HomeMy WebLinkAboutPROSPECT PARK PUD - PRELIMINARY - 21-95 - CORRESPONDENCE -The developer should be aware that the maximum points
under energy conservation will be evaluated by the
criteria of the Energy Conservation Worksheet at the
time of Preliminary.
D. If the minimum amount of points cannot be earned, then
two scenarios are suggested. First, the convenience
store is dropped thereby removing the project from the
auspices of the Neighborhood Convenience Shopping
Center and into the Business Services Point Chart.
Second, the developer applies for a variance to the
Planning and Zoning Board. Variances must be evaluated
by the criteria in the L.D.G.S.
E. It is suggested that a pre -submittal meeting be held
between the developer, City Staff, and the consulting
team prior to conceptual plans moving into the
Preliminary phase.
29. A neighborhood meeting will be required prior to any
submittal on the property. At your request, a map of the
geographical area to be notified will be prepared by our
office. The developer is responsible for providing the
names and addresses of the property owners of record within
this area. These names must be on self-adhesive mailing
labels, 33 labels per sheet. In order to conduct the
mailing, the Planning Department charges .50 cents per name.
Please allow sufficient time for map preparation and mailing
prior to the neighborhood meeting.
30. You are encouraged to meet with representatives of the
Prospect/Shields Neighborhood Association on an informal
basis at any time in the planning process to discuss
development concepts for the property.
23. Parking stalls that face Prospect Road will have to be
screened by a berm at a height that will, at minimum, screen
headlights.
24. The location of the drive -up banking facilities looks like
it will conflict with access to the gas pumps. The traffic
circulation in this area needs to be refined. Please keep
in mind that auto -dependent uses bear the burden of
mitigation through berming, landscaping, screening, etc. to
minimize impact on adjacent properties.
25. All buildings must demonstrate architectural consistency
through the use of common building materials and forms. The
use of a residential style is strongly encouraged. Pitched
roofs, brick exteriors/accents, brick canopy columns, and
other high quality exterior materials should be used
consistently throughout the center. Please pay close
attention to All Development Criteria A-2.7 of the L.D.G.S.
26. Please be aware that the City is beginning a sub area plan
known as the Prospect -Shields Neighborhood Plan. Teresa
Lucero is the project planner. A citizen advisory committee
is being formed. This planning process could take 12 to 18
months before final adoption by City Council.
27. The entire 6.27 acres must be planned as a Preliminary
P.U.D. None of the proposed uses will be allowed to submit
for Final P.U.D. until an overall Preliminary is approved by
the Planning and Zoning Board.
28. For the uses proposed, the project will be reviewed as a
Neighborhood Convenience Shopping Center and reviewed by
point chart J of the L.D.G.S. As such, there are some
important land use issues that are summarized as follows:
A. Banking within a Neighborhood Convenience Shopping
Center is allowed and defined as "limited banking
services such as automated teller machines." The
conceptual plan indicates a bank with drive -up
facilities which is more like a full banking service as
opposed to a limited banking service. Consequently,
the Planning and Zoning Board would have to make a
finding that full service banking, with drive -up, is
appropriate for such a center.
B. Although not indicated on the conceptual plan, please
be aware that drive-thru restaurants are not allowed in
a Neighborhood Convenience Shopping Center.
C. The overall (6.27 acres) Preliminary P.U.D. will be
required to score at least 65% on the Neighborhood
Convenience Shopping Center Point Chart. It is our
estimate that the project exceeds this score only by
earning the maximum credit for energy conservation.
15. A traffic impact analysis will be required. The developer
should be aware that the intersection is congested during
peak times. For the right-in/right-out access points,
medians will be required to control left turns. These
access points must also be designed with deceleration lanes
of the proper length and taper to meet the design speed and
projected traffic volumes on the arterials.. For further
information on the scope of the traffic study, please
contact Tom Vosburg, Transportation Planner, 221-6608.
16. There are transit stops adjacent to the property on both
arterials. -These stops must be considered in the traffic
study so that they do not interfere with the decel lanes and
yet remain out of the flow of through traffic. Internal
sidewalks should connect the transit stops to the buildings
within the center. Please coordinate with Transfort on
these issues.
17. A bicycle/pedestrian path should be constructed across the
wetland area to connect to North Woods Apartments and
Heritage Circle on the south. Non -vehicular access must be
provided to help reduce congestion on the two arterials.
The path should be wide enough to accommodate both bikes and
pedestrians. Sidewalks should be provided onsite to further
promote safety and convenience for alternative modes of
travel. All buildings in the center must provide bike racks
permanently anchored to concrete. Pedestrian connections
should also be emphasized to serve Stone Creek Apartments on
the west.
18. The Street Oversizing Fee for retail uses (including the
bank) is $14,005 per acre. The fee for the medical building
is $10,504'per acre. The fee is payable at the time of
building permit issuance.
19. With decel lanes, the perimeter sidewalks must be carefully
designed so that the pedestrian remains visible to the
motorist making the right turn into the center. Also,
onstreet bike lanes must be striped to give the bicyclist a
continuous through lane on the outside of the decel lane.
20. At the time of submittal fora Preliminary P.U.D., a Utility
Plan set will be required indicating preliminary design of
the public improvements (including the medians) necessary to
serve the site. At Final, a Development Agreement must be
executed between -the City and the developer obligating the
developer to construct the public improvements.
21. The property will have to be platted.
22. Lighting will be a sensitive issue in this area due to the
nearby residences. The P.U.D. will have to address the
details of parking lot and building lighting.
6. Any building that exceeds 5,000 square feet of uncontained
area must be equipped with an automatic fire sprinkler
system.
7. For the convenience store/gas pump operation, the Poudre
Fire Authority will require a Hazardous Material Impact
Analysis. For the underground tanks, a vapor recovery
system will be required. Installation of underground tanks
is regulated by'Poudre Fire Authority through a separate
permitting process. Please be aware that there are nearby
wetlands and the underground installation may need special
precautions. For further information, please contact Roger
Frasco, 221-6570.
8. The zoning is R-P, Planned Residential. Commercial and
retail development will have to processed as a Planned Unit
Development in accordance with the Land Development Guidance
System.
9. The property is located in the Residential Neighborhood Sign
District. Signage will be allowed according to this section
of the Sign Code. For further information on signage,
please contact Peter Barnes, 221-6760.
10. The carwash must be equipped with a sand and oil trap that
meets the specifications of the Water and Sewer Department.
11. The site is located in the Canal Importation Drainage Basin.
The Storm Drainage Fee in this basin is $6,181 per acre
subject to the runoff coefficient and the amount of
impervious surface. At the time of Preliminary submittal, a
Drainage Report, Drainage and Grading Plan, and Erosion
Control Plan must be submitted.
12. The area behind the existing berm can be filled. It is
unknown at this time whether onsite detention will be
required or not. If storm flows can beat the peak runoff to
the outfall, then onsite detention will not be required.
This determination must be verified by the developer's
consulting engineer.
13.. The area around the gas pumps, however, should be treated
differently. This area should not drain immediately to the
outfall in case of a spill. This area should be contained.
Runoff from this area should be filtered through pervious
surface or a gravel system. For further information on best
management practice to protect downstream areas from surface
runoff, please contact.Kevin McBride, Stormwater Utility,
221-6589.
14. There are sensitive wetlands to the south. These wetlands
must be protected.during construction. 'Erosion control must
be carefully addressed. Native plant material should be
used to complement the naturalistic wetland area.
CONCEPTUAL REVIEW STAFF COMMENTS
MEETING DATE: January 23, 1995
ITEM: Mullaney Property
Southwest Corner Prospect/Shields
APPLICANT: Mr. Ed Mullaney, Cushman & Wakefield of
Colorado, Inc., 410 Seventeenth Street, Suite
200, Denver, CO. 80202.
LAND USE DATA: Request for a mix of retail and office uses
on 6.27 acres located at the southwest corner of Prospect and
Shields. Potential.uses include a Payless Drugstore, Diamond
Shamrock convenience store with gas pumps and one -bay carwash,
medical office building (two-story), branch bank (two-story) with
drive -up facilities, and retail building.
COMMENTS:
1. The source for electrical power is on the south side of
Prospect Road. For each electrical service, an electrical
contractor should complete the Commercial One ("C-111) Form
to determine entrance capacity. Please refer to the handout
on electrical fees and charges. The location of the
electrical transformers must be coordinated with Light and
Power and screened from public view by landscaping or a
solid enclosure. Transformer must be within eight feet on
one side from hard surface for emergency change out. For
further information, please contact Doug Martine, 221-6700.
2. Three water mains are available to serve the site. There is
a 12 inch main in Prospect, a 12 inch main in Shields, and a
6. inch main on the west side of the property.
3. There are four sanitary sewer mains to serve the site.
There is a 15 inch main in Prospect, a 15 inch main in
Shields, a 24 inch main on the west, and a 24 inch main on
the south. If connecting to a 24 inch main, the tap must be
made at a manhole. For further information regarding water
and sewer services, please call Roger Buffington, 221-6681.
4. The carwash and convenience store will need separate water
and sewer services.
5. A new fire hydrant will be needed on the east side of the
site.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
Comm tv Planning and Environmental vices
Planning Department
City of Fort Collins
January 27, 19%C6;
Mr. Ed. Mullaney
Cushman & Wakefield of Colorado, Inc.
410 Seventeenth Street, Suite 200
Fort Collins, CO 80202
Dear Mr. Mullaney:
For your information, attached is a copy of the Staff's comments
concerning Mullaney Property, Southwest Corner of Prospect/Shields,
presented before the Conceptual Review Team on January 23, 1995.
The comments are offered informally by Staff to assist you in
preparing the detailed components of the project application.
Modifications and additions to these comments may be made at the
time of formal review of this project.
If you should have any questions regarding these comments or the
next steps in the review process, please feel free to call me at
221-6750.
sincTerely,
Ted Shepard, ICP
Senior Planner
TS/gjd
Attachments
cc: Transportation Department
Stormwater Department
Project Planner
File