HomeMy WebLinkAboutPROSPECT PARK PUD - PRELIMINARY - 21-95 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSNorthern Engineering Services, Inc.
June 5, 1995
Mr. Steve Olt
Community Planning and Environmental Services
City of Fort Collins
281 North College Avenue
PO Box 580
Fort Collins, Colorado 80522-0580
RE: Prospect Park PUD Preliminary
Response to City Comments
Dear Steve,
This letter is in response to City comments to the Preliminary submittal
of the Prospect Park PUD. I have contacted Roger Buffington with the
City of Fort Collins Water and Wastewater Department, and Kerrie
Ashbeck with City of Fort Collins Engineering Department regarding City
comments to the PrelVninary submittal for Prospect Park PUD, and they
both agreed that all of their comments could be addressed with Final
Design of this project.
I also contacted Basil Hamdan with the Stormwater Utility regarding
their comments. With the exception of the issue of the site encroaching
into an existing drainage easement, the remainder of their comments also
could be addressed with Final design.
Linda Ripley met with')ob Smith at Stormwater Utility regarding the
issue of encroaching in the existing easement. There Was no decision
made at that time about the encroachment. Bob anticipated having an
answer by Wednesday, June 7..Depending on the outcome, the site plan
will be adjusted accordingly prior to final design.
cerely,
Roger A. Curtiss P.E.
cc: Ed Mullaney
Linda Ripley
420 S. Howes • Suite 202 • Fort Collins, Colorado 80521 • (303) 221-4158 • Fax (303) 221-4159