HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - CORRESPONDENCE - (17)Staff has determined that the project is not yet ready to go to the Planning and Zoning Board for a decision due to outstanding issues. Another round of review is necessary. Under the development review process and schedule there is a 90 day plan revision submittal time -frame mandated by the City. The 90 day turnaround period begins on, the date of the comment letter prepared by the project planner in the Current Planning Department (in this case, 11/26199). Upon receipt, the revisions will be routed to the appropriate City departments and outside reviewing agencies, with their comments due to the project planner no later than the third weekly staff review meeting (Wednesday mornings) following receipt of the revisions. When it is ready to go to the Board a date will be scheduled for a public hearing, which would be held on the first or third Thursday of each month. Please submit the number of copies of the applicable documentation as indicated on the attached Revisions Routing Sheet and return all drawings red -lined by City staff with submission of all revisions you will make. You may contact me at 221-6750 if you have questions about these comments or would like to schedule a meeting to discuss them. Sin erely, Steve Olt Project Planner xc: Engineering Stormwater Utility Transportation Planning Natural Resources Zoning Shear Engineering Frederick Land Surveying Project File #31-95E Stormwater (Basil Hamdan) 17. An easement is needed.for the swale for the storm water transition from street flows to Richards Lake. 18. Show the grading on the utility plans. 19. The drainage flows crossing Douglas Road are not accounted for and shown on the utility plans. 20. Off -site easements are needed and they are not accounted for at this time. 21. Affected Ditch Company approval (and signature) is needed. 22. The utility plans are not yet sufficient for final approval. This development proposal is not ready to be scheduled for public hearing. Natural Resources (Kim Kreimeyer) 23. No additional comments at this time. Transportation Planning (Kathleen Reavis) 24. No additional comments at this time. Planning 25. Please be aware of the 90 day revision resubmittal.requirement (see paragraph .below) to keep this project proposal in the City's development review process. 26. A street connection from either Bateleur Court or Grosbeak Court to County Road 13 should be provided. The current plans show a 51' right-of-way for a future street from Bateleur Court to the country road. The City and the applicant should determine now if the street connection is necessary and, if so, the street should be constructed now with the Second Filing. Trying to complete the street connection in the future, after residents are in place, could be very difficult. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please contact Kathleen, at 224-6140, if you have questions about her comments. 7. A copy of the comments received from Donald Dustin of the Stormwater Utility is attached to this comment letter. Also, red -lined plans and reports, with additional comments, are being forwarded to the applicant. Please contact Donald, at 221-2053, if you have questions about his comments. 8. A copy of the comments received from Sheri Wamhoff of the Engineering Department is attached to this comment letter. Also, red -lined plans, with . additional comments, are being forwarded to the applicant. Please contact Sheri, at 221-6750, if you have questions about her comments. 9. A copy of the comment sheet received from Ron Gonzales of the Poudre Fire Authority is attached to this comment letter. 10. Bruce Vogel of the Light & Power Department stated that they have no concerns and comments at this time.. 11. Dean Smith of the Boxelder Sanitation District stated that they have no concerns and comments at this time. 12. Dennis Greenwalt of AT&T Cable Service stated that they have no concerns -and comments at this time. The comments and concerns were expressed at the weekly staff review.meeting of November 17, 1999: . Engineering (Sheri Wamhoff) 13. Phasing is being shown on the Site & Landscape Plan but not on the utility plans. These plans should be consistent with each other. Is the phasing for landscaping only? 14. Is the landscaping along the path between Lots 18 —. 22 really part of the First Filing? 15. Is the location and design of the emergency access off of County Road 13 acceptable to the Poudre Fire Authority? 16. The development plans are not ready to be scheduled for a public hearing (for a decision), primarily because of outstanding Douglas Road issues. C. This subdivision plat must show the recording information for Hearthfire Way and Hearthfire Drive that were shown and dedicated in the First Filing. d. The street names need to be approved by a City "naming committee" 4. Gary Lopez and Peter Barnes of the Zoning Department offered the following comments: a. Tracts 'B' and 'D' do not appear to be within any of the landscaping phases proposed in the Second Filing. b. Why are there very few trees proposed for any of the open space tracts? Except for an existing Cottonwood and 3 trees behind Lot 10, these areas separating the blocks are devoid of trees. More are recommended. C. It would be helpful if the phase lines were made darker and labeled so that they would be easier to see and follow. Please contact Gary or Peter, at 21-6760, if you have questions about these comments. 5. Kim Kreimeyer, the City's Natural Resources Planner, offered the following comments: a. A copy of a memorandum from Kim, regarding the Preble's Meadow Jumping Mouse Habitat Assessment, is attached to this comment letter. b. The species listed as "native seed mix" is not native. Please see the attached copy of the Fort Collins Native Plants brochure that is being forwarded to the applicant. Please contact Kim, at 221-6641, if you have questions about these comments. 6. Kathleen Reavis of the Transportation Planning Department offered the following comments: a. Provide a concrete path, not gravel, between the cul-de-sac at the end, of Bateleur Court and County Road 13. b. The longer trail off of the road at the curve between Country Road 13 and Inverness Drive should provide a concrete "apron" or flared area as the path approaches Country Road 13 so that gravel does not drag out onto that road. Comm, ty Planning and Environmental :rvices Current Planning City of Fort Collins November 26, 1999 Tom Dugan PineCrest Planning and Design, LLC 4225 Westshore Way Fort Collins, CO. 8.0525 Dear Tom, Staff has reviewed your revisions for Hearthfire PUD, Second Filing - Final that were submitted to the City on October 26, 1999, and would like to offer the following comments: 1. Mike Spurgin of the Post Office stated that they have no concerns or comments at this time. 2. Lori Digliani of Police Services offered the following comments: a. It appears that Grosbeak Court is a continuation of Hearthfire Drive and, therefore, should not have a separate street name. b. Buntwing Court and Bateleur Court are the same street and should have one name. Continuous straight line streets need to maintain the same name to decrease confusion. C. Town Center Drive makes a 90 degree turn. This will result in abrupt address changes for the same street. They are requesting a different street name when the street direction changes to this degree or higher for continuity in addressing. 3. The Mapping/Drafting Department offered the following comments: a. The subdivision plat and legal description do close. b. Information must be provided regarding the portion of Grosbeak Court shown to be ".....Dedicated by Separate Document'. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020