.95 0.95 0.9510.95 0.95 0.95
Lane Width ;12.0 12.0 12.0112.0 12.0 112.0 12.0 ;12.0 12.0
Grade 0 0 0 ; . 0
% Heavy Veh; 1 1 1;, 1 1 1; 1 2 1; 1 2 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops ; 0; 0; - 0; 0
Con. Pads 0; 0; 0; 0
Ped Button ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Arr Type ; 3 3 3; 3 3 3; 3 3 3; 3 3 3
RTOR Vols 0; 0; 0; 0
Lost Time ;3.00 3.00 3.00;3.00 3.00 3.00:3.00 3.00 3.0013.00 3.00 3.00
Prop. Share; -1 -11 -1 -1; -1 -1; -1 -1
Prop. Prot.; -2; -2; -2; -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * ; Right
Peds _ ; Peds
WB Left * 'SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right ;EB Right
38 Right ;WB Right
Green 22.OP ;Green 6.OP 41.OP
Yellow/AR 5.0 ;Yellow/AR 5.0 6.0
Cycle Length: 85 secs Phase combination order: #1 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
---- ---- ------- ----- --- - ----- --- ----- --
EB L 360 1275 0.308 0.282 18.4 C 18.1 C
T 478 1693 0.287 0.282 18.2 C
R 406 1439 0.167 0.282 17.5 C
WB L 280 991 0.075 0.282 17.0 C 17.3 C
TR 458 1622 0.162 0.282 17.4 C
NB L 381 1608 0.207 0.224 4.6 A 7.9 B
TR 1520 2936 0.247 0.518 8.6 B
SB L 515 1608 0.041 0.224 4.2 A 9.2 B
TR 1538 2972 0.370 0.518 9.4 B
Intersection Delay = 11.3 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 9.0 sec Critical v/o(x) = 0.366
-------------------------------------------_------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
Streets: (E-W) laporte/}app-reW AC/JU i (N-S) college
Analyst: Matt Delich File Name:
Area Type: CBO �6-16-95 am pm
Comment: existing short
_ -----------------
Eastbound ; Westbound ; Northbound ; Southbound
L T R L T R; L T R; L T R
---- ----'---- ---- ----
No. Lanes 1 1 1 1 1 < 1 2 < 1 2 <
Volumes 85 125 135; 80 100 45; 125 645 105: 50 580 80-
PHF or PK15;0.95 0.95 0.95;0.95 0.95 0.95:0.95 0.95 0.9510.95 0.95 0.95
Lane Width ;12.0 12.0 12.0;12.0 12.0 ;12.0 12.0 ;12.0 12.0
Grade ; 0 ; 0 ; 0 ; 0 .
% Heavy Veh; 1 1 1; 1 1 1; 1 2 1: 1 2 1
Parking ;(Y/N) N ;.(Y/N) N ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops ; 0; 0; 0; 0
Con. Pads ; 0; 0; 0; 0
Ped Button :(YIN) N ;(Y/N) N :(Y/'N) N ;(Y/N) N
Arr Type 3 3 3; 3 3, 3; 3 3 3; 3 3 3
RTOR Vols ; 0; 0; 0; 0
Lost Time ;3.00 3.00 3.00;3.00 3.00 3.0013.00 3.00 3.00:3.00 3.00 3.00
Prop. Share; -1 -1; -1 -1; -1 -11 -1 -1
Prop. Prot.; -2; -2; -2; -2
---------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * ; Thru
Right * Right
Peds Peds
WB Left * ;SB Left
Thru * Thru
Right * ; Right
Peas Peds
NB Right ;EB Right
SB Right ;WB Right
Green 22.OP ;Green 6.OP 41.OP
Yellow/AR 5.0 ;Yellow/AR 5.0 6.0
Cycle Length: 85 secs Phase combination order: #1 #5 #6
----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- --- -- ----- ---
EB L 263 931 0.339 0.282 18.7 C 18.5 C
T 478 1693 0.276 0.282 18.1 C
R 406 1439 0.349 0.282 18.7 C
WB L 286 1012 0.294 0.282 18.3 C 18.5 C
TR 456 1614 0.334 0.282 18.5 C
NB L 295 1608 0.447 0.2<24 5.9 B 10.1 8
TR 1529 2954 0.542 0.518 10.8 B
SB. L 262 1603 0.202 0.224 5.1 B 9.8 8
TR 1534 2963 0.476 0.518 10.2 B
Intersection Delav = 12.1 sec/veh Intersection LOS = 8
Lost Tirne/Cycle, L = 9.0 sec Critical v/c(x) = 0.516
-------------------------------------------------------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
Streets: (E-W) maple/jefferson (N-S) college
Analyst: Matt Delich File Name:
Area Type: CBD 6-16-95 am pm
Comment: existing short
I
Eastbound Westbound Northbound Southbound
L T R ; L T R L T. R ; L T R
---- --------;---- ---- ----I---- ---- ---- I----
No. Lanes ; 1 1 1> 1 1 ; 1 .2 < ; 1 2 <
Volumes 35 55 30; 35 80 225; 25 300 70; 360 530 25
PHF or PK1510.95 0.95 0.95:0.95 0.95 0.95:0.95 0.95 0.95;0.95 0.95 0.95
Lane Width ;12.0 12.0 12.01 12.0 12.0;12.0 12.0 ;12.0 12.0
Grade 0 0 i 0 ; 0
% Heavy Veh; 1 1 1.; 1 1 4; 1 2 1; 4 2 1
Parking ;(Y/N) Y 20 ;(Y/N) N ;(Y/N) Y 20 ;(Y/N) N
Bus Stops ; 0; 0; 0; 0
Con. Peds ; 0; 0; 0; 0
Ped Button :(YIN) N ;(Y/N) N :(YIN) N ;(Y/N) N
Arr Type 3 3 3; 3 3 3; 3 3 .31 3 3 3
RTOR Vols 0; 0; 0; 0
Lost Time 13.00 3.00 3.0013.00 3.00 3.0013.00 3.00 3.00;3.00 3.00 3.00
Prop. Share; -1 -1; -1 -11 -1 -i; -1 -1
Prop. Prot.; -2; -2; -2; -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * ; Right
Peds ; Peds
WB Left * ;SB Left
Thru * Thru
Right * Right
Peds ; Peds
NB Right IEB Right
SB Riaht ,WB Right
Green 26.OP ;Green 35.OP 29.OP
Yellow/AR 5.0 ;Yellow/AR 0.0 5.0
Cycle Length: 100 secs Phase combination order: #1 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane
Group:
Adj Sat
v/c
g/C
Approach:
Mvmts
-----
Cap
----
Flow
-------
Ratio
Ratio Delay
LOS
Delay
LOS
EB
L
291
1038
---
0.127
----- -----
0.280 20.4
---
C
-----
20.3
---
C
T
474
1693
0.122
0. 280 20.4
C
R
403
1439
0.079
0.280 20.1
C
WB
LT
438
1563
0.276
0.280 21.4
C
11.4
8
R
881
1398
0.269
0.630 6.3
B
NB
L
140
452
0.186
0.310 19.3
C
21.2
C
TR
909
2932
0.450
0.310 21.'3
C
S8
L
668
1562
0.567
0.670 '.3
B
6.1
8
TR
2200
3333
0.279
0.660 5.4
8
Intersection
Delay =
11.5 sec/veh Intersection LOS =
8
Lost
_______________________________________________________________________
Time/Cycle. L
= 9.0
sec Critical
v./c(x)
= 0.505
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
-----------------------------------------------------------------------
Streets: (E-W) maple/Jefferson (N-S) college
Analyst: Matt Delich File Name:
Area Type: CBD 6-16-95 am
Comment: existing short
Eastbound Westbound Northbound 1 Southbound
L T R L T R L T R L T R
No. Lanes ; 1 1 1; > 1 1; 1 2< ; 1 2<-_--
Volumes ; 30 60 50; 75 95 410; 45 635 75; 310 530 45
PHF or PK15;0.95 0.95 0.9510.95 0.95 0.95;0.95 0.95 0.95:0.95 0.95 0.95
Lane Width ;12.0 12.0 12.0; 12.0 12.0;12.0 12.0 ;12.0 12.0
Grade 0 0 ; 0 0
% Heavy Veh; 1 1 1; 1 1 4; 1 2 i; 4 2 1
Parking :(YIN) Y 20 ;(Y/N) N ;(Y/N) Y 20 :(YIN) N
Bus Stops - 0; 0; 0; 0
Con. Peds 0; 0; 0; 0
.Ped Button ;(Y/N) N :(YIN) N ;(Y/N) N ;(Y/N) N
Arr Type ; 3 3 3; 3 3 3; 3 3 3i 3 3 3
RTOR Vols - 0; 0; 0; 0
Lost Time ;3.00 3.00 3.00;3.00 3.00 3.00:3.00 3.00 3.00;3.00 3.00 3.00
Prop. Share; -1 -1; -1 -1; -1 -1; -1 -1
Prop. Prot.; -2; -2; -2; -2
----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left ' ;NB Left
Thru * ; Thru
Right * ; Right
Peds Peds
WB Left * ;SB Left
Thru * ; Thru
Right * ; Right
Peds Peds
NB Right ;EB Right
SB Right ;WB Right
Green 26.OP ;Green 27.OP 47.OP
Yellow/AR 5.0 ;Yellow/AR 0.0 5.0
Cycle Length: 110 secs Phase combination order: Al M5 N6
--------- ----- ------------------ ------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ----------- ----- ----- ----- --- ----- ---
EB L 196 771 0.163 0.255 24.3 C 24.2 C
T 431 1693 0.146 0.255 24.1 C
R 366 1439 0.145 0.255 24.1 C
WB LT 369 1451 0.485 0.255 27.3 D 19.5 C
R 699 1398 0.618 0.500 16.3 C
NB L 188 423 0.249 0.445 14.6 6 17.8 C
TR 1322 2968 0.593 0.445 18.0 C
SB L 433 1562 0.753 0.464 22.3 C 10.8 8
TR 2289 3313 0.277 0.691 5.0 A
Intersection Delay- 16.0 sec/veh Intersection LOS = C
Lost Time/Cycle. L = 9.0 sec Critical v/c(x) = 0.649
_______________________________________________________________________
,�
F'o
APPENDIX C
IF':
Center For
Microcomputers In Transportation
Center For Microcomputers
In Transportation
HCS: Unsignalized Intersection Release 2.1
Page 1
HCS: Unsignalized Intersection Release 2.1
Page 2
#######YXX##########Y##
File Name ................
Streets: (N-S) mason
(E-W) maple
Major Street Direction....
NS
WorkSheet for TWSC Intersection
Length of Time Analyzed...
60 (min)
Analyst ...................
mjd
Step 1: RT from Minor Street
WB
EB
Date of Analysis..........
________________________________________________________
Other Information........
existing short
1-
Conflicting Flows: (vph)
115
Potential Capacity: (pcph)
1211
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1211
Prob. of Queue -free State:
0.97
Northbound
Sou thbound ' Eastbound
Westbound
________________________________________________________
;_-_L T
____ ----
R; L T R; L
____ ____i____
T R;
____ ----
L T
____ ____
R i
.
Step 2: LT from Major Street
SB
NB
No. Lanes 0> 2<
i----
0� 0 0 0� 1
i----
� 1 0�
0 1
1 �
______________________________________________
Conflictin Flows: (vph)
9
0
Stop/Yield
N; N;
Potential Capacity: (pcph)
1714
Volumes 35 205
25; 5
70 !
145
30
Movement Capacity: (pcph)
1714
PHF .95 .95 .95:
I .95
.95
.95
.95
Prob. of Queue -free State:
0.98
Grade 0
0
0"
0
TH Saturation Flow Rate: (pcphpl)
3400
MC's (%) ; 0 0
0; 0
0
0
0
RT Saturation Flow Rate: (pcphpl)
1700
SU/RV's (%); 0 0
0; ; 0
0
0
0
Major LT Shared Lane Prob.
CV's (%) 0 0
0; 0
0
0
0
of Queue -free State:
0.97
PCE's 1.1 1.1 1.11
11.1
1.1
1.1
1.1
--------------------------------------------------------
------------------------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
252
265
Potential Capacity: (pcph)
777
763
Adjustment Factors
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.97
Vehicle
Critical
Follow-up
Movement Capacity: (pcph)
757
743
Maneuver
---------------------------------------------------------------
Gap (tg)
Time (tf)
Prob. of Queue -free State:
0.78
0.89
Left Turn Major Road
5.50
2.10
-------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
Right Turn Minor Road
5.50
2.60
--------------------------------------------------------
Through Traffic Minor Road 6.50
3.30
I
Conflicting Flows: (vph)
313
Left Turn Minor Road
7.00
3.40
Potential Capacity: (pcph)
668
Major LT. Minor TH
Impedance Factor:
0.76
Adjusted Impedance Factor:
0.81
Capacity Adjustment Factor
due to Impeding Movements
0.79
Movement Capacity: (pcph)
------------ ____________________________________________
527
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
Delay
LOS
By App
EB L 6 521
6.9
B
-
EB T 81 743
5.4
8
5.5
WB T 168 757
6.1
B
5.6
WB R 35 1211
3.1
A
i
i
NB L 41 1714
2.2
A
0.3
Intersection Delay =
2.9
Center For
Microcomputers In Transportation
Center For Microcomputers
In ;Transportation
HCS: Unsignalized Intersection
Release 2.1
Page 1
HCS: Unsignalized Intersection Release 2.1
Page 2
File Name ................
Streets: (N-S) mason
(E-W) maple
-
Major Street Direction....
NS
WorkSheet for TWSC Intersection
Length of Time Analyzed...
60 (min)
--------------------------------------------------------
Analyst...................
mjd
-
Step 1: RT from Minor Street
WB
EB
Date of Analysis..........
Other Information.........
6/1
esistina short
4 A�
______________________________________________________-
Conflicting Flows: (vph)
55
Potential Capacity: (pcph)
1299
Two-way Stop -controlled
Intersection
-
Movement Capacity: (pcph)
1299
------------------------------------------------
------------
-
Prob. of Queue -free State:
I.00
Northbound
! Southbound Eastbound
Westbound
--------------------------------------------------------
L T
---- ---- ---
R: L T R! L
'---- ---- ----I----
- T R!
L T
R
Step 2: LT from Major Street
SB
NO
No. Lanes 1 0> 2<
01 0 0 0! 1
---- ----I----
1 01
--- ----
0 1
1
---------------------_---------------------------------
Conflicting Flows: (vph)
0
Stop/Yield !
N! -N!
Potential Capacity: (pcph)
1714
Volumes ! 25 85
251 5
95 !
105
5
Movement Capacity: (pcph)
1714
PHF 1 .95 .95 .951
.95
.95
.95
.95
Prob. of Queue -free State:
0.98
Grade 0
i 0
0 !
0
TH Saturation Flow Rate: (pcphpl)
3400
MC's (%) 0 0
0! 0
0
0
0
RT Saturation Flow Rate: (pcphpl)
1700
SU/RV's (%)! 0 0
0! 0
0
0
0
Major LT Shared Lane Prob.
CV's (%) 0 0
0! 0
0
0
0
of Queue -free State:
0.98
PCE's ! 1.1 1.1 1.1!
! 1.1
1.1 !
1.1
1.1
-------------------------------------------------------
-----------------------------------------------------------------------
Step 3: TH from Minor Street
--------------------------------------------------------
WB
EB
Conflicting Flows: (vph)
122
135
Potential Capacity: (pcph)
926
909
Adjustment Factors
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Vehicle
Critical
Follow-up
Movement Capacity: (pcph)
910
893
Maneuver
-----------------------------------------------------------------
Gap (tg)
Time (tf)
Prob. of Queue -free State:
0.87
0.88
Left Turn Major Road
5.50
2.10
----------------------___-------------------------------
Step 4: LT from Minor Street
W8
EB
Right Turn Minor Road
5.50
2.60
--------------------------------------------------------
Through Traffic Minor Road
6.50
3.30
Conflicting Flows: (vph)
164
Left Turn Minor- Road
7.00
3.40
Potential Capacity: (pcph)
832
Major LT, Minor TH
Impedance Factor:
0.85
Adjusted Impedance Factor:
0.89
Capacity Adjustment Factor
due to Impeding Movements
0.88
Movement Capacity: (pcph)
----------------
-----------------
733
i
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg,Total
Delay
i
Movement v(pcph) Cm(pcph) Csh(pcph)
________ ______ ______ ______
Delay______
_____
LOS
By Apo
I
EB L 6 733
5.0
-____-
A
_________
EB T 110 893
4.6
A
4.6
WB T 122 910
4.6
A
4.5
WB R 6 1299
2.8
A
NB -L 29 1714
2.1
A
0.4
Intersection Delay =
2.9
M
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
Streets: (E-W) laporte (N-S) mason
Analyst: Matt Delich File Name:
Area Type: Caa pm
Comment existing short
Eastbound Westbound Northbound Southbound
L T R L T R L T R ; L T R
---- ---- ----'---- ---- --- ---- ---- ---'---- ---- ----
No. Lanes ; 1 2 2 < > 2 <
Volumes 30 230 130 25! 4085 45
PHF or PK15�0.95 0.95 0.95 0.95:0.95 0.95 0.95:
Lane Width 112.0 12.0 ; 12.0 12.0
Grade ; 0 0 0
% Heavy Veh; 1 1 1 1 1! 1- 1 1!
Parking ;(Y/N) Y 20 ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops ; 0; 0; 0;
Con. Peds - 0; 0; 0; 0
Ped Button ;(Y/N) N ;(Y/N) N ;(Y/N) N
Arr Type .1 3 3 ' 3 3; 3 3 3i.
RTOR Vols 01 0; 0
Lost Time ,3.00 3.00 ; 3.00 3.00;3.00 3.00 3.00:
Prop. Share; -1 -11 -1 -l; -1 -1
Prop. Prot.; -2; -2; -2
------------------------ ---------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right ; Right
Peds Peas
W8 Left ;SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right ;EB Right
SB Right :WB Right
Green 30.OP ;Green 45.OP
Yellow/AR 5.0 :Yellow/AR 5.0
Cycle Length: 85 secs Phase combination order: #1 #5
-------------- --------- - ----------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ---- ----- ----- --- ----- ---
EB L 419 1114 0.076 0.376 12.9 B 13.6 B
T 1147 3048 0.221 0.376 13.7 B
WB TR 1120 2974 0.153 0.376 13.3 8 13.3 B
NB LTR 1601 2895 0.117 0.553 6.9 8 6.9 B
Intersection Delay = 11.6 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.159
---- ------------ ---------- ---- --=-------- ------- ----------------------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4
01-04-1980
Center For
Microcomputers In Transportation
Streets: (E-W) laporte
(N-S) mason
Analyst: Matt Delich
Area Type: C5n,
File Name:
6-16-95 am pm
Comment: -xis ing short
Eastbound ; Westbound Northbound
Southbound
L T
' --- ---- ----
R L T R L T R
--- ----
L T R
No. Lanes 1 2
---- ----
2 < > 2 <
Volumes 25 220
- 250 35; 90 215 100
PHF or PK15;0.95 0.95
i 0.95 0.9510.95 0,95 0.95:
Lane Width :12.0 12.0
12.0 12.0
Grade 0
; 0 ; 0 '
% Heavy Veh; 1 1
; 1 1; 1 1 .1;
Parking :(Y/N) Y
20 ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops
0; 0; 0
Con. Peds 1
01 0; 0;
0
Ped Button ;(Y/N) N
;(Y/N) N ;(Y/N) N
Arr Type 1 3 3
3 3; .3 3 3;
RTOR Vols '
01 0: 01.
Lost Time 13.00 3.00
3.00 3.00;3.00 3.00 3.00:
Prop. Share; -1
-11 -1 -11 -1 -1
Prop. Prot.;
------------------------------------------------------
-2; -2; -2
-------------
Signal Operations
Phase Combination 1
2 3 4; 5 6
7 8
EB Left *
;NB Left
Thru *
Thru
Right
Right
Peds
Peds
WB Left
;SB Left
Thru *
Thru
Right *
Right
Peds
Peds
NB Right
;EB Right
SB Right
;WB Right
Green 30.OP
;Green 45.OP
Yellow/AR 5.0
;Yellow/AR 5.0
Cycle Length: 85 secs
Phase combination order: #1 #5
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 306 814 0.085 0.376 13.0 B 13.6 B
T 1147 3048 0.213 0.376 13.7 B
WB TR 1127 2993 0.280 0.376 14.1 B 14.1 8
NB LTR 1604 2901 0.279 0.553 7.7 B 7.7 B
.Intersection Delay = 11.2 sec/veh Intersection LOS = B
LostTime/Cycle, L = 6.0 sec Critical v/c(x) = 0.279
--------------------------------------------------------------------
M = = M
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
---------------------------------------------- --------------
Streets: (E-W) laprorte/ WALQU'r (N-S) college
Analyst: Matt Delich File Name:
Area Type: CBD 6-16-95 ai pm
C o m m e n t Ystin short
Eastbound Westbound Northbound Southbound
L T R L T R ; L T R L T R
--------f---- ---- ----I---- ---- ----f---
No. Lanes 1 1 1 1 1 1< 1 2< 1--2_-<---
Volumes ; 100 125 60; 20 45 201 70 270 55; 20 455 45
PHF or PK1510.95 0.95 0.95:0.95 0.95 0.95:0.95 0.95 0.9510.95 0.95 0.95
Lane Width :12.0 12.0 12.0112.0 12.0 :12.0 12.0 112.0 12.0
Grade i 0 0 0 - 0
% Heavy Veh; 1 1 1; 1 1 1; 1 2 1; 1 2 1
Parking I(Y/N) N ;(Y/N) N ;(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops 0; 01 01 0
Con. Peds 0; 0; 0; 0
Ped Button :(YIN) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Arr Type 3 3 31 3 3 3; 3 3 3; 3 3 3
RTOR Vols 0; 0; 0; 0
Lost Time :3.00 3.00 3.00;3.00 3.00 3.0013.00 3.00 3.00;3.00 3.00 3.00
Prop. Share; -1 -1; -1 -1; -1 -1; -1 -1
Prop. Prot.; -2; -21 -21 -2
--------------------------------------------------------------------- -
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * ; Thru
Right * Right
Peds ; Peds
WB Left * ;SB Left
Thru * Thru
Right * Right
Peds ; Peds
NB Right :EB Right
SB Right ;WB Right
Green 22.OP ;Green 6.OP 41.OP
Yellow/AR 5.0 ;Yellow/AR 5.0 6.0
Cycle Length: 85 sees Phase combination order: #1 #5 #6
Intersection Performance Summary
Lane
Group:
Adj Sat
v/C
g/C
Approach:
Mvmts
Cap
Flow
Ratio
Ratio Delay
LOS
Delay
LOS
EB
-----
L
----
366
-------
1297
-----
0.287
----- -----
0.282 18.2
---
C
-----
18.0
---
C
T
478
1693
0.276
0.282 18.1
C
R
406
1439
0.155
0.282 17.4
C
WB
L
286
1012
0.073
0.282 17.0
C
17.3
C
TR
456
1614
0.149
0.282 17.4
C
N8
L
389
1608
0.190
0.224 4.5
A
7.9
6
TR
1522
2941
0.236
0.518 8.6
8
SB
L
526
1608
0.040
0.224 4.2
-A
9.1
8
TR
1541
2977
0.358
0.518 9.3
B
Intersection
Delay =
11.2 sec/veh Intersection
LOS =
B
Lost
_______________________________________________________________________
Time/Cycle. L
= 9.0
see Critical
v/c(x)
= 0.349
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
---------------------------------------------------------------- ----------
Streets: (E-W) laporte/*A*x�=-tJACUI/"r (N-S) college
Analyst: Matt Delich File Name:
Area Type: C_BO 6-16-95 am m
C o m m e n short
--------------------------'-=____________-______________-______________
' Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
---- ---- --- I ---- ---- --- ---- --- ----
____ ____ ----
No. Lanes 1 1 1 1 1 < 1 2 < 1 2 <
Volumes 80 120 130: 75 95 40: 120 630 100: 45 560 75
PHF or PK15;0.95 0.95 0.95:0.95 0.95 0.95:0.95 0.95 0.95;0.95 0.95 0.95
Lane Width :12.0 12.0 12.0;12.0 12.0 ;12.0 12.0 ;12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 -1; 1 1 11 1 2 11 1 2 1
Parking �(Y/N) N i(Y/N) N :(Y/N) Y 20 ;(Y/N) Y 20
Bus Stops 0; 0; 0; 0
Con. Peds 0; 0; 0; 0
Ped Button ;(Y/N) N ;(Y/N) N ;(Y/N) N ;(Y/N) N
Arr Type i 3 3 3; 3 3 3; 3 3 3; 3 3 3
RTOR Vols 0; 01 0; 0
Lost Time :3.00 3.00 3.00;3.00 3.00 3.00:3.00 3.00 3.00:3..00 3.00 3.00
Prop. Share; -1 -1; -1 -11 -1 -1; -1 -1
Prop. Prot.; -2i -2; -2; -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds Peds
WB Left * ;SB Left
Thru * ; Thru
Right * Right
Peds Peds
NB Right ;EB Right
SB Right ;WB Right
Green 22.0P ;Green 6.OP 41.OP
Yellow/AR 5.0 ;Yellow/AR 5.0 6.0
Cycle Length: 85 secs Phase combination order: #1 #5 #6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- --- ----- ----- ---- ----- --- ----- ---
EB L 274 971 0.306 0.282 18.4 C 18.3 C
T 478 1693 0.264 0.282 18.0 C
R 406 1439 0.337 0.282 18.6 C
WB L 293 1038 0.270 0.282 18.1 C 18.3 C
TR 457 1617 0.311 0.282 18.4 C
NS L 307 1608 0.410 0.224 5.6 B 9.9 B
TR 1529 2954 0.527 0.518 10.6 8
S8 L 269 1608 0.175 0.224 4.9 A 9.7 B
TR 1534 2963 0.457 0.518 10.0 B
Intersection Delay = 12.0 sec/veh Intersection LOS = B
Lost Time/Cycle. L = 9.0 sec Critical v/c(s) = 0.499
_______________________________________________________________________
= = = = = = = r = = = = i = = = M
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
______________________________________________
Streets: (E-W) maple/jefferson (N-S) college
Analyst: Matt Delich File Name:
Area Type 6-16-95 a pm
Comment: ex lsting short -
------- ----- ----------------------------
----------------------'-__
Eastbound - Westbound Northbound Southbound
L T R L T R 1 L T R ; L T R
---- ---- - --------1--- ----I---
No. Lanes 1 1 1 > 1 1 1 2< ;. 1 2--<__--
Volumes 30 50 25; 30 75 2201 20 290 65: 330 515 20
PHF or PK15;0.95 0.95 0.95:0.95 0.95 0.95;0.95 0.95 0.95;0.95 0.95 0.95
Lane Width 112.0 12.0 12.01 12.0 12.0;12.0 12.0 :12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 11 1 1 4; 1 2 1; 4 2 1
Parking ;(Y/N) Y 20 I(Y/N) N ;(Y/N) Y 20 ;(Y/N) N
Bus Stops I 0; 0! 0; 0
Con. Peds 0;- 0; 0; 0
Ped Button ;(Y/N) N ;(Y/N) N ;(Y/N) N :(YIN) N
Arr Type 3 3 3; 3 3 3; 3 3 3; 3 3 3
RTOR Vols 01 0; 01 0
Lost Time ;3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00
Prop. Share; -1 -I; -1 -1; -1 -1; -1 -1
Prop. Prot.; -2; -21 -2; -2
-----------------------------------------------------------------------
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * Right
Peds Peds
W8 Left * ;SB Left
Thru * Thru
Right * Right
Peds Peds
NB Right ;E8 Right
SB Right ;WB Right
Green 26.OP ;Green 35.OP 29.OP
Yellow/AR 5.0 ;Yellow/AR 0.0 5.0
Cycle Length: 100 secs Phase combination order: kl 45 #6
_______________________________________________________________________
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS
----- ---- ------- ----- ---- ----- --- ----- ---
EB L 303 1083 0.106 0.280 20.3 C 20.3 C
T 474 1693 0.112 0.280 20.3 C
R 403 1439 0.065 0.280 20.1 C
WB LT 444 1584 0.250 0.280 21.2 C il.l 8
k 881 1398 0.263 0.630 6.3 B
NB L 148 477 0.142 0.310 19.0 C 21.0 C
TR 910 2936 0.431 0.310 21.1 C
SB L 677 1562 0.544 0.670 7.0 B 6.0 B
TR 2200 3333 0.269 0.660 5.4 6
Intersection Delav = 11.2 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 9.0 sec Critical v/c(x) = 0.483
_______________________________________________________________________
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 01-04-1980
Center For- Microcomputers In Transportation
---------------------------------------------------------------
_____________________________________________________
Streets: (E-W) maple/jefferson (N-S) college
Analyst: Matt Oelich File Name:
Area Type: C80 6-16-95 am pm
Comment(exlsting short
Eastbound Westbound Northbound Southbound
L T R ; L T R L T R L T R
---- ---- ----I---- ---------- --------1---- ---- ----
No_ Lanes 1 1 1> 1 1 1 2< 1 2
Volumes 25 55 40; 70 90 400; 40 620 70: 300 520 40
PHF or PK1510.95 0.95 0.95;0.95 0.95 0.95:0.95 0.95 0.95;0.95 0.95 0.95
Lane Width :12.0 12.0 12.01 12.0 12.0;12.0 12.0 :12.0 12.0
Grade 0 0 0 0
% Heavy Veh; 1 1 1; 1 1 4; 1 2 1; 4 2 1
Parking ;(Y/N) Y 20 I(Y/N) N ;(Y/N) Y 20 i(Y/N) N
Bus Stops I 0; 01 01 0
Con. Peds 0; 0; 0; 0
Ped Button ;(Y/N) N ;(YIN) N ;(Y/N) N ;(Y/N) N
Arr Type 3 3 3; 3 3 3; 3 3 3: 3 3 3
RTOR Vols 0; 0; 0; 0
Lost Time :3.00 3.00 3.00:3.00 3.00 3,00:3.00 3.00 3.00:3.00 3.00 3.00
Prop. Share; -1 -1; -1 -11 -1 -1; -1 -1
Prop. Prot.; -2; -2; -2; -2
_______________________________________________________________________
Signal Operations
Phase Combination 1 2 3 4; 5 6 7 8
EB Left * ;NB Left
Thru * Thru
Right * ; Right
Peds Peds
WB Left * :58 Left '
Thru * ; Thru
Right * Right
Peds ; Peds
NB Right ;E8 Right
58 Right :WB Right
Green 26.OP ;Green 27.OP 47.OP
Yellow/AR 5.0 ;Yellow/AR 0.0 5.0
Cycle Length: 110 secs Phase combination order: #1 N5 N6
-----------------------------------------------------------------------
Intersection Performance Summary
Lane Group: Adj Sat v/c g/C Approach:
Mvmts Cap Flow Ratio 'Ratio Delay LOS Delay LOS
----- ---- ------- ----- ----- ----- --- ----- ---
EB L 206 808 0.126 0.255 24.0 C 24.0 C
T 431 1693 0.135 0.255 24.1 C
R 366 1439 0.115 0.255 23.9 C
WB LT 374 1470 0.452 0.255 26.9 0 19.1 C
R 699 1398 0.602 0.500 16.0 C
N8 L 198 445 0.212 0.445 14.3 8 17.6 C
TR 1324 2972 0.576 0.445 17.8 C
SB L 438 1562 0.721 0.464 19.7 C 9.9 B
TR 2292 3318 0.270 0.691 4.9 A
Intersection Delay.= 15.4 sec/veh Intersection LOS = C
Lost Time/Cycle. L = 9.0 sec Critical v/c(x) = 0.625
_______________________________________________________________________
�J
1
i
1
APPENDIX B
u
II
CITY OF FORT COLLINS TRAFFIC ENGINEERING
Site Code : OND0020 PAGE: I
,v-S Street: COLLEGE AVE. - FILE: 20-I1-89
E-W Street: KPLENEFFERSON
Weather : FAIR Noveaents oy: Primary DATE: 11/07/89
PEAK PERIOD ANALYSIS FOR THE PERIOD: 1:30 AN - 08:30 AN
DIRECTION START- PEAK RR ........... VOLICIES ........... ...... PERCENTS .......
FROM PEAK HOUR FACTOR PEDS Right Thru Left Total PEDS flight Thru Left
North 7:30 AN
0.87
. 5 17 458
342 BIT -
2 55 42
East 7:10 AN
0.90
2 195 72
27 294 -
66 24 9
South 7:30 AN
0.90
0 57 254
19 330 -
17 71 6
West 7:30 AM
0.64
0 5 31
10 46 -
11 51 22
Entire Intersection
North 7:10 AM
0.87
5 17 458
342 BV -
2 55 42
East
0.90
2 135 72
27 294 -
68 24 9
South
0.90
0 57 254
19 330 -
11 77 6
West
0.64
0 5 31
10 45 -
11 57 22
'
COLLEGE AVE. ' ..;
N
W+E
459 ..
[PEDS ] 5 17
s
458 342
............
2 [PEDS ]
....
..............
—
817
—
195
.......... 108
..................
;
... MAPLE/JEFFERSON
294
72
10
—
—
27
31
46
- MAPLE/JEFFEERSON ...
430 ..........
5
—
—
330 ..................
[PEDS ] 0
a
:............
19
�
254 57
0 [PECS ]
490 ..
..........
;
.
COLLEGE AVE.
Site Code : 00000020
r-i Strait: COLLEGE AVE.
E-W Street: MAPLE/JEFFEASON
Weather : FAIR
CITY,OF FORT COLLINS TRAFFIC ENGINEERING .
Novesents ay: Primary
PAGE: I
FILE: 20-11-89
DATE: 11/01/89
PEAK PERIOD ANALYSIS FOR THE PERIOD: 04:30 PM - OS:30 PM
DIRECTION START
PEAK F9 ........... VOLUXES ........... ......
PERCENTS .......
FROM PEAK NOVA
FACTOR PEDS Right Thru Left Total PEGS
Fight Thru Left
North 4:30 PH
0.92 2 14 460 2a8 762 -
2 60 38
East 4:30 PH
0.91 1 373 78 59 510
13 15 12
South 4:30 PM
0.ag 0 59 549 13 621
10 88 2
West 4:30 PM
0.66 0 11 52 13 82
21 63 16
Entire Intersection
North 4:30 PH
0.92 2 14 460 288 762 -
2 60 38.
East
0.91 1 373 18 59 510 -
13 15 12
South
0.89 0 59 549 13 621 -
10 all 2
West
0.65 0 II 52 0 a2 -
21 63 16
' COLLEGE AVE. ' '
N
W+E
' ..........
S
............
935 .. '
[PEDS ] 2 14 ; 460 288 :............:
� s
1 [PEGS I
f..................
..................
— 762 —
373
.......... 105
;
... MAPLE/JEFFEiRSON 510
78
13
— —
59
52
82 MAPLE/JEFFERSON ...
..399 ..........
17
— — 621 ..................
..................
•
[PEDS ] 0 ............: 13 549 59
0 [PEDS ]
536 .. ;
'I
..........
. COLLEGE AVE.
CITY OF FORT COLLINS
Site Cade : 00000019 PAGE: t
N-S Street: COLLEGE AVE. FILE: 19-11-09
E-N Street: LaPORTE AVE.
SUNNY SONNY/COOL Movements by: Primary DATE: 11/02/89
PEAK PERIOD ANALYSIS FOR THE PERIOD: 8:30 AM - 09:30 AM
DIRECTION START PEAK MR ........... VOLUMES ........... ...... PERCENTS .......
FROM PEAK HOUR FACTOR PED Right Thru Left Total PED Right Thru Left -
___—_---- _---___�__�____
North 8:30 AM 0.85 t 41 405 17 463 0 9 87 4
East 9:30 AN 0.82 6 15 39 18 72 8 21 54 25
South 8:30 AN 0.84 - 0 48 238 62 348 0 14 68 IR
Nest 8:30 AM 0.73 0 60 123 99 282 0 21 44 35
Entire Intersection
North 8:30 AM 0.85 1 41 405 17 463 0 9 87 4
East 0.82 6 15 39 18 72 8 71 54 25
South 0.84 0 48 238 62 348 0 14 68 18
Nest 0.73 0 60 123 99 282 0 21 44 35
COLLEGE AVE. 1.... N
____________ W_+_E
- ............8
.......
I. I.. . ...1
CPED 3 1 I 41 1 405 1 17 1............� 6 CPED 3
----_
.................. i �
.................. --- 463 ---- __ 15
.......... 142
... LaPORTE AVE. 72 39
—
__________________ ; ______—__—________
99 -- — 18
123 282 LaPORTE AVE. ...
------------
------------ ; ..................
1 188 .....
60 __ _—_ 348 ____ ..................
------------ p.__________________
CPED 3 O 1............: 62 1 238 1 48 1 O CPED 3
.. 483
COLLEGE AVE.
CITY OF FORT COLLINS
Site Code : 00000019
N-S Street: COLLEGE AVE.
E-N Street: LaPORTE AVE.
SONNY SONNY/COOL
-
Movements by: Primary
PEAK PERIOD ANALYSIS FOR THE PERIOD: 05:30 PM - 06:30 PM
DIRECTION
START
PEAK MR
........... VOLUMES ...........
...... PERCENTS
.......
FROM
PEAK HOUR
FACTOR
'v
PED Right Thru Left Total
PED Right Thru Left
North
5:30 PM
0.91
7 66 515 37 610
1 II^
B3
6
East
5:30 PM
0.87
9 27 . 83 64 174
5 16
48
37
South
5:30 PM
0.84
0 89 557 104 750
0 12
74
14
Nest
5:30 PM
0.88
I 130 117 76 323
0 40
36
21
Entire Intersection
North
5:30 PM
0.91
7 66 515 37 618
1 11
03
6
East
O.87
9 27 83 64 174
5 16
48
37
- South
-
0.64
0 89 557 104 750
0 12
74
14
_ Nest
0.08
l 130 111 76 323
0 40
36
24
COLLEGE AVE.
N
............
B
:. •660
...
CPED
3 7
66 1515
1 37 �.............
9
CPED 3
------------------
- ..................
---
618 ----
--
27
..........
.................
253
;------------
PORTE
-..—La------AVE.—_
174
83
i
76
--
'—
_____—______-
64
PAGE: I
FILE: 19-I1-89
DATE: 11/02/99
117 323 LaPORTE AVE. ...
------------
------------
...........
243 ..........
130 -- ___ 750 __—_
____________* I ..................
__________________
CPED 3 1 1............: 104 1 557 89 0 CPED 3
709 ...,
. ..; COLLEGE AVE.
MATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY O F VEHICLECOUNTS
Oommer Date 6L5 9 Dal,- I A City r r OC'i l2oLLIq S R = Right tum
INTERSECTION OF M'Q SON .27-Iffe6;"7r AND LA 'T Fsgm
L=Lott �oum
TIME
BEGINS
L1,A SOti.%
TOTAL
North
South
LA '?Of7G
LA �oKYG
East TOTAL
vvw
TOTAL
ALL
hem NORTH
from SOUTH
them EAST
them WEST
R
S
L
I Total
R
S
L
Total
R
S
L
Tal
ot
R
S
L
I Total
730
z
zl
4
Z7
Z'7
z
25
27
S
(o
sl
7$
/or
745
4
z3
10
37
3-7
II
3Z
43
&0
$
(0 t
11 1
1 14 $
?(70
1
13
17
9
129
z4
1
z(,
z-7
48
T
5C0
$3
111z
$IS
4
zo
15
39
w 39
11A
z5
z4
45
T
53
$Z
141
730-840
1
1
13
38
132-
13z
1
101
1z(n
112
30
ZZ3
354
142,6
I
I
I
I
I
I
I
430
1
sR
zo
q4
4
3
sl
164
s3
7
6o
I 4
1 ZoB
44e
2Z
67-
30
114
11
2
1,1
43
53
7
(c0
103
1217
5.00
24
5
123
912
4
S
s
16>3
4&
4
S-o
113
ZI I
s/s
z
44
r7
o
0
4
Is40Z3
6a
sl
s
s(o
119
Zo
3a5'.o
III
zrSJ7013%
39(a
14
zo9z03
Z3
ZZ.(b
447
S4s
MATTHEW J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE COUNTS
Observer Date Z 9s Day r je(D 4 V CI1tyy Fo e T CO L L /A) S R = Right turn
,1
INTERSECTION OF A4 A '-' 0 � AND A4 A ` (' (- L Lotttt1t m
TIME
BEGINS
MASO"
TOTAL
South
A4APLE
PA I'(-
7�
West
AL
TALL
fmm NORTH
from SOUTH
fmm EAST
them WEST
R
S
L
Total
R
S
L
Total
R
S
L
Total
R
S
L
Total
7301
1
14
19
5"
28
ZS
1
z2
z3
ZI
o
zl
44
7Z
7 4$
Z7
17
40
44 0
Z-
35'
37
1
7,7
0
z '7
(D 4
1 1 o 4-
$00
IS
1(9
S
2(9
z(o
1
ZI
Z'4
I
z3
10
z3
45
7
815
60
ZL
17
34;"
3S
1
1 2
zz-
of
O
ZI
4C
1
7wE3o
z
'J4
IL4
I Z
! Z 9
s
l 2jo
7
z
o
2
14 31
13 Z 8
.II
I
IN
I
w
I
w
1
:O
7
5
1 (0
70
7 0
`E
130
1 59
14
3
/ 7
ss
1 /Z S
445
18
4
17
&3
65
117
131
1 34
I I
I
I Z
b-
113
SoU
3
6v
110
63
10
3
4'5
22
O
zZ.
S
/Z?
5/S
3
4
S
s'4
41
43
2i
z 3
7
t 317
436y2o
21
203
31
255
zyS
zL
141
1(97
G9
5
7 4
7.41
4-9 Co
J
APPENDIX A
VI. RECOMMENDATIONS
This study assessed the impacts of the Train Depot Rehabilitation
Project as city offices on the key streets and intersections in
this area of Fort Collins, Colorado. As a result of the analysis,
the following conclusions were drawn:
- The key intersections currently operate acceptably.
- The proposed Stormwater Utility Office is expected to generate
290 vehicle trip ends on an average weekday. It is expected
that 25 and 30 trip ends will be generated during the
respective morning and afternoon peak hours. Due to
interaction between the Stormwater Utility staff and other
city departments, many trips will be walk trips.
- The results of the intersection operational analysis indicate
that with development of the proposed Depot office building,
the key intersections will continue to operate at acceptable
levels of service.
- The alley area in this block will be enhanced to be pedestrian
friendly. This pedestrian area will also be designed to
accommodate occasional service vehicles.
- Based on the analysis in this report, no additional roadway
improvements are recommended to accommodate the site generated
traffic.
When/if other developments occur in this area, (i.e. County
Green and City Green), an area wide traffic study should be
performed.
7
V
Operational Analysis
TRANSPORTATION IMPACTS
Traffic analyses were performed using the peak hour traffic shown
in Figure 9. The results of these analyses are provided in Table
3. Calculation forms are provided in Appendix C. The results
indicate that the key intersections are expected to operate at
acceptable levels of service. The traffic related impacts from the
proposed Depot office building are expected to be minimal. The
Stormwater Utility Office is not a high generator of vehicle trips.
Peak hour travel is primarily related to employees. Non -peak hour
travel (8:30 AM to 4:00 PM) is related to meetings either at this
facility or employees going to other locations. Due to the
proximity to other related city departments, many of these trips
will be walk trips. This particular city department is not a high
generator of general citizen visits.
The block bordered by Mason, La Porte, Maple, and College is being
designed to be pedestrian friendly. The Depot building development
is integral in that concept. The north/south alley will provide
a spine to the pedestrian circulation. The pedestrian area will
need to accommodate occasional service vehicles, but this should
not be detrimental to pedestrian use. Convenient pedestrian
connections to both Mason Street and College Avenue will enhance
circulation in this block.
Table 3
Short Range Intersection Operation
■
Level
of Service
Intersection
AM
PM
(signal)
B
C
College/Maple/Jefferson
'
College/La Porte/Walnut (signal)
B
B
La Porte/Mason (signal)
B
B
Mason/Maple (stop sign)
EB LT
B
B
EB T
A
B
WB T
A
B
WB RT
A
A
NB LT
A
A
Mason/Site Access (stop sign)
WB RT
A
A
6
i
M O
� \\
\o o 225/410
N n M
5/35 /
80 95
f 110/150 MAPLE 15/15 + /--- 35/75
1005 10/10 5 O 55/60 -
o �o n Ln 30/50 -� Lo \o
M G M N O 1
O
Y
Y
Z Site w
O
5/20 %j U
o�
C-, \
� -
00
00 0
\'n \ \- 20/45
35/40 CDv o — 50/100
135/255 LA PORTE + - 21/11
3Y30 f 105/85 -� }
235 225 — o N o 130 125 ---- N v o
�� 65/135 -
a,)O Wnoo
rnLO napto
N
AM / PM
Rounded to the Nearest
5 Vehicles.
1997 TOTAL PEAK HOUR TRAFFIC
Figure 9
5/31
107/148
5/5
97/71—�- M O N
�
co fl N
co
— 26/36
-133/255
31/26
235/224 cj � o
AM / PM
LA PORTE
o m
M O
� M
��
L
22408
77 92
j �l
- 31 /71
31/26
51 /56 Nrl
26/41 o
N to
CN
N
rn
U \-- 20/41
o UD
4-N — 46/97
20/77
102/82
r
128/122 -
Nn c-4I
61/133
�to
nLn
N
N
1997 BACKGROUND PEAK HOUR TRAFFIC Figure 8
NOM./2
2/NOM. ) I
N N
3/1
0
C�
MAPLE /� 5/t
N N
+
--1 /NOM.
2/NOM.
I
1 /4
NOM./2
1/%-
0 0
\
Z Z
N
rirrin�rr,
Site
AM / PM
0
0
N � Z
LA PORTE �.
1/NOM.
rl) O
N
N
SITE GENERATED PEAK HOUR TRAFFIC
Figure 7
0
N
I
Lo
II
I II I
I II I
MAPLE STREET
W
t �
I W
-- >
Si e l
_-� J
J
V
Lo
to
I
b\
a
Lo
ZO
A&
N
NO SCALE
TRIP DISTRIBUTION
Figure 6
I
I
IV. TRAFFIC PROJECTIONS
Trip Distribution
The overall directional distribution of the site generated traffic
was determined based on the location of the site within the City
of Fort Collins. The overall trip distribution used in the
analysis of this report is shown on Figure 6.
1
Traffic Assignment
Traffic assignment is how the generated and distributed trips are
expected to be loaded on the roadway network. The site generated
trip assignments are shown on Figure 7.
Background traffic for the area was developed using the existing
peak hour traffic volume data, depicted earlier on Figure 5. The
year 1997 was selected as the analysis year. It is expected that.
the building would be occupied some time in 1996. The year 1997
background traffic was developed by factoring the existing through
traffic volumes by 1 percent per year. A one percent per year
increase was used since recent historic traffic counts indicate
very low traffic increases on these streets in the central area of
Fort Collins. The resulting year 1997 background traffic is shown
on Figure 8.
The site generated traffic was combined with the background traffic
to determine the total projected traffic in the study area after
completion of the proposed project. The resulting total traffic
projections are provided on Figure 9.
Long range (year 2015) traffic forecasts are not included in this
study. Conversations with city staff indicated that a number of
potential public sector developments (County Green and City Green)
would have considerable area wide transportation impacts in this
area. When/if those developments are proposed, an area wide
traffic study should be prepared.
1.
1
I
J
5
a
III. TRIP GENERATION
Trip generation characteristics, compiled by the Institute of
Transportation Engineers in their report entitled Trip Generation,
5th Edition and updated February 1995, were applied to the proposed
M office use in order to estimate the daily, and morning and
afternoon peak hour vehicle trips ends. A vehicle trip is defined
as a one-way vehicle movement from a point of origin to a point of
destination, with an origin or destination being at this site.
. Land use code 730 (Government Office Building) was used with the
number of employees as the independent variable. The afternoon
peak hour trip rates were determined using relationships between
land use code 730 and land use code 710 (General Office Building).
Table 2 illustrates the projected daily, and morning and afternoon
peak hour traffic volumes generated by the proposed project.
1
Table 2
Trip Generation
Daily A.M. Peak P.M. Peak
Land Use
Trips Trips Trips Trips Trips
in out in out
Government Office Bldg. 290 21 4 5 24
24 Employees
4
an acceptable level of service is typically defined as Level of
Service D or better (LOS A, B, C, or D).
Table 1
1995 Intersection Operation
Level of Service
Intersection AM PM
College/Maple/Jefferson (signal) B C
College/La Porte/Walnut (signal) B B
La Porte/Mason (signal) B B
Mason/Maple (stop sign)
EB LT A B
EB T A B
WB T A B
WB RT A A
NB LT A A
3
N
00
N S
O t7
4-
Lo
220/400
/
�N ro to
f-75/90
f 105/145
MAPLE
10/10
+
f— 30/70
5 5
f r
5/10
30/25 -
I
95 70
to to to
to to
50 55 —
o 0
"
om
25/40
t i� t i
c V t n N
t
o
N O to
co
T
N
W
zi 0
O w
m J
Q J
U
to to
25/35 LO to
— 130/250 r ` '**-- 5/20
30/25 —f ) } r 5/10
230 220 rn Lo C3
� 00
0
to
�-- 20/40
"'45/95
LA PORTE
+ �
/� 20/75
100/80
t
125/120
o
60/130
�r�
N
AM / PM
Rounded to the Nearest
5 Vehicles.
1995 BALANCED PEAK HOUR TRAFFIC Figure 5
N
1989
1995 1995CD00
�— 195 313
'' 'o - 72 78
102/141 MAPLE t o/t o + /-- 27/59
92Y5 I 5/8 30%513
2
NON -� 5/17� Q'v i
on N
i
Z
co
a
18/14
--108/209
3Y23
198 203 ei
\N
00\M
� Do
1995
AM / PM
5/19
1989
'o�-15/27
39/83
LA PORTE /`-18/64
I roll
99/76
123/117 a
60N
/130—�
1995
RECENT PEAK HOUR TRAFFIC Figure 4
CHERRY STREET
I
I II I
II I
I I
1 I
MAPLE 4TREET
UI o
H Of o ❑
wEli�
I
� y
o w
a 3
0 0
Z =
_ m
U Z I 101
LA PORTE AVENUE
W. MOUNTAIN AVENUE
PRIMARY STREETS
�4116.
N
NO SCALE
iI rld ��r�11■11�'lll
281
�F9
IN.
COLLEGE,
z
w
TRAIN
,
w
DEPOT
'
w
J
--�
-
_
I I
I
M
i
O
a
I Il
1�lm
Figure 3
I
tII. EXISTING CONDITIONS
Existing and Future Street System
Within the study area (Figure 3), the following roadways would
carry traffic to and from the proposed project: Mason Street, La
Porte Avenue, Maple Street, and College Avenue. A brief
description of each of these roadways is provided below.
Mason Street is the northbound half of a one-way couple (with Howes
Street). Mason is striped to accommodate two travel lanes. There
is a railroad track in the center of Mason Street that separates
the travel lanes. There is a traffic signal at the Mason/La Porte
intersection.
La Porte ! Avenue is an east/west street with two travel lanes in i each direction. There are left -turn lanes at a number of street
•and driveway intersections along La Porte Avenue. In addition to
the signal at Mason Street, there is a signal at the College/La
Porte intersection.
Maple Street is an east/west street with one travel lane in each
direction. There is a traffic signal at the College/Maple
intersection. Maple Street has stop sign control at Mason Street.
College Avenue is a north/south arterial street with two travel
lanes in each direction. There is diagonal parking on both sides
and in the center of College Avenue. There are auxiliary turn
lanes at most street intersections along College Avenue.
Existing Intersection Operations
Peak hour traffic counts were conducted at the Mason/La Porte and
Mason/Maple intersections in June 1995. Counts were also obtained
at the alley intersections. Trafficcounts were obtained from the
City of Fort Collins at the College/La Porte and College/Maple
intersections. The counted peak hour traffic is shown in Figure
4. Raw traffic counts are provided in Appendix A. The peak hour
traffic shown in Figure 5 was balanced to reflect 1995 conditions.
The signalized. and unsignalized intersection analysis techniques,
as published in the Highway Capacity Manual by the Transportation
Research Board in 1994, were used to analyze the key intersections.
These techniques allow for the determination of the intersection
level of service based on delay of each traffic movement.
The intersection levels of service for the Figure 5 traffic
conditions are provided in Table 1. The analysis worksheets are
provided in Appendix B. As shown in Table 1, the key intersections
currently operate at acceptable levels of service. In urban areas,
W
m
0
z
SITE PLAN
MAPLE STREET
A&
N
NO SCALE
Figure 2
0
I PTI.
1959263
, f r Z a
49
77
North Yards
ray„P TRAIN DEPOT' Ugar
REHABILITATION PROJECT Refinery in
�L7
Q U L I LIJI, D
oll -4,
10-
U
DUE
MIA w
F7F
Zia
DIE m
[Ell
wj ::-z SEtwage
-E].' EMEJ :CPO
Mposal
J.-
BM4954,,
o, SMTE
UNIVL-17
U
4�
N
Unr[
�E
NO SCALE
SITE LOCATION
Figure 1
I. INTRODUCTION
This traffic impact study addresses the capacity, geometric, and
control requirements associated with the Train Depot Rehabilitation
Project on Mason Street in Fort Collins, Colorado. The site
location is shown on Figure 1.
Site Location
The site is located on Mason Street between La Porte Avenue and
Maple Street. The study area to be examined in this traffic impact
analysis encompasses the following intersections: Mason/La Porte,
Mason/Maple, College/Maple, and College/La Porte. Operation at the
access driveway was also evaluated.
Existing and Proposed Land Uses
The project site currently has an historic building that is
vacant. The proposed project entails rehabilitation of the
existing building and an addition. The building will be an office
use, comprised of 9800 square feet. The building will be occupied
by the Fort Collins Stormwater Utility. It is anticipated that the
project would be completed in the year 1996. Figure 2 shows a site
plan of the Train Depot area.
Site Access
Access for the Depot building is proposed primarily from Mason
Street. It is proposed that a parking lot would be improved to the
west of 281 North College (other City offices) with access via the
existing alley to Maple Street, also. A primary feature of the
Depot rehabilitation is provision of pedestrian access through the
interior of this block. Pedestrian access will primarily be north/
south, with a connection to College Avenue between 281 North
College and a proposed car wash to the east of the Depot.
1
I
1
1
TRAIN DEPOT REHABILITATION PROJECT
SITE ACCESS STUDY
FORT COLLINS, COLORADO
JUNE 1995
Prepared for:
Aller, Lingle Architects, P.C.
748 Whalers Way, Bldg. E, Suite 200
Fort Collins, CO 80525
I
Prepared by:
MATTHEW J. DELICH, P.E.
3413 Banyan Avenue
Loveland, CO 80538
Phone: 970-669-2061
FAX: 970-669-5034
III