HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSFILE
July 25, 1997
Brian Shear
Shear Engineering Corporation
4836 S. College, Suite 12
Fort Collins, CO 80525
Re: Hearthfire P.U.D., 2nd Filing, plan review
Dear Brian:
This letter is in response to the District's review of utility plans for the Hearthfire P.U.D., 2nd Filing.
1 have reviewed the sanitary sewer portion of the design drawings and have found that you have again
developed a soundly designed sewer collection system. The only problem that I have found lies in the
indication on the drawings that several sewer service lines will be connected directly into collector
system manholes. The District does not permit the connection of service lines directly to manholes.
Service lines must be connected to the sewer collector lines at locations outside of manholes.
In the cases where regular service line connections via tap saddles on collector lines are not practical
downstream from the manholes, I would suggest that you consider extending short collector lines
upstream from the manholes to accommodate regular tap saddle connections. Such short extensions
might be approximately ten feet in length and closed at the upstream ends with plugs. In any event,
provided this minor problem with connections in manholes is resolved, I will sign approval for the
District's Engineering review.
As ( 1+clie ,p \NP have digt�;;ccad nrevinv!ly in regard to the 1st Filing, the District can not grant final
approval for construction until a contract is in effect between the District and the Project Owner.
Please do not hesitate to call me at 407-8161 if there is anything I can do to help expedite the project.
Sincerely,
Michael T. Carr
District Engineer
wp .nl 20797.itt
P.O. Box 1518 - 2217 Airway Ave. x3 • Fort Collins, Colorado 80522
Phone (970) 498.0604 • Fax (970) 498-0701