Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - CORRESPONDENCE - (12)PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: July 17, 1997 DEPT: Boxelder PROJECT: #31-95E Hearthfire P.U.D., 2nd Filing (LDGS) Final PLANNER: Leanne Harter All comments must be received no later than the staff review meeting: Wednesday, August 13, 1997 See attached letter re: Boxelder Sanitation District comments. Date: W. Dean Smith, General Manager CHECK HERE IF YOU WISH TO RECEIVB COPES OF REVISIONS —Pig _ Site _ h* RV_ Oler G/ UWq _ Rdme U0 _Inds*City of Fort Collins 9. The sump inlets on Buntwing Ct. and Pondview Ct. are not sized for the 100-year flow. Please check the overflow of the sidewalks for the 100-year flows. The spill depth and spread should be checked. Please provide cross -sections of the spill locations and calculations for the spills. RESPONSE: Please see redlined plans and report for additional comments. W PROJECT CONLMENT SHEET City of Fart Collins Current Plannina DATE: DEPT: Stormwater Uti3ity PROJECT: H E4 Z I ri --I� �� U. � Z� 1r1J C 1. The submitted plans do not have the level of detail required for a final submittal. Important details, such as detailed grading, pipe sizes, and the proper scale, are not provided. Please provide utility plans and drainage report that include all required details for a final submittal. Please refer to the final check list for items that need to be provided. The following comments are offered based on the information provided. Additional comments may arise once more information is provided. RESPONSE: 2. A SWMM analysis is needed for the entire Hearthfire PUD. After further review of the First Filing, it was determined that this development needs to be analyzed using SWMM. The size of the development, the routing of off -site flows through the site and the interaction of the two wetland ponds are reasons that a SWMM analysis is needed. The modeling must be completed with the Second Filing drainage report and should include both the First and Second Filings. The modeling will not delay the approval of the First Filing. RESPONSE: Date: ;i ' Cc; ;11i.io C,OrJLGY EREIF YOU.WISH TO RECEIVE COPIES OF RE' ONS �" 1-1n5 ri �'_e � C' iLl /� It j ✓Rea1me iky �� V0 /wFjNAIO �QI city of Fort Collins Sanitary Sewer Plan and Profile: 1) Show all utility crossings in profile view 2) Manholes are mislabeled on sheet 3. 3) Show pipe type and lengths in plan view. 4) Show scale in plan view. 5) Need to show sewer line between manholes 13-10 and B-9. 6) Maximum line lengths between manholes is 400', which exceeded between manholes F-15 and F-14 and between manholes F-14 and F-13. Street Plan and Profile: 1) All intersections need spot elevations per standard details D-18 and D-19. 2) Show crosspans in profile. 3) Show matchlines in plan view. 4) Access ramps are needed for the emergency access between lots 21-22 and 42-43. 5) Show flowline profiles for Ingle Ct. and Buntwing Ct. Master Grading and Erosion Control Plan: 1) Landscaped berm shown on Final Site plan should be shown on the grading plan. 2) Modify grading in the sight distance easement to provide adequate sight distance. "For additional comments, see redline utility plans" PROJECT COMMENT SHEET City of Fort Collins Current Plannint DATE: 12 August, 1997 DEPT: Engineering PROJECT: #31-95E Hearthfire P.U.D., 2nd Filing (LDGS) Final PLANNER: Leanne Harter ENGINEER: Michael Coley All comments must be received by: 8/13/97 No Problems Problems or Concerns (see below or attached) Cover Sheet: 1) Need storm sewer plan and profile sheets. Plat: - 1) Need statement of ownership / maintenance and easement dedication for all tracts. 2) A sight distance easement is needed at the corner of Ingle Ct. and Towncenter Dr. 3) 6' rear lot easements are needed in several locations. 4) Several easements shown on the Finl Site Plan are not shown on the plat. 5) The portion of Tract D located behind lots 45 and 46 is 20' on the plat and 25' elsewhere. Overall Utility Plan: 1) Label all waterlines, sanitary sewer lines, easements, tracts, and lots. 2) Show all storm drainage facilities, referenced BM location, and easements. 3) Show all features within 150' of project boundaries. 4) A design of the portion of County Rd. 13 which fronts your property needs to be shown. Comments continue on next sheet Date: �' / i 2- / cl 7 Signature: PLEASE SEND'COPIES OF MARKED REVISIONS: 0--/' PLATS 0— SITE 0� UTILITY 0- LANDSCAPE PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: July 17, 1997 DEPT: ELCO PROJECT: #31-95E Hearthfire P.U.D., 2nd Filing (LDGS) Final PLANNER: Leanne Harter All comments must be received no later than the staff review meeting: Wednesday, August 13, 1997 PL-A-" C Date: «1 Signature: CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONSda Mk _ PIS _ Sid _Dfi* RVgyp — �� UbI _ Rde U""'J - IM""* City of Fort Collins ♦ Wetland disturbance and mitigation measures will be resolved at time of final PUD review. Wetlands to be disturbed will be replaced at a rate of 1.5 to 1. The ultimate disposition of the wetland pond area will need to be resolved with the final PUD through submittal of a detailed plan for the area. Preliminary PUD approval does not imply that modification of the wetland area is acceptable to City staff. (This condition might have been satisfied with the 1 st filing. Please contact the City's Stormwater Utility and Natural Resources Department do verify whether additional work is required for the 2nd filing.) ♦ Concurrently with submission of final PUD documents, the developer shall submit a detailed study based on the final plan and engineering, analyzing the effects of urban runoff into the wetlands and ultimately into Richard's Lake, along with an adequate mitigation plan to deal with negative impacts if needed. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please provide a written response to each of the above stated comments with the submittal of plan revisions. Please contact me at 221-6750 if you have any questions or concerns that are related to the comments. If you would like to schedule a meeting, please call me as soon as possible As you are aware, the City of Fort Collins Current Planning Department recently implemented a new development review process. Under that new process, revisions may be submitted at any time.. With the submittal of revisions, please include the enclosed redlined plans. Please contact me for the number of revisions required. Sincerely, 6�l 444,w Leanne A. Harter, AICP City Planner xc: Mike Coley Shear Engineering File/Project Planner a) The plat must show the specific lot areas, not a +/- estimate. 8. The Police Department stated that Ingle Court needs to be renamed as sound -a -likes already exist and one of the Buntwing Courts must be renamed. 9. Please see the attached letter from the Larimer County Engineering Department. 10. The Light and Power Utility offered the following comments: a) The "paired" water service locations need to be coordinated with Light and Power plans prior to construction of the water system. Some water service locations may need to be relocated if they conflict with electric facilities (vaults or streetlights). b) Street trees will need to maintain minimum clearances to streetlights (if any). The clearances are 40' to shade trees and 20' to ornamentals. 11. Traffic Operations offered the following comments: a) An updated traffic study must be submitted that addresses the issues - associated with the additional access points, including the number of daily trips on Buntwing Court and the increase volumes of County Road 13 that may be attributed to this access. b) Please provide a schedule for the phasing of roadway improvements. c) Has the issue of site distance been addressed at the corner of Abbottford and Gregory? d) It will be necessary to track the number of dwelling units prior to the collector to County Road 11. 12. The Mapping Department offered the following comments: a) Right-of-way cannot be dedicated by annexation. b) Please show the arc distance included in the curve table. 13. The Current Planning Department offered the following comments: a) Three conditions were placed on the Preliminary PUD approved for Hearthfire, and these need to be met, including the following. These criteria must be met for the final to be in substantial compliance with the approved preliminary plan. ♦ The developer shall submit plans for all off -site improvements and the improvements required to County Road 13 with the final PUD utility plans. Commu y Planning and Environmental rvices Current Planning City of Fort Collins 20 August 1997 Richard's Lake Development Company c/o Jim Sell Design, Inc. Tom Dugan 153 West Mountain Avenue Fort Collins, Colorado 80524 Dear Tom: City staff has reviewed the Hearthfire P.U.D., 2nd Filing, Final, #31-95E submittal and would like to offer the following comments. ELCO offered the following comments: a) No detailed plans of the water system improvements were provide. b) For additional comments, see the general comments on the master utility plan attached. 2. For comments from the Transportation Planning Department, please see the attached site plan. 3. Comments from the Engineering Department are attached. 4. Comments from the Stormwater Utility are attached. 5. The Natural Resources Department offered the following comments: a) The limit of proposed grading and construction needs to be clearly delineated on the site plan. b) The "native dryland grass" mixture must be clearly specified on the landscape plan, and it should be composed of grass species that are truly native to the area. c) Please show the wetlands created with the first filing as mitigation for the wetlands disturbed on this filing on the site plan. 6. Please see that attached letter from the Boxelder Sanitation District. 7. The Zoning Department offers the following comment: 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6178 • TDD (970) 224-6002