Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - CORRESPONDENCE - (8)currently under construction. Prior to the resubmittal, these areas will be shown on the 2"d Filing site plan. 6. Larimer County comments included the request for a copy of the wetland mitigation report. A copy has been sent to the County. Also, as discussed above, the design of County Road 13 has begun and should be completed at resubmittal. 7. Mapping Department stated that the right-of-way cannot be dedicated by annexation. This right-of- way has been dedicated to the City by a separate document and we are awaiting the approval by Larimer County on the Jewitt Amended Exemption before submitting to the City for annexation of the right-of-way. This also includes the annexation of County Road 13 into the City. 8. Current Planning comments have been addressed as follows: a. The plans for County Road 13 have been prepared by the civil engineer and are 95% complete. b. Wetland mitigation measures including the preparation of the mitigation plan which replaces disturbed wetlands at a rate of 1.5 to 1 have been satisfied with the approval of the 1 Filing. As noted above, these mitigated areas are soon to be constructed as part of the V Filing and the revised site plan will show the areas where wetlands were created to compensate for lost wetlands in the 2"d Filing. c. A detailed plan and report which analyzed the effects of urban runoff into the wetlands and Richard's Lake was submitted and approved by staff as part of the 1" Filing approval. Again, this was after the comments for the 2"d Filing were prepared by staff. 9. As a requirement of a subdivision plat and per state statute, Frederick Land Surveying has monumented the boundaries of the plat limits for the 2"d Filing since the August staff comments. 10. During the design and the construction of the sanitary sewer, water mains, electric, phone and gas distribution systems for the I" Filing, we have worked with the utility companies to have these facilities sized accordingly to accommodated the 2"d Filing and these services will be stubbed to the property line between the 1' and 2"d Filings during construction. Bob, although there has not yet been a resubmittal of the 2"d Filing, as you can see there has been significant work done to address the staff comments and with the construction of the 1 n Filing, all improvements have been sized to accommodate the future phase. A final note is that the Developer completed the purchase of the entire Hearthfire PUD property (Filing I & 2) as well as the 35 acre parcel to the North in October of 1997 with every intent to complete the development of both phases within the next 3 to 4 years. We will continue to address the staff comments and revise the plans as necessary and hopefully within the next 90-120 days, resubmit the revised plans to the City. Please review this request and should you have any questions, feel free to give me a call at 226-1655. Sincerely, PipeCrest Min and Design LLC T u Principal cc: Kevin Gilligan, Brian Shear, Lucia Liley Hearthfire 2 Subm. 2 Pi»eCrest Pla»»i»g a»5 Desig» LLC Landscape Architecture. Lana Planning and Construction Management 4225 Westshore Way ♦ Fort Collins, CO 80525 (970) 226-1655 Fax (970) 226-1635 April 15, 1998 Mr. Bob Blanchard Current Planning Director City of Fort Collins 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 RE: Hearthfire PUD, Second Filing, Final, #31-95E Dear Bob: In response to your letter of March 20, 1998 to Mr. Jim Sell and our phone conversation regarding the Hearthfire PUD, 2' Filing, Final PUD application, the current owner, and developer Hearthfire, Inc., aka Richard's Lake Development Company, is hereby requesting that staff does not take this application to the Planning and Zoning Board at. this time: Although there has not yet beep a resubmittal;to the City, there has been numerous items related to staff comments which.have been addressed and several which were resolved with the fmal approvals of the I Filing approvals in December of 1997. These, include: .. 1. As you are aware, the 2"a Filing is the second phase of the Hearthfire PUD which was approved in 1996 and the I" Filing, Final was approved by the Planning and Zoning Board on January 26, 1997. 2. The Developer had concentrated on the final engineering approvals on the 0 Filing which were finalized with the signing of the Development Agreement on October 6, 1997 and the recording of the Plat on December 19, 1997. 3. The development construction of the I' Filing began in January of 1998 and it is the intent of the Developer to continue with the construction of the 2"d Filing once approximately 50% of the lots in the 1't Filing have been sold. 4. The civil engineer, Shear Engineering Corporation, has been working on addressing the comments from Engineering staff, ELCO, Boxelder and Stormwater Utility staff. These include: a. ELCO-completion of the water system improvements design to comply with the Districts regulations and comments. b. Engineering -have completed the storm sewer plan and profile sheets; have begun the design of County Road 13 adjacent to the property; all utility crossings have been identified and will be shown on the revised plans.. c. Boxelder-have revised plans to remove services from manholes. d. Stormwater Utility -have sized storm water pipes; a final drainage report for the.entire site had been.prepared and resubmitted as,part of the 151 Filing. This .included the 2"d Filing in order to be sure that all storm pipe in the 1' Filing was sized accordingly. After approval of this -final drainage report, staff agreed with the Shear -Engineering that a SWMM analysis was not necessary. This analysis, was prepared and approved ;after .the staff comments of 8/1,8/97 were prepared., Storm sewer plan and profile sheets have been completed. 5. Natural Resources requested that the wetlands created in the 1" Filing as mitigation for the 2"d Filing be shown on the site plan. These areas have been shown on the I' Filing site plan and are