HomeMy WebLinkAboutPROSPECT PARK PUD - FINAL - 21-95A - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet
The following check sheet is to be used in the preparation of a complete submittal of a Final PUD
Plan: .
1. Application form -(I copy).
2. Filing fee ($110.00) plus $10.00 k
er page of the subdivision plat.
A� am�.
3. Site plan (25 folded copies).
4. Landscape plan (16 folded copies).
5. Final, subdivision plat (21 folded copies).
Final utility plans (10 unfolded copies).
7. Final drainage report and plans and grading plans (4 copies).
`�. Othe� documentation as determined by special circumstances.
4.16