Loading...
HomeMy WebLinkAboutPOUDRE VALLEY PLAZA PUD - PRELIMINARY - 30-95A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (3)Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 x xxxxx�xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxx Y'Kxxxx'1[<xxxxxxxxxxxxxzxxxxxxxxYxxxxxxxxxxxxxxxxYMx.Kxxxxx File Name ................ - Streets: (N-S) SHIELDS (E-W) ARBOR Major Street Direction.... _ NS - ,- WorkSheet for TWSC Intersection - Length of Time Analyzed... 60 (min) -------------------------------------------------------- Analyst................... MD - Step 1: RT from Minor Street WE ES Date of Analysis.......... Other Information......... 6/13/95 1998 2015 AM PM ________________________________________________________ Conflicting Flows: (vph) 364 Potential Capacity: (pcph) 906 Two-way Stop -controlled Intersection Movement Capacity: (pcph) 906 Prob. of Queue -free State: 0.95 Northbound Southbound ; Eastbound ; Westbound -------------------------------------------------------- L T RI L T R; L T RI L T R. Step 2: LT from Major Street .Se NB - ., ____ ---- :---- ____ --__ ________________________________________________________ No. Lanes ; O 2 1; -1 2 O; 0 0 0, 1 0 1 Conflicting Flows: (vph) _ 779 Stop/Yield N; N; Potential Capacity: (pcph) 654 Volumes ; 729 50; 40 876 ; 60 40 Movement Capacity: (pcph) - 654 PHF .95 .95; .95 .95 ; .95 .95 Prob. of Queue -free State: 0.93 Grade1 0 0 I 0 0 -------------------------------------------------------- MC's (%) 0 O; 0 0- ; ; 0 0 Step 4: LT from Minor Street WE EB SU/RV's C%)i 0 Oi 0 0 0 0 ________________________________________________________ CV's (%) 0 0; 0 0 0 0 Conflicting Flows: (vpn) 1645 PCE's 1.1 1.1; 1.1 1.1 1.1 1.1 Potential Capacity: (pcph) 94 ________________________________________________________________________ Major LT, Minor TH Impedance Factor: 0.93 Adjusted Impedance Factor: 0.93 Capacity Adjustment Factor Adjustment Factors due to Impeding Movements 0.93 - Movement Capacity: (pcph) 87 Vehicle Critical Follow-up ------ ------------------------------------------------- Maneuver Gap (tg) Time (tf) __________________________________________________________________ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Lett Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation - HCS: Unsignalized Intersection Release 2.1 Page 3 zzzxzxzzzzzzzzxzzzxzxzzzzzzzzzxxxxxxxxxzxxzxxzzxzxzzzzzzzxxzzzzz Intersection Performance Summary F1owRate MoveCap SharedCap Avg -Total Delay Movement v(pcph) Cm(pcph) Csn(pcph) Delay - LOS ________ ______ ______ ______ ------------ ______ By App ------- WE L 69 87 161.4 F 21.0 WE R 46 906 4.2 A 56 _ 46 654- 5_9 B 0.3 Intersection Delay = 1.4 Center For Microcomputers In Transportation HCS! Unsignalized Intersection Release 2,1 Page 1 x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx File Name ................. Streets: (N-S) SHIELDS - (E-W) ARBOR Major Street Direction.... NS - - Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis.......... 6/13/95 Other Information......... 1998 O15 H�PM Two-way Stop -controlled Intersection Northbound 1 Southbound 1 Eastbound Westbound L T R; L T R; L T R;. L T R ---- --------i ---- --------i ---- ---- ---- ---- ---- ---- No. Lanes O 2 11 1 2 01 0 0 O; . 1 0 1 Stop/Yield N1 N; ' volumes 621 45; 50 618 ; 20 25 PHF 1 .95 .95: .95 .95 i .95 .95 Grade ; 0 0 ; 0- O MC's (%) i O 01 0 0 i 0 0 SU/RV's (:) 0 01 0 0 0 0 CV's (%) i O O� 0 O 0 0 PCE's 1.1 1.1� 1.1 1.1 i 1.1 1.1 ------------------------------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) ------------- -------------------------------------------------- Left Turn Major Road 5.50 2.10 Right Turn Minor Roaa 5.50 2.ti0 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation - HCS: Unsignalized Intersection Release 2.1 Page 2 x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vpn) 310 PotentialCapacity: (pcph) 964 Movement Capacity: (pcph) 964 Prob. of ,Queue -free State: �0.97 -------------------------------------------------------- Step 2: LT from Major Street SB NB -------------------------------------------------------- Conflicting Flows: (vph) 666 Potential Capacity: (pcph) 753 Movement Capacity: (pcph) - 753 Prob. of Queue -free State: 0.92 --------------------------------------------_------------ Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 1290 Potential Capacity: (pcph) 158 Major LT, Minor TH . Impedance Factor: 0.92 Adjusted Impedance Factor: 0.92 Capacity Adjustment Factor due to Impeding Movements 0.92 Movement Capacity: (pcph) -------------------------------------------------------- 146 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx*xxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) ------ Delay ------------ LOS By App ------------- -------- WB L ------ 23 ------ 14b 29.3 D 21.0 WB R 29 964 3.9 A SB L 58 753 5-.2 B 0.4 Intersection Delay = 0.9 Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx File Name ................ Streets: (N-S) SITE DRIVE (E-W) ARBOR Major Street Direction.... EW WorkSheet for TWSC Intersection Length of Time Analyzed... 60 (min) ------------------------------------------- _____________ Analyst ................... MD Step 1: RT from Minor Street NB 56 Date of Analysis.......... Other Information......... 6/13/95 19913 015 AM PM - ________________________________________________________ Conflicting Flows: (vph) 70 Potential Capacity: (pcph) 1276 Two-way Stop -controlled Intersection - _Movement Capacity: (pcph) 1276 ree State: Pro-. or Queue- 0.97 Eastbound Westbound Northbound ' Southbound --- ---- L T ____ ____ ---- R; L T R; L T R; :---- ____ ---- :---- ____ ---- :---- L T ____ R Step 2: LT from Major Street WB EB No. Lanes O) 1 0; 0 1C O; O O O; 1 0 1 ________________________________________________________ Con- nCapacit (vph) 70 Stop/Yield ' N; N; Potential Potential Capacity: (pcph) 1588 volumes 30 60 70 01 5 30 Movement Capacity: (pcph) -1588 PHF .95 .95 .95 .95: .95 .95 prod. of Queue -free State: - 0.98 Grade O 0 0 0 TH Saturation Flow Rate: (pcphpl) 1700 MC's (%) 0 0 0 0: 0 0 R7 Saturation Flow Rate: (pcphpl) SU/RV's (t ); 0 O 0 O; ; 0 0 Major LT Shared Lane Prob. Cv's (%) 0 0 0 0: 0 0 of Queue -free State: 0.98 PCE's 1.1 1.1 1.1 1.1; 1.1 1.1 ________________________________________________________ ________________________________________________________________________ Step 4: LT from Minor Street NB SB ________________________________________________________ Conflicting Flows: (vph) 160 Potential Capacity: (pcph) 855 Adjustment Factors _ Major LT, Minor TH Impedance Factor: 0.98 Vehicle Critical Follow-up Adjusted Impedance Factor: 0.98 Maneuver Gap (tg) Time (tf) Capacity Adjustment Factor due to Impeding Movements 0.98 Lett Turn Major Road 5,00 2.10 Movement Capacity: (pcph) 835 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3..30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary Flowkate MoveCap SharedCap Avg.Total Delay Movement ________ v(pcph) ______ Cm(PCPh) Csn(pcph) Delay LOS By App 56 L 6 ______ 835 ______ ------------ 4.3 ______ _______ A%� 21.0 i SS R E. 35 1276 2.9 A Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 YYYY##Y#Y#YYYYYYY#Y#####YYYYYYYYYYY#####YYYYYY##YY#YY#####YYYY## YYYY#YYYYYYY#Y#Y#YYYYYYYYYYYYYY#x######YYY#YYYYY##Y#Y#####Y#YYYY File Name ................ Streets: (N-S) SITE DRIVE (E-W) ARBOR - Major Street Direction.... EW WorkSheet for TWSC Intersection Length of Time Analyzed-... 60 (min). - ________________________________________________________ Analyst ................... MO Step 1: RT from Minor Street I NB SB Date of Analysis.......... Other Information......... 6/13/95 1998 O1 P. PM ..________________________________________________________ Conflicting Flows: (vph) - . 25 - Potential.Capacity: (pcph) _ 1345 Two-way Stop -controlled Intersection - Movement Capacity: (pcph) 1345 ----------------------------------------------------------------------- Prop. of Queue -free State: 0.99 Eastbound westbound Northbound Southbound -------------------------------------------------------- L T R; L T R; L T R; L T R Step 2: LT from Major Street WB EB, No. Lanes O> 1 0; 0 1< 0! 0 0 0; 1 - 0 1 Conflicting Flows: (vph) 25 Stop/Yield ; N; N; ; Potential Capacity: (pcph) 1668 volumes 25 70 25 0; 5 15 Movement Capacity: (pcph) 1668 PHF ; .95 .95 .95 .95: .95 .95 Prop. of Queue -free State: 0.98 Grade 0 ; 0 ; 0 ; 0 TH Saturation Flow Rate: (pcphpl) 1700 MC's (%) 0 0 0 0; 0 0 RT Saturation Flow Rate: (pcphpl) SU/RV's (%); -0 0 0 O; ; 0 0 Major LT Shared Lane Prob. CV's (X) 0 0 0 0; 0 0 of Queue -free State: 0.98 PCE's 1.1 1.1 1.1 1.1; 1.1 1.1 ___________________________-__--_-_---________________ ________________________________________________________________________ Step 4: LT from Minor Street NS SB ________________________________________________________ Conflicting Flows: (vph) 120 Potential Capacity: (pcph) 902 Adjustment Factors Major LT, Minor TH - Impedance Factor: 0.98 Vehicle Critical Follow-up Adjusted Impeaance Factor: 0.98 Maneuver Gap (tg) Time (tf) Capacity Adjustment Factor __________________________________________________________________ due. to Impeding Movements 0.98 Left Turn Major Road 5.00 2.10 Movement Capacity: (pcph) 886 Riant Turn Minor Road - 5.50 2.60 -------------------------------------------------------- Through Traffic Minor Road 6.00 3.30 . Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 Y#Y#YYYYY##YYYYYYYYYYYYYYYYYYYYYY#YYYYYYYYYYYYYYYYYYYYYYYYYYYYYY Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csn(Pcph) Delay LOS By App ________ ______ ______ ______------------ ------ --------- SB L 6 eeb 4.1 A% A 21.0 S9 R 18 1345 2.7 A EB L 29 166a 2.2 a n.c M = = on . CenterForMicrocomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 File Name ................ - Streets: (N-S) CENTURY (E-W) SITE DRIVE Major Street Direction.... NS WOrkSheet for TWSC Intersection - Length of Time Analyzed... 60 (min). -------------------------------------------------------- Analyst................... MD Step 1: RT from Minor Street WS EB Date of Analysis.......... Other Information......... 6/13/95 1998 2015 AM PM - _ ________________________________________________________ Conflicting Flows: (vph) 85 _ Potential Capacity: (pcph) 1254 Two-way Stop -controlled Intersection Movement Capacity: (pcph) 1254 _________ Prob. of Queue -free State: 1.00. Northbound 1 Southbound Eastbound Westbound - -------------------------------------------------------- L T R; L T RI L T ____ ____ ---- :---- ____ R; ---- ,---- L T R ___- ____ Step 2: LT from Major Street SB ________________________________________________________ NB i No. Lanes 0> 1 Oi 0 1( 11 1 0 1; 0 0 0 Conflicting Flows: (vph) - 185 Stop/Yield N; N: Potential Capacity: (pcph) - 1399 Volumes 0 130 85 100; 85 5; Movement Capacity: (pcph) 1399 PHF ; .95 .95 .95 .95; .95 .95; Prob. of Queue -free State: 1.00 Grade 0 0 0 0 TH Saturation Flow Rate: (pcphpl) 1700 MC's (%) 0 0 0 O; 0 0; RT Saturation Flow Rate: (pcphpl) SU/RV's (:); 0 0 0 0; 0 O; Major LT Shared Lane Prob. CV's (:) ; 0 0 0 O; 0 O; of Queue -free State: 1.00 PCE's 1.1 1.1 1.1 1.1i 1.1 1.1: ________________________________________________________ ________________________________________________________________________ Step 4: LT from Minor Street WB EB ________________________________________________________ Conflicting Flows: (vph) 265 Potential Capacity: (pcph) 744 Adjustment Factors Major LT, Minor TH Impedance Factor: 1.00 Vehicle Critical Follow-up Adjusted Impeaance Factor: 1.00 Maneuver .Gap (tg) Time (tf) Capacity Adjustment Factor __________________________________________________________________ due to Impeding Movements 1.00 Left Turn Major Road 5.00 2.10 Movement Capacity: (.pcph) 744 Right Turn Minor Road 5.50 2.60 -------------------------------------------------------- Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road _ 6.50 3.40 - Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 X XXXXX#XXXXXXXXXXXXXXXXXXXXXX*XXXXXXXXXXXXXXXXXXXXXXX##XX#XX###X Intersection Performance Summary F1owRate MOveCap SharedCap AV9.Total Delay Movement v(pcph) ________ ______ Cm(pcPh) ______ Csh(pcph) Delay ______------------ LOS By APR ------ ES L 98 744 5.6 ------- B • R ss4-i EB R 6 1254 2.9 A Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 ################################################################ File Name ................ Streets: (N-S) CENTURY (E-W) SITE DRIVE Major Street Direction.... NS Length of Time Analyzed... 60 (min) _ Analyst ................... MD Date of Analysis.......... 6/13/95 - Other Information......... 1998 201 At PM Two-way Stop -controlled Intersection Northbound Southbound Eastbound Westbound L T R; L T R; L T R; L T, R i---- --------i---- --------i ---- --------i ---- ---- ---- No. Lanes 0) 1 O; 0 1( - 1; 1 O 11 0 0 O Stop/Yield W N; Volumes 0 80 55 65: 30 5 PHF .95 .95 i .95 .95: .95 .95 Grade 0 0 0 ; O MC's (k) 0 O 0 Oi 0 0: SU/RV's 0 0 i 0 0: 0 0: Cv's (:) 0 O O 0: 0 0� PCE's 1.1 1.1 1.1 1.1; 1.1 l.li ------------------------------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver - - Gap (tg) Time (tf) ------------------------------------------------------------------ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 xxxxxxxxx=xxxxx=x:x=xxxxxx�xxx#xxxxxxxxx#xxxxxxxxxxxxxxxx#xxxxxx WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB ES - Conflicting Flows: (vph) 55 Potential Capacity: (pcph) 1299 Movement Capacity: (pcph) 1299 Prob. of Queue -free State: 1.00 -------------------------------------------------------- Step 2: LT from Major Street SB NS -------------------------------------------------------- Conflicting Flows: (vph) 120 Potential Capacity: (pcph) 1503 Movement Capacity: (pcph) 1503 - Prob. of Queue -free State: _ 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street WB ' EB -------------------------------------------------------- Conflicting Flows: (vph) 168 Potential Capacity: (pcph) 846 Major LT, Minor TH Impedance Factor: 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) -------------------------------------------------------- 846 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 xxxxx#xx=xxx#xxx=#x=x#ixx#x#=x#Fx=xx###xxxxxx#xxxxx#xxxxx#xx#xx# Intersection Performance Summary FlowRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay - LOS BY App -------- ------ ------ ------------------ --------------- EB L 35 846 4.4 A�A EB R 6 1299 2.8 A !V rr HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 . 06-14-1995 Center For Microcomputers In Transportation - - Center For Microcomputers In Transportation Streets: (E-W) HYORSETOOTH (N-S) CENTURY Streets: (E-W) HORSETOOTH (N-5) CENTURY Analyst: MO File Name: Analyst: MD File Name: Area Type: Other 6-14-95 Aa PM Area Type: Other 6-14-95 AM PM Comment: 1995 .1998 2015 _ Comment: 1995 1998 201 Eastbound iWestbound Northbound Southbound Eastbound Westbound .Northbound Southbound L T R s L. T R L T R -___ ____ L T ---_ ____ R -_-- L T R L T _-__ ____ ________ ____ R L T R, ____ ____ ____ ____ --------- L T R ---- No. Lanes ____ ____-___-___ ____ 1 2 t 1 2 ____---- 1 > 1 1> 1 1 No. Lanes 1 2< i 2 1 > 1 1; > 1 1 volumes 55 1075 40: 80 580 35: 50 1 60: 35 1 40 volumes 55 1040 40: 145 1265 M 130 1 85: 40 1 65 Lane Width :12.0 12.0 :12.0 12.0 12.0; 12.0 12.0; 12.0 12.0 Lane Width :12.0 12.0 ;12.0 12.0 12.0: 12.0 12.0; 12.0 12.0 RTOR Vols ; O1 .0: Oi 0. RTOR Vols 0; - 0;1 0: 0 Lost Time :3.00 3.00 3.00;3.00 3.00 3.00:3.00 3.00 3.00;3.00 3.00 3.00 - Lost Time 13.00 3.00 3.00:3.00 3.00 3.00;3.00 3.00 3.00:3.00 3.00 3.00 _______________________________________________________________________ Signal Operations -_____________________________________-_____________---_____________-__ Signal Operations Phase. Combination 1 2 3 4; 5 6 7 8 Phase Combination 1 2 3 4 I 5 6 7 8 EB Left * ;NB Left * EB Left * 'NB Left Thru * 1 Thru * Thru * Thru * Right * i Right * Right * i Right Peas Peas Peas Peas WB Left * '58 Left * WB Left - * * ;SB Left Thru * ; Thru * Thru * * Thru Right * - Right* Right * * Right Peas Peas Peas Peas NB Right :EB Right NB Right ;EB Right SB Right :WB Right SB Right ;WS Right Green 35.0P ;Green 15.OA Green 25.OP 10.OA ;Green. 15.OA Yellow/AR 6.0 ;Yellow/AR 5.0 Yellow/AR 6.0 0.0 !Yellow/AR 5.0 Cycle Length: 61 secs Phase Combination order: #1 #5 Cycle Length: 61 secs Phase combination order: #1 #2 #5 _______________________________________________________________________ Intersection Performance Summary ___-_-_-__---________________________-___________---_______________--__ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Lane Group: Aaj Sat v/c g/C Approach: Mvmts _____ Cap Flow Ratio ____ _______ _____ Ratio Delay LOS _____ _____ ___ Delay _____ LOS ___ Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS --- EB L 349 560 0.166 0.623 3.7 A 5.1 B ----- EB L -___------- _____ 122 266 0.475 _____ _____ 0.459 10.9 -__ B ----- 10.9 B TR 2307 3703 . 0.535 0.623 5.1 8 TR 1700 3703 0.702 0.459 10.9 B WB L 122 196 0.688 0.623 15.7 C 5.3 B WB L 412 1770 0.371 0.328 12.0 B 6.1 B T 2320 3725 0.277 0.623 4.0 A T 2320. 3725 0.603 0.623 5.6 B R 986 1583 0.038 0.623 3.4 A R 986 1583 0.075 0.623 3.5 A NB LT 444 1592 0.122 0.279 12.5 B 12.5 B NB LT 401 1438 0.344 0.279 13.6 B 13.3 8 R 441 1583 0.143 0.279 12.t, E R 441 1583 0.202 0.279 12.8 8 SB LT 435 1560 0.087 0.279 12.4 B 12.4 8 SB LT 347 1245 0.124 0.279 12.5 B 12.6 8 R 441 1583 0.095 0.279 12.4 B R 441 1583 0.154 0.279 12.6 B Intersection Delay = 5.8 sec/veh Intersection LOS = B Intersection Delay = 8.7 sec/ven Intersection LOS = B Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.519 _______________________________________________________________________ Lost Time/Cycle, ____-_-____--__----__-_---_______--_-______---_----_----_--__---------_ L = 6.0 sec Critical v/c(x) = 0.635 ri r� �r �r rr ri r r rr rr �r r r� r� rr r� r■� rr r� Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 Center For Microcomputers In Transportation **************************************************************** HCS: Unsignaiized Intersection Release 2.1 'Page 2 File Name ................ Streets: (N-S) CENTURY (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) - Work$heet for TWSC Intersection - Analyst................... MD ___-__-__________________--______-__________-_________-_ Date of Analysis.......... 6/14/95 ., Step 1: RT from Minor Street N8 SB Other Information......... 1995 199 2015 AM �F� ----------------------__________________________________ Conflicting Flows: (vph) - 332 380 Two-way Stop -controlled Intersection Potential Capacity: (Pcph) 940 889 -------------------------------'-'----' Movement Capacity:. (Pcph)- 940 889 Eastbound Westbound Northbound Southbound Prod, of Queue -free State: 0.90 0.92 L T Ri L T Ri L T Ri L T R ________________________________________________________ ---- -------- : ---- --- ---- I ---- ---- ---- ---- ---- ---- Step 2: LT from Major Street WB EB No. Lanes 1 2( O; 1 2 1; O> 1 1; 0> 1 1 ________________________________________________________ Stop/Yield N; Y; Conflicting Flows: (vph) 664 759 Volumes 55 624 40: 145 759 701 130 0 85; 40 0 65 Potential Capacity: (Pcph) 754 - 671 PHF .95 .95 .95: .95 .95 .95: .95 .95 .95: .95 .95 .95 Movement Capacity: (Pcph) 754 671 Grace O 0 ; 0 O Prob. of Queue -free State: 0.78 0.90 MC's (%) 0 0 0': 0 0 0: 0 0 Oi 0 0 0 ________________________________________________________ . SU/RV's (%); 0 0 O; 0 O O; 0 0 0; 0 0 0 Step 3: TH from Minor Street NB SB CV'$ (%) i 0 0 0! 0 0 O� O 0 Oi 0 0 0 ________________________________________________________ PCE's 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1 Conflicting Flows: (vph) 1603 1623 ________________________________________________________________________ Potential Capacity: (Pcph) 126 123 Capacity Adjustment Factor due to Impeding Movements 0.70 0.70 Movement Capacity: (Pcph) 1 89 86 Adjustment Factors Prob. of Queue -free State: 1.00 1.00 vehicle Critical Follow-up ________________________________________________________ Step 4: LT from MinorStreetNB " SB Maneuver - Gap (tg) Time (tf) -------------------------------------------------------- __________________________________________________________________ Conflicting Flows: (vph) 1602 1582 Left Turn Major Road 5.50 2.10 Potential Capacity: (pcph) 100 103 Right Turn Minor Road 5.50 2.60 Major LT, Minor TH Through Traffic Minor Road 6.50 3.30 Impedance Factor: 0.70 0.70 Left Turn Minor Road - 7.00 3.40 Adjusted Impedance Factor: 0.77 0.77 Capacity Adjustment Factor - due to Impeding Movements 0.71 0.69 Movement Capacity: (Pcph) 71 71 ________________________________________________________ Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcpn) CM(pcph) Csh(pcph) Delay ____________ LOS ------ BY APP --------- ________ ______ ______ ______ NB L 151 71 > 71 > * > F NB R 98& 940 4.3 A SS L 46 71 > 71 > 133.2 > F 57.8 SB R 75 889 4.4 A ES L 64 671 5.9 B 0.5 WB _ 1,_,8 754 6.1 B 0.9 r� rr r r �r �r r� �r �r r ■r � r �r r r� �r r� r� Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 YMYYYYXYYXXXMXXXXXXXXXXXXMXYYXYYYYYYYYYMYXYXXXMMYYYMYYXXYXMYMXXX File Name ................ Streets: (N-S) CENTURY (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... MD - Date of Analysis.......... 6/14/95 Other Information......... 1995 1998 2015 a PM Two-way Stop -controlled Intersection Eastbound westbound Northbound Southbound L T R; L T RI L T R; L T R ---- -- - '---- ---- ---- I ---- -- - ---- I ---- ---- ---- .. No. Lanes 1 2( 0; 1 2 11 O> 1 1; O> 1 1 Stop/Yield N; Y; Volumes 55 645 40: 80 348 35: 50 0 60i 35 0 45 PHF - .45 .95 .95: .95 .95 .95: .95 .95 .95: .95 .95 .95 Grade 0 0 0 0 MC's (:) 0 0 0: 0 0 Oi 0 0 0: 0 0 0 SU/RV's 0 O O; 0 0 0; 0 0 O; 0 0 0 CV's (:) 0 0 0; 0 0 0; 0 0 0; 0 0 0 PCE's 1.1 1.1 1.i� 1.1 1.1 1.1: 1.1 1.1 1.1: 1.1 1.1 1.1 ________________________________________________________________________ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) Time (tf) __________________________________________________________________ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2..60. Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 Y XYYYYYYXXYYXXYXXXXXXYYYYYYYXYYYYXXXXXXXXXYYYYYYYYXXXXXXXYYXYXXY WorkSheet for TWSC Intersection -------------------------------- ________________________ Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 342 174 Potential Capacity: (pcph) 929 1130 Movement Capacity: (pcph) 929 1130 Prod. of Queue -free State: 0.93 0.95 -------------------------------------------------------- Step 2: LT from Major Street WB EB ----------------- -------------------------------------- Conflicting Flows: (vph) 685 348 Potent l'al Capacity: (pcph) 735 1115 Movement Capacity: (pcph) 735 1115 Prob. of Queue -free State: 0.87 0.94 -------------------------------------------------------- Step 3: TH from -Minor _Street ______________________---- -------------NB SB Conflicting Flows: (vph) 1148 1168 Potential Capacity: (pcph) 232 226 Capacity Adjustment Factor due to Impeding Movements 0.82 0.82 Movement Capacity: (pcph) 191 186 Prob. of Queue -free State: 1.00 1.00 -------------------------------------------------------- Step 4: LT from Minor Street NB 56 -------------------------------------------------------- Conflicting Flows: (vph) 1148 1128 Potential Capacity: (pcph) -195 201 Major LT, Minor TH Impedance Factor: 0.82 0.82 Adjusted Impedance Factor: 0.87 0.87 Capacity Adjustment Factor due to Impeding Movements 0.83 0.80 Movement Capacity: (pcph) 161 161 ________________________________________________________ Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(.pcph) Delay ------------ LOS ------ --------- By APp ________ ______ ______ NS L 58 161 > ______ 161 > 34.8 > E. 19.2 NB R ti9 929 4.2 A 56 L 41 161 > 161 > 30.0 > D 16.0 SS R 52 1130 3.3 A EB L 64 1115 3.4 A 0.3 WB L 92 735 5.6 3 i.0 r� r� r r �r r� r� �r r� rr r� �r � r� r■� rr r� r� r� Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 S SSSSSYYYYYSSxSxSYYSSYSSSSSYYYYYYYYSSSSYYYSSSYSYYYYSSSYYYYYYSSYY File Name ................ Streets: (N-S) SITE DRIVE- (E-W) HORSETOOTH Major Street Direction.... E'A Length of Time Analyzed... 60 (min) Analyst ................... MO Date of Analysis.......... 6/14/95 Other Information....._... 1998 201 AM Two-way Stop -controlled -Intersection EaStDound Westbound Northbound ; Southbound , L T R; L T R; L T R; L T R No. Lanes i 0 2 1; 0 0 0; 0 0 1; 0 0 0 Stop/Yield ; Y; N; volumes 624 75; 95 PHF .95 .95: .95; Grade ' 0 0 ' 0 O MC's (%) ' 0 0; Oi SU/RV's (%)i 0 0; 0 CV's (%) 0 0: O PCE's , 1.1 1.1; 1.1 ________________________________________________________________________ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg ) Time (tf ) __________________________________________________________________ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 Y xxxxYxYxxxxxxYxYYYYxxxxxxxxxxYaxxxxxxxxYxYYYYxxYxxYxYYxxYxYxYxY WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB Conflicting Flows: (vph) 312 Potential Capacity: (pcph) 962 Movement Capacity: (pcpn) 962 Prob. of Queue -free State: 0.89 ------------------------- _______________________________ Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 f YYxxxYtxxYYYYxYYYYYYYYYYxYxxxxYXxxxxxxxxYYYYYYYYXYxx■YYxxYxxxYx Intersection Performance Summary FlowRate MoveCap SharedCap Avg.Total - Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App ________ ______ ______ ______ ____________ ------.------- NS R 110 962 4.2 A Intersection Delay = 1.8 r it rr rr �r rr r. r �r rr �r it r r r �r rr r� r Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 Y YXYYYXYXSSSYTYYYYXXSXXSSSXSYYYYXYSSXSSYSYYSXXSXXYTYYXYSSXXSXSYY File Name ................ Streets: (N-S) SITE DRIVE (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis.......... 6/14/95 Other Information......... 1999 2015 AM PM Two-way Stop -controlled Intersection Eastbound Westbound Northbound Southbound i L T Ri L T Ri L T R: L T R No. Lanes 0 2 1; 0 0 0; 0 0 1; 0 0 0 Stop/Yield ; Y; N; Volumes 699 55; 35; PHF .95 .95: ..95i Grade 0 0 ; 0 ; O- MC's ('S) i 0 0: 0: SU/RV's (%); 0 0; O Cv's (:) 0 Oi i Oi PCE's 1.1 1.i; 1.11 ----------------------------------------------------------------------- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) .Time (tf) __________________________________________________________________ Left Turn Major Road - 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 X XSSXXSSYYYYXSSSTYYYYYXXSS SSSSSSSSYSYSFYYXYYSSSSSSSYXYYXYSSSS WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NO SO ________________________________________________________ .Conflicting Flows: (vph) 350 Potential Capacity: (pcph) 920 Movement Capacity: (pcph) 920 Prop. of Queue -free State: -------------------------------------------------------- 0.96 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 S SSSYYYYYYSXYSYYSXSYXYYSYSSYYXYYtYYYXYYYYYYSXXYSYYYYSYYYXYYYYY22 Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(poPh) Cm(pcph) Csh(pcph) Delay LOS By App ________ ______ ______ ______------------ ______ ________- NO R 41 920 4.1 A Intersection Delay = 0.9 �s r man M r= M i M M s M M HIM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 Center For Microcomputers -In Transportation - Streets: (E-W) HORSETOOTH (N-S) SHIELDS Analyst: MD File Name: Area Type: Other 6-14-95 (n� PM Comment: 1995 1998 2015 Eastbound westbound Northbound Southoound L - T R L T R L T R L T R ____ ____ ________ ____ ________ ____ ________ ____ ___- No. Lanes 1 2 < 1 2 1 1 2 1 ; 2 2 1 Volumes 200 705 150; 190 230 250; 90 950 220: 295 740 60 Lane Width ',12.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0 RTOR Vols I 01 1W 100I - 50 Lost Time :3.00 3.00 3.00;3.00 3.00 3.0013.00 3.00 3.00:3.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 1 5 6 7 EB Left * * ;NB Left Thru * Thru Right * Right Peds Peas WE Left * * ;SB Left Thru * Thru Right * Right Peas Peas NB Right IEB Right SB Right :WE Right Green 1O.OA 30.OA ;Green 8.OA 6.OA 32.OP Yellow/AR 4.0 5.0 ;Yellow/AR 0.0 0.0 5.0 Cycle Length: 100 secs Phase combination order: #1 #2 #5 #6 #7 _________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 Center For Microcomputers In Transportation Streets: (E-W) HORSETOOTH (N-S) SHIELDS Analyst: MD File Name: Area Type: Other 6-14-95 AM PM Comment_-1995-1998===01_==_____________________________________________ Eastbound Westbound Northbound Southbound L T R L T R L T R L T R �____ ____ ____�____ ____ ____-___ ___- ________ ____ ---- No. Lanes 1 2 < 1 2 1 1 2 1 2 2 1 Volumes 100 600 160: 240 770 450I 165 970 120: 385 1100 200 Lane Width :12.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.O;12.0 12.0 12.0 RTOR Vols 0; 1M .1W - 100 Lost Time .:3.00 3.00 3.0013.00 3.00 3.00;3.00 3.00 3.00',3.00 3.00 3.00 _______________________________________________________________________ Signal Operations 8 Phase Combination 1 2 3 4; 5 6 7 8 EB Left * ;NB Left Thru * i Thru Right Right Peas Peas WE Lert * * ;SB Left Thru * Thru Right * Right Pads Peas NB Right ;EB Right SB Right :WE Right Green 12.OA 28.OA ;Green 10.OA 8,OA 28.OP Yeliow/AR 4.0 5.0 ;Yellow/AR 0.0, 0.0 5.0 Cycle Length: 100 secs Phase combination oraer: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 489 1770 0.431 0.250 13.1 B 24.5 C TR 1160 3625 0.815 0.320 27.0 D we L 269 1770 0,743 0.250 22.8 C 18.5 C T 1192 3725 0.213 0.320 18.9 C R 728 1583 0.217 0.460 12.3 B N8 L 172 1770 0.552 0.100 18.2 C 25.0 C T 1266 3725 0.829 0.340 26.4 D R 538 1583 0.236 0.340 18.0 C SB L 1015 3539 .0.315 0.090 23.9 C 19.5 C T 1490 3725 0.549 0.400" 17.9 C R 760 1583 0.013 0.480 10.3 B Intersection Delay = 22.4 sec/Veh Intersection LOS = C Lost Time/Cycle, L = 18.0 sec Critical v/C(x) = 0.893 -------------------------------------------------------- _______________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS ___ Delay _____ LOS --- EB _____ L ____ 305 _______ 1770 _____ 0.344 _____ 0.290 _____ 14.2 B 25.4 D TR 1082 3608 0.776 0.300 26.8 D WE L 305 1770 0.830 0.290 29.2 D 23.7 C T 1118 3725 0.762 0.300 26.3 D - R 760 1583 0.486 0.480 13.8 8 NS L 206 1770 0.845 0.140 36.6 D 38.7 D T 1118 3725 0.959 0.300 39.4 D R 475 1583 0.044 0.300 18.9 C SB L 1048 3539 0.398 0.130 24.9 C 24.6 C T 1416 3725 0.859 0.380 25.6 D R 760 1583 0.140 0.480 11.0 8 Intersection Delay = 27.6 sec/veh Intersection LOS = D Lost _______________________________________________________________________ Time/Cycle, L = 18.0 sec Critical v/c(x) = 0.940 - APPENDIX D M M M M M r M r M W w M M W! M M M M Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 YXYYYYYYYYYYYYXZYYYYYYYYXXYXXYYZYYYYYXYYW.XYXXYYYYtYYXXXYYYYYYYYX File Name ................ Streets: (N-$) SHIELDS (E-W) ARBOR Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis........... 6/13/9 Other Information.......,, 199H 2O15 AM PM Two-way Stop -controlled Intersection Northbound Southbound Ea=_toound I Westbound L T Ri L T R: L T R� L T R �____ --__ ---- :---- ____ ---- :---- ____ ---- :---- ____ ---- No. Lanes O 1< O; 1 1 O; O O 0; 1 O 1 Stop/Yield N; N Volumes 925 30: 15 995 - 35 25 PHF .95 .95: .95 .95 ; .95 .95 Grade ' 0 0 0 ' 0 Mc's (:) 0 O; 0 0 0 0 SU/RV's 0 OI 0 0 0 0 CV's (: ) 0 OI 0 0 i 0 0 PCE's 1.1 1.1: 1.1 1.1 1.1 1.1 ___________-_____________________________-____________---_____________-- Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg) - Time (tf) __________________________________________________________________ Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Througn Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 Y YYXXXXXXYXxxYxYXXXXXXXXXYXXXxYYXXXXXXxXXYXYX:XXxYXXYYf XXXXXX*XX WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 940 Potential Capacity: (pcph) 462 Movement Capacity: (pcph) 462 Prod, of Queue -free State: 0.94 ------------------------------- ------------------------ Step 2: LT from Major Street 5B NB ________________________________________________________ Conflicting Flows: (vph) 955 Potential Capacity: (pcph) 601 MOvement.Capacity: (pcph). 601 Prob. of Queue -free Stater 0.97 - -------------------------------------------------------- Step 4: LT from Minor Street WB ES - ________________________________________________________ Conflicting Flows: (vph) 1950 Potential Capacity: (pcph) 79 Major LT, Minor TH Impedance Factor: 0.97 Adjusted Impedance Factor: 0.97 Capacity Adjustment Factor due to Impeding Movements 0.97 Movement Capacity: (pcph) -------------------------------------------------------- 77 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 z zzxXXXxXXXYXxxxxzzxzxzxxzYxxxXXXzxzXzzxzYxzzXYxxzxXXXXZXZXYXYxz Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) ______ ______ Delay ------------ LOS By App ______ _____-__- ________ WB L ______ 41 77 97.0 F 21.0 WB R 29 462 8.3 B SB L 15 c01 6.2 8 0.1 Intersection Delay = 0.7 W M r r M W r W, W W M= W M M M M M M Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 File Name ................ Streets: (N-S) SHIELDS (E-W) ARBOR Major Street Direction.... NS _ Length of Time Analyzed... 60 (min) - Analyst ................... MD Date of Analysis.......... 6/13/95 �_.,� - Other Information......... 199 2015 lniv PM Two-way Stop -controlled Intersection Northbound Southbound Eastbound westbound i L T R� L T RI L T Ri L T R ---- -------- :---- _-_- ---- :---- ---- --- ---- ---- ---- No. Lanes 0 1( 0; 1 1 O; O O O;- 1 0 1 Stop/Yield N: N volumes Soo 151 15 685 ; 25 15 PHF .95 .95; .95 .95 .95 .95 Grade O ' 0 '- 0 ' 0 MC's (o ) 0 0� 0 0 0 0 SU/RV's (:)1 0 O; 0 0 0 0 CV'S (:) i 0 O� 0 0 0 0 PCE's 1.1 1.1; 1.1, 1.1 1.1 1.1 ________________________________________________________________________ Adjustment Factors Vehicle Critical Follow-up Maneuver ------------------------------------------------------------------ Gap (tg,) Time (tf ) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road. 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 Y YY1t<Y>.ttit�itt�YMYY W.YX W.YMY.Xxt](xXH(tXtYYtxtXYttYt.'k.Y(S.t Yf tXttY.Y.Y �t Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB ES Conflicting Flows: (vph) 808 Potential Capacity: (pcph) - 539 - Movement Capacity: (pcph) 539 . Prob. of Queue -free State: 0.97 --------------------------------- Step 2: LT from Major Street ----------------------- SB NB ________________________________________________________ Conflicting Flows: (vph) 815 Potential Capacity: '(pcph) - 701 Movement Capacity: (pcph) 701 Prob. of Queue -free State: '0.97 - -------------------------------------------------------- Step 4: LT from Minor Street W6 EB -------------------------------------------------------- Conflicting Flows: (vph) 1508 Potential Capacity: (pcph) 142 Major LT, Minor TH Impedance Factor: 0.97 Adjusted Impedance Factor: 0.97 Capacity Adjustment Factor - due to Impeding Movements 0.97 Movement Capacity: (pcph) ------------------------------------ 138 - ____________________ Center For Microcomputers- In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total. Delay Movement ________ v(pcph) ______ Cm(pcph) Csh(pcph) ______ ______ Delay ------------ LOS - By App ------ ------- WB L 29 138 33.0 E 21.0 WB R 18 539 6.9 B SB L 18 701 5.3 B O.1 Intersection Delay = 0.7 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 X SSXSSSXXSSSSSXSSSSSz22Y2z2XYXX22Yz2zX222X2X2zzzzXXY2Xzzzz2XXXYX File Name ................ Streets: (N-S) SITE DRIVE (E-W) ARBOR Major Street Direction.... EW - Length of Time Analyzea... 60 (min) Analyst .................... MO Date or Analysis.......... 6/13/95 Other Information......... 199 2015 . A PM Two-way Stop -controlled Intersection- ; Eastbound ; Westbound Northbound ; Southbound L T �____ Ri L T R: L T Ri L T R ____---- No. Lanes 0) 1 :---- 0; 0 1C 0; O 0 0; 1 0 1 Stop/Yield Ni Ni volumes 1 30 15 30 O; 5 30 PHF .95 .95 .95 .95: .95 .95 Grade ' 0 0 ; 0 0 MC's (%) 0 0 ' 0 Oi i 0 0 SU/RV's (:') 0 0 0 0: i 0 0 Cv's.( e) 0 0 O 0; 0 0 PCE's 1.1 1.1 ________________________________________________________________________ 1.1 1.1; 1.1 1.1 Adjustment Factors Vehicle Critical Follow-up Maneuver __________________________________________________________________ Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.00 3.30. Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 Y YYSSXSXXSSSSXSYYYSYYSYSXXSXXSXXXYSSSSSSSSSSYYSYSXSXYSSSSSXSXXXS WorkSheet for TWSC. Intersection -------------------------------------------------------- Step 1: RT from Minor Street NS . SB Conflicting Flows: (vph) 30 Potential Capacity: (pcph) 1337 Movement Capacity: (pcph) 1337 Prob. of Queue -free State: 0.97 -------------------------------------------------------- Step 2: LT from Major Street WB ________________________________________________________ EB Conflicting Flows: (vph) 30 Potential Capacity: (pcpn) 1659 Movement Capacity: (pcpn) 1659 Prob. of Queue -free State: - 0.98 TH Saturation Flow Rate:.(pcpnpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: -------------------------------------------------------- 0.98 Step 4: LT from Minor Street NB ________________________________________________________ SB Conflicting Flows: (vph) 75 Potential Capacity: (pcph) 958 Major LT, Minor TH Impedance Factor: 0.98 Adjusted Impedance Factor: 0.98 Capacity Adjustment Factor due to Impeding Movements 0.98 Movement Capacity: (pcph) 938 -------------------------------------------------------- Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 X zzXXXXZXXzzX2zXYXZX2XZY2zzXzzzXYZXX2XXXzzX22XX2YZX2XZXX22z222z2 Intersection Performance Summary F1owRate MoveCap Shareacap Avg.Total Delay Movement ________ v(pcph) Cm(pcph) ______ ______ rsh(pcph) ______ Delay LOS By App SB L - .6 938 ------------ 3.9 ------ _______ A SB R 35 1337 2,.3 A 4 21.0 EB L 35 1659 2.2 A 1.0 Intersection Delay = 4.2 m r m m r r M r M M������ Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 Y fKiYMYM �]�tY��t�%��Y*%%�zYt�t�*xSYYM���Y%tttYt�1Y���Y1YX����Xxt��[ Y����YXs�Yt��Y�Ktt���ztYxY�t�Y�*tYtttx��Yt�tY�K*tfYYt***Y�*Y1�tMtt File Name ................ - - Streets: (N-S) SITE DRIVE (E-W) ARBOR - Major Street Direction.... EW - WorkSheet for TWSC Intersection Length of Time Analyzed... 60 (min) ________________________________________________________ Analyst ................... MD -- Step 1: RT from Minor Street NB SB Date of Analysis.......... Other Information......... 6/13/95 1 98 2015 aPM ________________________________________________________ Conflicting Flows: (vph) 25 - Potential Capacity: (pcph) 1345 Two-way Stop -controlled Intersection - Movement Capacity: (pcph) 1345 Prob. of Queue -free State: 0.99 Eastbouna Westbound Northbound Southbound -------------------------------------------------------- - L T R; L T R; L T R; L T R Step 2: LT from Major Street WB EB ;____ ___- ---- No. Lanes 0) 1 ;---- ____ ---- 0, 0 1< :---- --_- ____'____ O; 0 0 O, _-__ 1 0 _-__ .1 ________________________________________________________ Conflicting Flows: (vph) 25 Stop/Yield N; N; ; Potential Capacity: (pcph) 1668 Volumes 25 5 25 0; 5 15 -Movement Capacity: (pcph) 1668 PHF .95 .95 .95 .951 ; .95 .95 - Prob. of Queue -free State: 0.98 Grade 0 0 0 0 TH Saturation Flow Rate: (pcphpl) 1700- MC's 0 0 0 0; 0 0 RT Saturation Flow Rate: (pcphpl) . SU/RV's (:)i 0 0 0 Oi 0 0 Major LT Shared Lane Prob. CV's (a) ; O 0 0 0;. 0 O of Queue -free State: 0.98 PCE's 1.1 1.1 i 1_1 1.1i 1.1 1.1 ________________________________________________________ ------------------------------------------------------------------------ Step 4: LT from Minor Street NB ________________________________________________________ SB Conflicting Flows: (vph) 55 Potential Capacity: (pcph) -- 984 Adjustment Factors Major LT, Minor TH - - Impedance Factor: 0.98 vehicle Critical Follow -UP Adjusted Impedance Factor: 0.98 Maneuver Gap (tg) Time (tf) Capacity Adjustment Factor - ------------------------------------------------------------------ due to Impeding Movements 0.98 Left Turn Major Road - 5.00 2.10 - Movement Capacity: (pcph) 967 Right Turn Minor Road - 5.50 2.60 - -------------------------------------------------------- Through Traffic Minor Road - 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 Intersection Performance Summary FlowRate MOVeCaP SharedCap Avg.Total Delay Movement v(pcph) Cm(pcPh) Csh(pcph) Delay ______ ------------ -LOS By APP ______--------- ________ ______ ______ SB L 6 967 3.7 A �A 21.0 SB R 18 1345 2.7 A EB L 29 1668 2.2 A 1.1 Intersection -Delay = 3.4 M M = = W M r W W W M W WE = M Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 xxxxxxxxxxx*xxx**xx**xsxx*x**xxxxxxxxxx��xxx*s***xxxx*xxxxxxsx*x File Name ................. Streets: (N-S) CENTURY _ (E-W) SITE DRIVE Major Street Direction.... NS Length of Time Analyzed... 60 (min) Analyst ................... MD - Date of Analysis.......... 6/13/95 Other Information......... <ia2015 AM PM Two-way Stop -controlled Intersection Northbound Southbound ; Eastbound Westbound L T R: L T R: L T R� L T R �_-__ ---- --_- _- ____ ---- :---- _-__ _---: ---- ---- ---- No. Lanes 0) 1 O; 0 1C 1; 1 0 1; 0 0 0 Stop/Yield N' N; ; Volumes O 60 ; 60 85: 85 5 PHF .95 .95 .95 .95: .95 .95; - Grade 0 0 0 O MC's (:) i 0 0 i 0 OI 0 Oi SU/RV's (:)i 0 0 0 0: 0 0 PCE's 1.1 1.1 1.1 1.1: 1.1 1.1 ----------------------------------------------------------------------- Adjustment Factors Vehicle Critical Follow-up Maneuver ------------------------------------------------------------------ Gap (tg) Time (tf) Left Turn Major Road 5.00 2.10 Right Turn Minor Road - 5.50 2.60 Through Traffic Minor Road 6.00 3.30 Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page. 2 x xxxxxxxxxxxx<xxx:xxxxxxxx*xxxxxxxxxxx*xxxxxxxxxx***x*xxxxxxxxYY WorKSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street WB EB Conflicting Flows: (vph) 60 Potential Capacity: (pcph) 1291 Movement Capacity: (pcph) 1291 Prob. of Queue -free State: 1.00 -------------------------------------------------------- Step 2: LT from Major Street SB NS -------------------------------------------------------- Conflicting Flows: (vph) 145 Potential Capacity: (pcph) 1462 Movement Capacity: (pcph) 1462 Prob. of Queue -free State: 1.00 TH Saturation Flow Rate: (pcphpl) 1700 RT Saturation Flow Rate: (pcphpl) Major LT Shared Lane Prob. of Queue -free State: 1.00 -------------------------------------------------------- Step 4: LT from Minor Street WB -------------------------------------------------------- EB Conflicting Flows: (vph) 162 Potential Capacity: (pcph) 853 Major LT, Minor TH Impedance Factor: - 1.00 Adjusted Impedance Factor: 1.00 Capacity Adjustment Factor due to Impeding Movements 1.00 Movement Capacity: (pcph) 853 -------------------------------------------------------- Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 x xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx:xxxxxxxxxxxxaxxxxx Intersection Performance Summary ,V F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcpn) Cm(Pcph) Csh(pcpn) Delay LOS By APp -------- ------ ------ ------------------ ---------_--- EB L 98 853 4.8 q ?Q Sh5'rl EB R 6 1291 2.8 A Intersection.Deiay = 115.0 Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 xxxxxxxxxxxxxxxxxxxxxxxx:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx File Name ................ Streets: (N-5) CENTURY (E-W) SITE DRIVE - Major Street Direction.... NS WorkSheet for TWSC Intersection Length of Time Analyzed... 60 (min) -------------------------------------------------------- Analyst................. MD Step 1: RT from Minor Street WB ES Date of Analysis.......... Other Information......... 6/13/9 1998- 2015 AM PM -------------------------------------------------------- Conflicting Flows: (vph) 15 Potential Capacity: (pcph) 1361 Two-way Stop -controlled Intersection Movement Capacity: (pcph) 1361 Prob. of Queue -free State: 1.00 Northbound Southbound Eastbound westbound -------------------------------------------------------- L T. --_----- R; L T --------1---- R; L T ---- RI ----1---- L _T R ---- ---- Step 2: LT from Major Street SB NB _--- No. Lanes 1 O> 1 : ---- 0; 0 l< 1; 1 0 11 0 0 0 -------------------------------------------------------- Conflicting Flows: (vph) - Bo Stop/Yield N; Ni Potential Capacity: (pcph) _ 1570 Volumes 0 65 15 651 30 5; Movement Capacity: (pcph) 1570 PHF .95 .95 ; .95 .95: .95 .951 Prob. of Queue -free State: 1.00 Grade 0 0 0 ; 0 TH Saturation Flow Rate: (pcphpl) 1700 MC's (X) 0 0 O 0; 0 0; RT Saturation Flow Rate: (pcphpl) SU/RV's (X ); 0 0 0 O; 0 0; Major LT Shared Lane Prob. CV's (%) 0 0 0 0; O 0; of Queue -free State: 1.00 PCE's i 1.1 1.1 1.1 1.1: 1.1 1.1i -------------------------------------------------------- ----------------------------------------------------------------------- Step 4: LT from Minor Street WB EB -------------------------------------------------------- Conflicting Flows: (vph) 112 Potential Capacity: (pcph) 912 Adjustment Factors Major LT, Minor TH Impedance Factor: 1.00 Vehicle Critical Follow-up Adjusted Impedance Factor: 1.00 - Maneuver Gap (tg) Time (tf) Capacity Adjustment Factor ------------------------------------------------------------------- due to Impeding Movements 1.00 - Left Turn Major Road 5.00 2.10 Movement Capacity: (pcph) - 912 Right Turn Minor Road 5.50 2.60 -------------------------------------------------------- Through Traffic Minor Road 6.00 3.30 _ Left Turn Minor Road 6.50 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 . xxxxxxxxxx:xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay -------- ------ ------ ------------------ LOS By App --------------- EB L 35 912 4.1 A �A "J594-1 EB R 6 1361 2.7 A Intersection Delay = 61.1 r moo, M W W M Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXiXXXXXXXXXXXXXXXXXXXXXX.XXXXXXX File Name ................ Streets: (N-S) CENTURY (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis.......... 6/13/9 Other Information.......... 1995 1999 2015 AM PM Two-way Stop -controlled Intersection Eastoound Westbound Northbound ; Southbound L T R� L T Ri L T Ri L T R -___ ____---- :---- ____ ---- No. Lanes 1 2( O; 1 2 1; O> 1 11 05 1 1 Stop/Yield N; Y Volumes 35 567 20: 125 675. 50; 115 0 30; 30 d 60 PHF i .95 .95 .951 .95 .95 .95� .95 .95 .95i .95 .95 .95 Grade 0 ; 0 0 ' 0 MC's (z) 0 0 0; 0 0 O; 0 0 0; 0 0 0 SU/RV's (:)i 0 0 0; O 0 O; 0 0 O; 0 0 0 CV's (:) 0 0 O; 0 0 0; 0 0 0; 0 0 0 PCE's i 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1 ________________________________________________________________________ Adjustment Factors Vehicle Maneuver -------------------------- Left Turn Major Road Right Turn Minor Road Through Traffic Minor Road Left Turn Minor Road Critical Follow-up Gap ( tg ) ____________________________ Time (tf ) 5.50 2.10 5.50 2.60 6.50 3.30 7.00 3.40 . Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX . WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB S8 ________________________________________________________ Conflicting Flows: (vph) 294 338 Potential Capacity: (Pcph) 983 933 . Movement Capacity: (pope) 983 933 Prob. of Queue -free State: 0.96 0.93 -------------------------------------------------------- Step 2: LT from Major Street we EB ________________________________________________________ Conflicting Flows: (vpn) 587 675 - Potential Capacity: (Pcph) 830 744 Movement Capacity: (Pcph) 830 744 Prob. of Queue -free State: 0.83 0.94 ________________________________________________ Step 3: TH from Minor Street N8 5B ________________________________________________________ Conflicting Flows: (vph) 1412 1422 Potential Capacity: (pcph) 163 161 Capacity Adjustment Factor due to Impeding Movements 0_78 0.78 Movement Capacity: (pcpn) 127 126 Prob. of Queue -free State: 1.00 1.00 -------------------------------------------------------- Step 4: LT from Minor Street NB S8 -------------------------------------------------------- Conflicting Flows: (vph) 1412 1402 Potential Capacity: (pcph) 132 134 . Major LT, Minor TH Impedance Factor: 0.78 0.78 Adjusted Impedance Factor: 0.83 0.83 Capacity Adjustment Factor due to Impeding Movements 0.77 0.80 Movement Capacity: (pcph) 102 107 ________________________________________________________ Intersection Performance Summary .F1owRate MoveCap SharedCaP Avg.Total Delay Movement v(pcph) Cm(pcpn) Csh(pcph) Delay LOS ______ --------- By App --------- ______ ______ ______ NB L 133 102 > 102 ____________ > 705.9 ) F 576.7 NB R 35 963 3.8 A SB L 35 107 > 107 ) 49.8 ) F 21.0 SB R 69 933 4.2 A ES L 41 744 5.1 6 0.3 W8 L 145 3?0 5.3 9 0.8 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 T.�Yt�ttttTYf tt�KitS�K2t1iz•itt1YYYY�YX�XR%MtX XT�tY WYMtYtY�k JKYY.YY W.'.1:'.1.'Y File Name ................ Streets: (N-5) CENTURY (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Anaiysis.......... 6/13/95 Other Information......... 1995 1998 015 (A5 PM Two-way Stop -controlled Intersection Eastbound Westbound Northbound Southbound L T R: L T R; L T R; L T R- i---- ---- --- ---- ------------ --------: ---- ---- ---- No. Lanes 1 2< 0; 1 2 11 O> 1 1; 0> 1 1 Stop/Yield N; Y volumes 35 561 15: 75 288 25: 40 0 55: 25 O 30 PHF .95 .95 .95; .95 .95 .95: .95 .95 .95: .95 .95 .95 Grade ; 0 0 ' 0 0 MC's. (%) 0 O 0: 0 0 Oi 0 0 O� 0 0 0 SU/RV's (x) i 0 0 0: 0 0 0: 0 0 0: 0 0 0 Cv's (3) 0 0 O; 0 0 0; 0 0 0; 0 0 0 "PCE's 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1 ------------------------------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg ) Time (tf ) -------------------------------------"'-_------------------------ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 x:::xerx:x:zxz>z��:::x::::xx.::xt:�sxsssx+xs:::•e�x��:rzsx�xzax� WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 288 144 Potential Capacity: (pcph) 989 1170 Movement Capacity: (pcph) 989 1170 Prob. of Queue -free State: 0.94 0.97 - -------------------------------------------------------- Step 2: LT from Major Street - WB EB -------------------------------------------------------- Conflicting.Flows: (vph) 576 288 Potential Capacity: (pcph) 841, 1201 - Movement Capacity: (pcph) 841 1201 Prob. of Queue -free State: 0.90 0.97 -------------------------------------------------------- Step 3: TH from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) 966 974 Potential Capacity: (pcph) 297 294 Capacity Adjustment Factor due to Impeding Movements 0.87 0.87 Movement Capacity: (pcph) 257 255 Prob. of Queue -free State: 1.00 1..00 -------------------------------------------------------- Step 4: LT from Minor Street NB SB -------------------------------------------------------- Conflicting Flows: (vph) - 967 958 Potential Capacity: (poph) 255 258 Major LT, Minor TH Impedance Factor: 0.87 0.87 Adjusted Impeaance Factor: 0.90 0.90 Capacity Adjustment Factor due to Impeding Movements 0.87 0.84 Movement Capacity: (pcph) 222 217 -------------------------------------------------------- Intersection Performance Summary F1owRate MoveCap SharedCap Avg.Total Delay Movement v(poph) Cm(pcph) Csn(pcph) -------- ------ ------ ------ Delay ------------ LOS ------ By App --------- NB L 46 222 > 222 ) 20.4 > D 11.4 N8 R 64 989 3.9 A SB L 29 217 > 217 > 19.1 > C _ 11.0 SB R 35 1170 3.2 A j EB L 41 1201 3.1 A 0.2 WB L 87 1341 4.8 A 0.9 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMYMMMMMMMMtMMMMMMM File Name ................ Streets: (N-S) SITE DRIVE (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis.......... 6/14/9 _ Other Information......... at, 2015 AM 'PM Two-way Stop -controlled Intersection - Eastbound ; Westbound, Northbound Southbound L T R; L T R; L T R; L T R ---- ---- --- ---- --------i ---- --------i ---- ---- -_-- No. Lanes 0 2 1; 0 0 O; 0 0 1; 0 0 0 Stop/Yield Y; N; �- volumes 543 75: 95; PHF .95 .95I .95 Grade ' 0 ' O 0 0 MC's (%) 0 Oi 0 SU/RV's (%): 0 0: 0 CV's (%) 0 OI li 0 PCE's 1.1 1.1� 1.1; ------------------------------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap (tg ) Time (tf ) ------------------------------------------------------------------ Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3:30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMM�MMMMMMMMMMMMMM WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1= RT from Minor Street NB SB Conflicting Flows: (vph) 272 Potential Capacity: (pcph) 1008 Movement Capacity: (pcph) - 1008 Prob. of Queue -free State: 0.89 ----------------------------------------------------- Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 M MMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMMtMMMMMMMMMMMMMMMMMX*Mt Intersection Performance Summary F1owRate MoveCap SharedCap .AV9.Totai Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App -------- ------ ------ ------------------ ------ --------- NB R 110 1008 4.0 A Intersection Delay = 1.8 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2..1 Page 1 X XXYKYXXXXXXXX'-kXXXXXXXXXXXYXXXXXYXXXXXXXXXXX tY XXX<KXXXXXXXXXYXXX File Name ................ Streets: (N-S) SITE DRIVE (E-W) HORSETOOTH Major Street Direction.... EW - Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis.......... 6/14/4 Other Information......... 99D 2015 AM PM Two-way Stop -controlled. Intersection Eastbound westbound Northbound ; Southbound L T Ri L T R: L T Ri L T R i No. Lanes 0 2 1, O O O; 0 0 1; 0 O 0 Stop/Yield 1 Y; N; Volumes 570 55: 35: PHF .95 .95: .95; Grade 0 0 ' 0 0 MC's (%) O 0! i 0� SU/RV's (%): 0 0:' 0i CV's (%) 0 0; i 0: PCE's 1.1 1.1: 1.1 ------------------------------------------------------------------------ Adjustment Factors Vehicle Critical Follow-up Maneuver Gap ( tg ) Time (tf) __________________________________________________________________. Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Roaa 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 - Page 2 Y XYXXYXXXXXYXXtXX.YXXYXYYXYYXXXYYXXYXXXXXXtXXYYXXXXXXXXYfkXXYXXXXY Worksheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street. NB.SB Conflicting Flows: (vph) 285 Potential Capacity: (pcph) 993 Movement Capacity; (pcph) 993 Prob. of Queue -free State: 0.96 -------------------------------------------------------- Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 3 X XXXYZXYYXXYXXXXYYXYYXXXYXXYYXXXYXYxXXXXXYXXXXYYXXXXXXXXXXXXXXXX Intersection Performance Summary FlowRate MOvelap SharedCap Avg.Total Delay Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS BY APP ________ ______ ______ ______ ------------ ------ --------- NB R 41 993 3.8 A Intersection Delay = 1.0 HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 Center For Microcomputers In Transportation Streets: (E-W) HORSETOOTH (N-5) SHIELDS Analyst: MD File Name* Area Type: Othe 6-14-95 AM PM Comment: 1995 1998 2015 Eastbound westbound Northbound ; Southbound L T R L T R L T R L T R --__ __ ________ __-- ______-- ____ _-______ ____---- No. Lanes 1 _ < 1 2 1 1 2 1 1 1 1 volumes 110 560 90; 115 215 2201 75 620 120; 325 495 50 Lane Width :12.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0 RTOR Vols 1Oi Oi OI 0 Lost Time :3.00 3.00 3.00,3.00 3.00 3.0013-00 3.00 3.00:3.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4; 5 6 7 8 EB Left * • ;NB Left Thru * Thru Right * Right Peas Peas WB Left * * :SB Left Thru * Thru Right * Right Pecs Peas NB Right ;EB Right SB Right IWB Right * .K Green S.OA 33.OA ;Green 7.OA 23.OA 23.OP Yellow/AR 4.0 5.0 ;Yellow/AR 0.0 0.0 5.0 Cycle Length: 105 secs Phase combination order: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- ES L 422 1770 0.275 0.143 14.6 B 21.5 C TR 1216 3647 0.591 0.333 22.6 C WB L 175 1770 0.691 0.143 23.5 C 15.1 C T 1242 3725 0.191 0.333 18.9 C P. 980 1583 0.237 0.619 6.8 B NB L 147 1770 0.537 0.076 24.8 C 30.0 D T 887 3725 0.773 0.238 31.4 D R 377 1583 0.334 0.236 25.4 D SB L 408 1770 0.838 0.410 29.8 D 21.5 C T 652 1863 0.612 0.457 17.3 C R 829 1583 0.Ot,4 0.524 9.4 S Intersection Delay = 22.7 sec/veh Intersection LOS = C Lost Time/Cycle, L = 18.0 sec Critical v/c(x) = 0.804 _______________________________________________________________________ RCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 Center For Microcomputers In Transportation Streets: (E--A) HORSE -TOOTH (N-5) SHIELDS Analyst:.'MD File Name: Area Type: Other 6-14-95 Comment: 1995 1r 2015 'AM(E) Eastbound 'Westbound ; Northbound Southbound L T R L T RL T R -___ __-_ L ---- T ____ R ---- No. Lanes ____ _- ---- 1 2 ( ____ 1 2 ________ 1 1 2 1 1 1 1 Volumes 100 490 105: 170 645 420: 105 715 120-; 370 735 140 Lane Width 112.0 12.0 ;12.0 12.0 12.0;12.0 12.0 12.0;12.0 12.0 12.0 RTOR Vo is 0; O; 01 0 Lost Time :3.00 3.00 3.00;3.00 3.00 3.00:3.00 3.00 3.00;3.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 -3 4; 5 6 7 8 EB Left * * ;NB Left Thru * ; Thru Right * Right Peas Peas W8 Left * * ;SB. Left Thru * ; Thru Right * Right Reds Peas NB Right ;EB Right SB Right IWB Right * *' Green S.OA 33.OA ;Green 7.OA 23.OA 23.OP Yellow/AR 4.0 5.0 ;Yellow/AR 0.0 0.0 5.0 Cycle Length: 105 secs Phase combination order: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay' LOS ___ Delay _____ LOS --- EB L ____ _______ 176 1770 _____ 0.597 _____ _____ .0.143 19.7 C 21.7 C TR 1208 3625 0.545 0.333 22.1 C WB L 194 1770 0.923 0.143 48.9 E 21.3 C T 1242 3725 0.574 0.333 22.4 C R 980 1583 0.451 0.619 8.3 B NB L 147 1770 0.755 0.076 38.9 D 36.1 D T 887 3725 0.892 0.238 37.5 D R 377 1583 0.334 0.238 25.4 D $B L 406 1770 0.952 0.410 ;6.2 E 32.5 D T 852 1863 0.909 0.457 29.9 D R 829 1583 0.177 0.524 10.0 B Intersection Delay =. 28.1 sec/veh Intersection '_OS = D Lost Time/Cycle, L = 12.0 sec Critical v/c(x) = _______________________________________________________________________ 0.919 APPENDIX C Center For Microcomputers In Transportation Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 HCS: Unsignalized Intersection Release 2.1 Page 2 Y YY�tfi titYYY�XlY1t��t�ttYYMY�t�tYt�ttf YYYttiiYY�XtiiY���%t�tt��t tT�Yi1���Xtx��Xi�MXtz�ztt��ix�Yt���MYM�XtY��t���F��ttXTYf #x�tY1t File Name ................ " Streets: (N-S) CENTURY (E-W) HORSETOOTH - Major Street Direction .... "EW WorkSheet for TWSC Intersection Length of Time Analyzed... 60 (min) -------------------------------------------------------- Analyst................... MD- Step 1: RT from Minor Street NB SB Date of Analysis.......... Other Information............ 6 13/95 1995 1998 2015 AM PM ________________________________________________________ Conflicting Flows: (vph) 276 328 Potential Capacity: (poph) 1003 944 Two-way Stop -controlled Intersection - - Movement Capacity: (pcph) 1003 944 Prob. of Queue -free State: 0.98 0.93 Eastbound Westbound 1 Northbound Southbound -----------------------------------------=-------------- L T R; L T R; L T R; ---- L T ____ ____ R Step 2: LT from Major Street WB EB ---- ____--__ No. Lanes 1 2( ---- ____---- O; 1 2 i---- -___ 1; O> 1 :---- 1; O> 1 1 Conflicting Flows: (vph) 551 657 Stop/Yield N; Y; Potential Capacity: (pcph) 868 761 Volumes i 35 531 20: 30 657 50: 30 0 20; 30 O 55 .Movement Capacity: (pcph) 868 761 PHF .95 .95 .951 .95 .95 .95: .95 .95 .95; .95 .95 .95 - Prob. of Queue-free.State: 0.96 0.95 Grade 1 0 i 0 1 0 0 ________________________________________________-______ MC's (%y 0 0 O; O 0 O; 0 0 0; 0 0 0 Step 3: TH from Minor Street NB SB SU/RV's (:): 0 0 O; 0 0 0; 0 0 0; O 0 0 -________________________________________________________ CV's (%) O 0 0; 0 0 0; 0 0 O; O 0 0 Conflicting Flows: (vph) 1263 1273 PCE's. 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1 Potential Capacity: (pcph) 199 196 ________________________________________________________________________ Capacity Adjustment Factor due to Impeding Movements 0.91. 0.91 Movement Capacity: (pcph) 181" 178 - Prob. of Queue -free State: 1.00 1.00 Adjustment Factors ________________________________________________________ - Step 4: LT from Minor Street N8 SB vehicle Critical Follow-up -------------------------------------------------------- Maneuver Gap (tg) Time (tf) Conflicting Flows: (vph) - 1264 1253 ------------------------------------------------------------------ Potential Capacity: (Pcph) 165 - 167 Left Turn Major Road 5.50, 2.10 Major LT, Minor TH Right Turn Minor Road 5.50 2.60 Impedance Factor: 0.91 0.91 Through Traffic Minor Road 6.50 3.30 Adjusted Impedance Factor: 0.93 0.93 Left Turn Minor Road - 7.00 _ 3.40 Capacity Adjustment Factor due to Impeding Movements 0.87 0.91 Movement Capacity: (pcph) 143 152 ________________________________________________________ Intersection Performance Summary - - FlowRate MoveCap SharedCaP Avg.Total Delay Movement v(pcph) Cm(PCPh) Csh(pcph) Delay LOS ------ By App --------- ________ ______ ______ ______ NB L 35 143 -> 143 - ------------ > 33.3 > E 22.5 - NB R 23 1003 3.7 A SB L 35 152 > 152 > 30.7 > E 14.5 SB R 64 944 4.1 A ES L 41 761 5.0 A 0.3 WB L 35 868 4.3 A 0.2 rn�mrse..__... 091yy = i a Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 1 xxxxxxxxxxxxxxxxxYxxxxxxxxxxxxxxxxxxxxxxxxx*x x�KxxxxxY*xXxtxxxxxx File Name ................ Streets: (N-S) CENTURY (E-W) HORSETOOTH Major Street Direction.... EW Length of Time Analyzed... 60 (min) Analyst ................... MD Date of Analysis.......... 6/13/95 Other Information......... � 1998 2015 b PM Two-way Stop -controlled Intersection Eastbound westbound Northbound ; Southbound i L T Ri L T R! L T Ri L T R i____ ____ ---- i---- ____ ---- :---- ____ ________ _-__ ---- No. Lanes ; 1 2< O; 1 2 1; O> 1 1; O> 1 1 Stop/Yield N; Y; Volumes ; 35 522 15; 5 276 25: 10 0 40: 25 0 30 PHF .95 .95 .95: .95 .95 .95: .95 .95 .95; .95 .95 .95 Grade 0 0 0 0 MC's (2) 0 0 Oi 0 0 0: 0- 0 0: 0 0 0 SU/RV's (°K ); 0 0 O; 0 0 O; 0 O 0; . 0 0 0 CV's (x) 0 0 0; 0 0 0: 0 0 0; 0 0 0 PCE's 1.1 1.1 ________________________________________________________________________ Adjustment Factors Vehicle Critical Follow-up Maneuver - __________________________________________________________________ Gap (tg) Time (tf) Left Turn Major Road 5.50 2.10 Right Turn Minor Road 5.50 2.60 Through Traffic Minor Road 6.50 3.30 Left Turn Minor Road 7.00 3.40 Center For Microcomputers In Transportation HCS: Unsignalized Intersection Release 2.1 Page 2 x xxxxxxxxxxxxxxxxxxxxxxx�xxxxxxxxxxxxxxxxxxxxxxxxxxxxx*xxxxxx*xx WorkSheet for TWSC Intersection -------------------------------------------------------- Step 1: RT from Minor Street NB S8 Conflicting Flows: (vph) 268 138 Potential Capacity: (pcph) 1013 1179 Movement Capacity: (pcph) 1013 1179 Prob. of Queue -free State:-_---0_95- ___________________________________ Step 2: LT from Major Street _____ ---0_97 WS EB - ________________________________________________________- Conflicting Flows: (vph) 537 276 Potential Capacity: (pcph) 883 1219 Movement Capacity: (pcph) 883 1219 Prob. of Queue -free State:-------------0.99 __________________________ - 0.97 Step 3: TH from Minor Street ___________________________________________ ________________ NB SB Conflicting Flows: (vph) _____________ 846 853 Potential Capacity: (pcph) 349 346 Capacity Adjustment Factor due to Impeding Movements 0.96 0.96 Movement Capacity: (pcph) 335 332 Prob. of Queue -free State: -------------------------------------------------------- 1.00 1.00 Step 4: LT from Minor Street ________________________________________________________ NB SB Conflicting Flows: (vph) 845_ 838 Potential Capacity: (pcph) 305 308 Major LT, Minor TH Impedance Factor: 0.96 0.96 Adjusted Impedance Factor: 0.97 0.97 Capacity Adjustment Factor due to Impeding Movements 0.94 0.93 Movement Capacity: (pcph) 287 285 ________________________________________________________ Intersection Performance Summary Flowkate MoveCap SharedCap Avg.Total Delay. Movement v(pcph) Cm(pcph) Csh(pcph) ________ ______ ______ ______ Delay ____________ LOS By App NE L 12 297 > 287 > 13.1 ______ > C ------- 5.9 NB R 46 1013 3.7 A SB L 29 285 > 285 > 14.1 > C 8.5 SB R 35 1179 3.1 A EE L 41 1219 3.1 A 0.2 WB L 6 e83 4.1 A 0.1 ?nterse�ticn D=Jay = n o HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 Center For Microcomputers in Transportation Streets: (E-W) HORSETOOTH (N-S) SHIELDS Analyst: MO File Name: Area Type: Other. 6-14-95 & PM Comment: 199 1998 2015 - _________ Eastbound Westbound Northbound Southbound ' L T R : L- T R L T R L T R No. Lanes 1 2 < : 1 2 ( 1 2. 1 : 1 1 1 Volumes 105 530 85; 110 180 210; 65 585 115: 275 460 45 Lane Width :12.0 12.0 ;12.0 12.0 :12.0 12.0 12.0112.0 12.0 12.0 RTOR Vols : 0: 0: 0: 0 Lost Time ;3.00 3.00 3.0013.00 3.00 3.0013.00 3.00 3.00;3.00 3.00 3.00 _______________________________________________________________________ Signal Operations Phase Combination 1 2 3 4 5 6 7 8 EB Left * * IN8 Left Thru * Thru Right * Right Peas Peas WB Left * * 'SB Left Thru * ' Thru Right * Right Peas Peas NB Right ;EB Right 5B Right - :WB Right Green 6.OA 27.OA :Green 6.OA 15.OA 30.OP Yellow/AR 4.0 5.0 ;Yellow/AR 0.0 0.0 5.0 Cycle Length: 98 secs Phase combination oraer: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS Delay LOS _____ ____ _______ _____ _____ _____ ___ _____ --- EB L 293 1770 0.379 0.173 15.2, C 22.4 C TR 1079 3647 0.629 0.296 23.5 C WS L 203 1770 0.571 0.173 18.6 C 20.7 C TR 1013 3424 0.424 0.296 21.3 C NB L 175 1770 0.389 0.061 16.7 C 20.1 C T 1216 3725 0.532 0.327 20.3 C R 517 1583 0.234 0.327 18.3 C SB L 311 1770 0.929 0.276 39.5 D 22.7 C T 893 1963 0.542 0.480 14.2 B R 856 1583 0.055 0.541 8.1 8 Intersection Delay = 21.5 sec/veh Intersection LOS = C Lost Time/Cycle, L = 15.0 sec Critical v/c(x) = 0.800 _______________________________________________________________________ HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4 06-14-1995 Center For MicrocomPuters In Transportation Streets: tE-W) HORSETOOTH (N-S) SHIELDS Analyst: MD File Name Area Type:*her e-14-95 AM PM Comment: 1995 1998 2015 Eastbound : Westbound Northbound Southbound L T R : L T R L T R L T R ___- ____ ________ ____ ________ ____ ________ ____ ---- No. Lanes ; 1 2 < ; 1 2 < : 1 2 1 : 1 1 1 Volumes 95 465 100: 165 615 4001 100 675 115: 360 700 135 Lane Width 112.0 12.0 112.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.0 RTOR Vols i O; 0: 0: 0 Lost Time :3.00 3.00 3.0013.00 3.00 3.00:3.00 3.00 3.00:3.00 3.00 3.00 _ Signal Operations Phase Combination 1 2 3 4: 5 6 7 8 EB Left * * :NB Left '* Thru * Thru Fight * Right Pads ; Peas WS Left * * :SB Left Thru * Thru Right * Right Peas ; Peas NB Right lEB Right SB Right :WB Right Green 5.OA 33.OA ;Green 7.OA 23.OA 23.OP Yellow/AR 4.0 5.0 ;Yellow/AR 0.0 0.0 5.0 Cycle Length: 105 secs Phase combination order: #1 #2 #5 #6 #7 _______________________________________________________________________ Intersection Performance Summary Lane Group: Adj Sat v/c g/C Approach: Mvmts Cap Flow Ratio Ratio Delay LOS ___ Delay _____ LOS --- EB _____ L ____ 172 _______ 1770 _____ 0.581 _____ 0.143 _____ 21.8 C 21.7 C TR 1208 3625 0.516 0.333 21.7 C WB L 208 1770 0.837 0.143 34.0 D 38.2 D TR 1169 3509 0.959 0.333 38.8 D NS L 147 1770 0.714 0.076 34.6 D 33.1 D T 887 3725 0.842 0.239 34.2 D R 377 1583 0.321 0.23E 25.3 D 58 L 408 1770 0.929 0.410 41.5 E 28.9 D T 852 1863 0.865 0.457 26.0 D R 829 1583 0.171 0.524 9.9 B Intersection Deia_y = 31.5 sec/ven Intersection LOS = D Lost _______________________________________________________________________ Time/Cycle. L = 15.0 sec Critical v/c(x) = 0.945 APPENDIX B MATME'NJ. DELICH, P.E. 3413 BANYAN AVENUE LOVELAND, CO 80538 TABULAR SUMMARY OF VEHICLE COUNTS Observer Date 4 Z g 95 Day (t l IQ V city FO ti Y CO(_ L r U S R = Rip, taro t h e \� r. b O ()A S= Stra,Om INTERSECTION OF = AND - L = Lott taro C�..o�ci1Sor EIuINS I tram NORTH tmm SOIfTFI NOonn R I S I L I Total II R I S I L I Total Soutn Se�n�r\\� from EAST fmm WEST R I S I L I Total I R S I L I Tmal T� Wtrn T� 1'•^'o 1112112°I /`! 206 II't�!,12I1012 o N 466 I ISM 1�31/ III 5� I Ito .4� 1112 1�v I h 2 ,' ICI 461 I0 12roY is Ilt 3 12 Ill/ 't It, Iz 12i M 3.2 II -K 11 I'slrzl I<'; p21 11�11-1 i4 130z 11 2 4 125-nl 112 111 I �I Ireb p 2t1� II s� �. Ili�llool- I �z II 1 .1221 B ?2 1 blr-,� I II 11 I22Il 2 IS II I I I tl II c 3,'$'adI 'Iv59 27 I i`l!, pII 'I I h6 11 , 4 IIAioll51 Ito I'oo 118 k1l I/ 61 111221 11 R14' II I I II I I I Y II I I I II I I I II II II I I I II I I I 9 II I I I II I I I II II _ 11 1 1 I II 1 1 1 II II 1 1 I 11 I II II 1 1 1 11 1 1 1 11 111 1 1 It I I I II II I 1 1 1 II 1 1 1 11 11 1 1 1 II 1 1 1 II II 4.'-0113z11('1119 12 F1124 I6a129 12 1 If. 11 -12- Ih6l1 1116 Il Z 101 1a'1 II13I ti.t�=� 11 ;1111011os 3•oc� 11 ), 1=,c 12112, Il s'r �e Il 2211Ix 1 I 65 IS11 113 1117(01 731 z9 1 11 2=1 13j I a (,I Rc N 499 111r")l iyy 13t,1 2197 112 I .In 12 9 1 / II u55 II 5- '-11 11CIz. III l0 5EI 119s12iz.h-',, I 32r5- 11 »1120 1231 / O II SaS III/06 II I I I II I I I � II I. I I II I I I I II -;..;II137I7o1I3�2I12oollri I6�( Ihzl�h IIz091 II:,t9I6ls II6'?1 i I III00I40ICIS kioo 11 IM H3937- �I MATTHEW J. DELICH, P.E. 3413 BANYAN AVENUE LOVELAND, CO 80538 TABULAR SUMMARY OFF VEHICLE COUNTS Observer Date�ZTDay f uoiOAY city r,),'T (?OLWAJ $ R . Rignt tum i, on.'\ h S = Stmpm INTERSECTION OF P rat,) �^ AND �o�' = L = Left true cC•..-1 i,r .� �ce�..i a. � TIME I fmmT from SOUTH R I S I L I Total II R I S I L I Total Norm• $Outs ei o�,1.. Rio., fmm WEST Test II R I S I L I Total West TOTAL from EAST R I S I L I Total `l:30 II Ci 10 14 1 3 11 14 1 0 IN 1 /S 1 2 119 I I1 I I II 96 I 1233 11 35z II 3 .0 n%4T 119 10 1 / I O Ic I I 1 2, 115 n I 1 I ll 114 Ia IIµ1 aG�1 0'�11 Y2 o II I O IcG I I� 113 0 IS'I 1 -2 11�. 1°i-� I I I 2q 113 11g51 g 1 20(,112g() 11 3i 1 o 1 Ll I I 1 II 14 O 1 13 1 1 z II`. 19t II 1/06 I '0: 1 �I II 2c II I I II I I N II I I I I1131195 I I I II II I S z II 132'1 So 11 105'112'13ti 13 1 426 I 1113 I 30 111zS( II I I I I;t4 I II I I I N II I I I I I I I II II II I I I II I I I N I I I I I I I I II II I I II I I I II II I I I I I I II II I I I II I I I U I I I II I I I II II I I I I II I I I N II I I I II t ( I II II II I I I II I I N II I I I II I I I II II 430 11101 1 14 1 Is 114 1 O 171 11 1 z(o Ilu IZ44-16-1?w11512131 7 Izzs 1142sll sl 44s I1101 O I 1 12 Its 1 1 17 1 IS 1 33 1111 IZ4 1101Z70 11 12171 il Iz3411SO411 S37 s00 1115'1 0 110 1 Z.s 11 sl 0 1 8 11 4 IZ7Z1 8 IZ 1 s41 11 579 Iz 515II 10 171ZS11r10 1&I II 3 31 31513 11S1207I 63Z1157&9 430-53I53I 1 9I 83 N19I 1 I30I 5-0 2o67-u z145 I I 73 j J it 1 II r 11 11 APPENDIX A VII. CONCLUSIONS ' This study assessed the transportation needs associated with increasing background traffic volumes and the development of the Poudre Valley Plaza. Identified improvements are stated below for both short and long range futures. Short Range Improvements 1. A westbound right -turn lane on Horsetooth Road at Shields Street. 2. A southbound left -turn lane on Shields Street at Arbor Avenue. 3. A taper and radius for right -turning traffic from eastbound Horsetooth Road to Century Drive. 4. A right -turn deceleration lane on Horsetooth Road at the site access drive. 5. Two lane approach on Arbor Avenue approaching Shields Street. 6. A taper and radius on Shields Street approaching Arbor Avenue. Long Range Improvements 1. Widen Shields Street to four lane roadways with a center left - turn lane. 2. An additional southbound left -turn lane on the Shields Street approach to Horsetooth Road. 3. A northbound right -turn lane on Shields Street at Arbor Avenue. With the above noted improvements, acceptable traffic operations can be maintained in the immediate area of the Poudre Valley Plaza. These improvements can be expected to mitigate traffic associated with the Poudre Valley Plaza and the general growth in traffic volumes. C VI. DISCUSSION/DESIGN CONSIDERATIONS Each identified improvement was reviewed for the purpose of defining storage length requirements, taper lengths, etc. This resulted in the findings stated below. When widened roadway sections are needed, the widening is assumed to extend through and beyond the study area and, therefore, further definition of these improvements was not necessary. - The right -turn lane on the westbound Horsetooth Road approaching Shields Street should be 300 feet long. - The southbound left -turn lane on Shields Street at Arbor Avenue should have 50-75 feet of storage. Given the 500 foot spacing between Horsetooth Road and Arbor Avenue, a stacking distance problem is not anticipated. - The right -turn taper on eastbound Horsetooth Road at Century Drive should be approximately 100 feet. Additionally, a large radius (20-30 feet) should be provided at the end of the taper. - A full width right -turn lane on eastbound Horsetooth Road at the right-in/right-out site access should be constructed to allow safe deceleration and an efficient right turn into the site. A second southbound left -turn lane on the Shields Street approach to Horsetooth Road is needed in the long range future. The two combined lanes should provide 400-500 feet of vehicle storage. - The northbound right -turn lane on Shields Street at Arbor Avenue should be 310 feet including taper. The above storage requirements are based upon long range future traffic volumes which may or may not materialize. Accordingly, monitoring the street system in the vicinity of the Poudre Valley Plaza is appropriate. For example, if an expanded roadway system is implemented, a major shift in turning movement traffic volumes may occur. If so, the need for a southbound double left -turn lane on Shields Street at Horsetooth Road may be eliminated. 7 - Widening of Shields Street to a five lane cross section, with two through lanes in each direction and a center left -turn lane; Adding an additional southbound left -turn lane at the Horsetooth/Shields intersection; Providing a northbound right -turn lane on Shields Street at Arbor Avenue. Some of the improvements recommended in both the short range and long range futures are due to background traffic. System wide improvements elswhere, may mitigate some of the above recommendations. Periodic evaluation should be conducted by the City or through traffic studies for other developments. N. Table 4 Long Range Peak Hour Operation Level of Service Intersection AM PM Horsetooth/Shields (signal) C D Horsetooth/Driveway (stop sign) NB RT A A Arbor/Site Drive (stop sign) SB LT/RT A A EB LT A A Century/Site Drive (stop sign) EB LT/RT A B Horsetooth/Century (stop sign) NB LT/T F F NB RT A A SB LT/T D F SB RT A A EB LT A B WB LT B B Horsetooth/Century (signal) B B Arbor/Shields (stop sign) WB LT D F WB RT A A SB LT B B Table 3 Short Range Peak Hour Operation Level of Service Intersection AM PM Horsetooth/Shields (signal) C D Horsetooth/Driveway (stop sign) NB RT A A Arbor/Site Drive (stop sign) SB LT/RT A A EB LT A A Century/Site Drive (stop sign) EB LT/RT A A Horsetooth/Century (stop sign) NB LT/T D F NB RT A A SB LT/T C F SB RT A A EB LT A B WB LT A B Arbor/Shields (stop sign) WB LT E F WB RT B B SB LT B B V. TRANSPORTATION IMPACTS The key intersections were analyzed using the unsignalized and signalized analysis techniques as published in the most recent "Highway Capacity Manual." Table 3 shows the level of service at the key intersections in the short range future. Calculation forms are provided in Appendix C. The analyzed intersections operate acceptably, except for minor street left turns at the Horsetooth/Century and Arbor/ Shields intersections in the afternoon peak hour. Occasional level of service E and F operation for minor street left turns is normal during some peak hours on busy streets in Fort Collins. Signals are not warranted at the Arbor/Shields. intersection based upon the projected peak hour traffic. At the Horsetooth/Century intersection, traffic signals are marginally warranted based upon, forecasted afternoon peak hour traffic volumes. Traffic signal installation is not assumed given uncertainties associated with traffic volume projections. In order to obtain the levels of service indicated on Table 3, traffic volumes and applicable warrants were evaluated. This resulted in the determination that the following improvements are needed in the short range future: - A right -turn lane on the westbound Horsetooth Road approach to Shields Street; - Construction of a southbound left -turn lane on Shields Street at the Arbor Avenue intersection; - A taper and increased radius on eastbound Horsetooth Road approaching Century Drive for right -turning vehicles; - A right -turn deceleration lane at the site access on Horsetooth Road; - Two outbound (from the site) lanes on the Arbor Avenue approaches to Shields Street; - A northbound taper and radius on Shields Street approaching Arbor Avenue. Table 4 shows operating levels of service at the key intersections in the long range future. As shown, critical left - turn movements continue to operate at less than desirable levels at the Horsetooth/Century and Shields/Arbor intersections. A calculation assuming traffic signal installation at the Horsetooth/ Century intersection indicated that LOS B can be obtained during both peak hours. At the Shields/Arbor intersection, traffic signals do not appear to be warranted and, therefore, signalization was not given further consideration. To obtain the levels of service indicated on Table 4, the .following improvements were deemed appropriate: 5 0 o00 O M �- 85/450 - o\ � OO2 /4040 HORSETOOTH 0/100 r NOM. 1040 f r 10/600 — I 75/75 u7 0 0 I n NOM./160 ��� LO 0 z N � W Site co 1111 20 60 %I NOM./NOM. NOM. 70 30/30 - Ln � NOM./60 C\ �C3 N C> O Z 0 LO �- 0 70 o z NOM./1265 85/145 NOM./55 95/1040 NOM./40 o u7 Lo 0 z o Q0 Z: W U 85/85 -1 / o� CD �o oz z I15 L o � � r 40 NOM•� � � o SITE / TOTAL Rounded to the Nearest 5 Vehicles. LONG RANGE AFTERNOON PEAK HOUR TRAFFIC A& N Figure 8 CDN c 30/250 o 30 0/19/190 0 0/200 —/ 17 5/705 — o 0 0 NOM./150 --� 0 z 0 CD o-10/25 jf-15/20 HORSETOOTH 65 I 55 -� ZZ In n Site LO L NOM./NOM. 25/25 NOM./70 -� LONG RANGE MORNING PEAK HOUR TRAFFIC 0 o 0/35 NOM./580 ,--• 65/80 NOM./55 -" ) } r 35/1075 — o o NOM./40 -� o Z 0 z } LO Q LO Ln to W U 30/30 } 5/5 CD co z mio oz z 00 o UNOM•'S 5 ��' � rNOM•I2 goer r; 004,00 NOM. �15 o 0 �r NOM �5 NOM �NOM•'y it so SITE / TOTAL Rounded to the Nearest 5 Vehicles. N Figure 7 - 85/420 f NOM./645 T 0/170 - 0/100 r 10/490 ^ N NOM./105 o o Un O z -10/25 20/35 0 0 N HORSETOOTH n5� I -e LO 1-1 LO M ./00, `♦ f Site 0 oLO �L NOM./NOM. + NOM. /30 30/30 —� NOM./15 O Co o � �— 0/50 O z o -.— NOM./1125 J + �, ,r-- 85/125 NOM./35 --� ') f I 95/945 — NOM./20 -� un o �z �LO cc 0 O z O co 3 W ? i U 85/85 —� } 5/5 3 O� �o oz z o� �NO�`•I�0 o�� NoM•I15 � N g o Z o— too. o v SITE / TOTAL Rounded to the Nearest 5 Vehicles. SHORT RANGE AFTERNOON PEAK HOUR TRAFFIC Figure 6 owLO l010W 0/110 5/560 NOM./90 30/220 +- NOM./215 0/115 LO o 0 N L� 0 z o� 1�-10/15 r-15/25 m� �Ln z z HORSETOOTH 50 � r 55-� u7 4z LO Site LO ,_ L In � NOM./NOM. y - NOM./?5 25/25 NOM./5 SHORT RANGE MORNING PEAK HOUR TRAFFIC 0 � o �- 0/25 o z o NOM./480 r + �, r 65/75 NOM/35 35 935 NOM./15 - �Z LO"I CD 0 z � Q u-) to o ~ , to z Z Jl 0 SITE / TOTAL Rounded to the Nearest 5 Vehicles. N Figure 5 Table 2 Existing Peak Hour Operation Level of Service Intersection AM PM Horsetooth/Shields (signal) C D Harmony/Century (stop sign) NB LT/T C E NB RT A A SB LT/T C E SB RT A A EB LT A A WB LT A A 00 r)„ - 210/400 LO to � � `" -180/615 r 110/165 10Y95 O 530 465 o to 85/100 Lo2LO HORSETOOTH 0 �— 25/50 'n o " 460/1095 J + � /-- 5/30 35/35 870 885 o 0 15/20 AM / PM Rounded to the Nearest 5 Vehicles. N EXISTING PEAK HOUR TRAFFIC Figure 4 IV. TRAFFIC VOLUMES AND TRIP ASSIGNMENT 1. Morning and afternoon peak hour traffic counts were obtained at the key intersections. Raw count data is provided in Appendix A. The traffic data is shown in Figure 4. Balancing adjustments were made at the Horsetooth/Century intersection. This was done since the date of the count was after CR17 was closed to the south of Fort Collins. The Horsetooth/Shields intersection is signalized. Table 2 shows the level of service (LOS) analysis using the morning and afternoon peak hour traffic shown in Figure 4. Calculation forms are provided in Appendix B. All of the key Intersections operate acceptably. It should be noted that northbound and southbound left turn/through movements currently operate at LOS E at the Horsetooth/Century intersection in the afternoon peak hour. This is considered normal for critical movements at urban intersections under stop sign control. Traffic volume adjustments were made to through volumes on Horsetooth Road. ' These volumes were factored by 0.60 to account for uneven distribution in the two travel lanes. These adjustments result in more realistic operating levels of service as documented by field measurements. Trip Assignment iThe trip assignment is the product of the trip generation and trip distribution process. Both short range and long range trip assignments were performed. Since the Poudre Valley Plaza is assumed to be fully developed in the short term and the directional distribution is expected to remain constant, site traffic volumes for both the short and long range futures are identical. Figures 5 and 6 show the short range (year 1998) peak hour traffic. The site generated traffic was combined with the background traffic to determine the total traffic at the key intersections. Background traffic is defined as the traffic that is or will be on the area street system, but is not related to this specific development. The background traffic includes general increases of traffic on Horsetooth Road and traffic obtained from other traffic studies for proposed developments in this area. These specific studies include Stockbridge/Mountainridge Farms and Rose Tree Village. The volumes reflect the access shown on the site plan (Figure 2). Short range traffic volumes included development of about 100 single family residences to the east of the site. Figures 7 and a show long range (year 2015) peak hour traffic. In addition to the residential development east of the site for the short range future, an office complex having 70,000-75,000 square feet is assumed south of Arbor Avenue between Shields Street and Century Drive. 4 I 5%-10% w o� F- CC Mu 2 N HORSETOOTH ROAD A& N NO SCALE 45%-50% TRIP DISTRIBUTION Figure 3 III. TRIP DISTRIBUTION The overall directional distribution of the site generated traffic was based upon the existing travel patterns at the area intersections and in consideration of trip attractions and productions in this area of Fort Collins. Site specific access was determined on the basis of the shortest travel path to each building within the Poudre Valley Plaza. Figure 3 shows the trip distribution used in subsequent traffic assignments. 3 II. TRIP GENERATION Trip generation was estimated using Trip Generation, 5th Edition, ITE. Table 1 shows the daily and peak hour trip generation for this development. A trip is defined as a one way vehicle movement from origin to destination. The origin or destination of a generated trip would be within the site area. Poudre Valley Plaza is expected to generate 229 morning peak hour trips, 397 afternoon peak hour trips, and 3628 daily trips. It should be noted that reductions for captured and internal trips are not reflected in the number of trips stated above. Accordingly, a conservative approach was taken. Table 1 Trip Generation Land Use Bldg A - Bank - 3500 SF Bldg A - Office - 5500 SF Bldg B - Retail - 3000 SF Bldg B - Office - 3000 SF Bldg C - Retail - 3000 SF Bldg C - Office - 3000 SF Bldg D - Restaurant 6000 SF Bldg E - Retail - 8600 SF Bldg E - Office - 8600 SF Bldg F - Retail - 8000 SF Bldg F - Office - 8000 SF Bldg G - Townhome - 7 DU Bldg G - Retail - 9600 SF TOTAL Daily A.M. Peak P.M. Peak Trips Trips Trips Trips Trips in out in out 492• 12 5 27 34 108 13 1 3 12 122 2 2 8 7 59 7 1 1 7 122 2 2 8 7 59 7 1 1 7 1232 47 47 53 45 350 5 6 24 18 170 20 2 4 19 325 5 5 22 18 158 19 3 3 18 41 1 2 3 1 390 6 6 27 20 3628 146 83 184 213 2 F-I W. HORSETOOTH ROAD E� c ; T�lm Ll A& N NO SCALE F- PVENv i SITE PLAN Figure 2 ii 1544065 5 WDowntown JOE jjj� I Par Golf Lours 0 11 E I 11-1. L IN tic; 7 7.. 010A S UNIVER 'RX 41p. rot iAAlfv T -it] T i E] J P, '7 S, D! IWO, Collins it U i r park 10' 0 1 ._N X� Z" .11, 15 vi wa sal 15/C BM 495, os- T. IF 06 % \2, ll)rive4 l, i t neajp I,- (1:3: rakes k I V _U It -2 Rek t 0 A_ v. Grav It Pits I ' HORSET'00TH • F Onieg� It 7 to A r Dry POUDRE VALLEY'"' I I 9/,5� C Lake Ufil Gravel j PLAZA 30 Pit LU Me Clellands Harmony Hai- 72 ONY HARMONY �==� 26Z� Cem 1. L 0 1I. 50,0 �6 lit 152t5qOO ILI LU __1 "K, lu 49t6 D11CH NO SCALE I SITE LOCATION Figure 1 I I I. INTRODUCTION I This traffic study for the Poudre Valley Plaza addresses the capacity, geometric, and traffic control requirements associated with a proposed mixed use development south of Horsetooth Road, located between Shields Street and Century Drive in Fort Collins, Colorado. The site location is shown in Figure 1. Existing and Proposed Site Uses The land for this development is currently vacant. The applicant is proposing to construct seven buildings. It is expected that there will be a blend of office, retail, service and residential land uses. More specifically, 32,200 square feet of retail space, 28,100 square feet of office space, a 3500 square foot bank, a 6500 square foot restaurant and 7 townhomes are planned. The land in the area is flat. Figure 2 shows a site plan of the proposed Poudre Valley Plaza. :Site Access Access is proposed from Horsetooth Road, Century Drive, and Arbor Avenue. Arbor Avenue is a new east -west connector roadway between Shields Street and Century Drive. Both the Century Drive and Arbor Avenue accesses are intended to allow full turning movements. The Horsetooth Road access is currently planned as a right-in/right-out driveway. Existing Land Uses Land uses in the vicinity of the subject property are primarily small scale commercial and residential. There is commercial development along the northside of Horsetooth at both the Century Drive and Shields Street intersections. These developments are typically convenience stores, gas stations, and other small tenant retail users. Other areas surrounding the site are either residential developments or undeveloped land. 1 POUDRE VALLEY PLAZA SITE ACCESS STUDY FORT COLLINS, COLORADO JUNE 1995 Prepared for: Shields Street Investors, LLC P.O. Box 272030 Fort Collins, CO 80527 Prepared by: MATTHEW J. DELICH, P.E. 3413 Banyan Avenue Loveland, CO 80538 Phone: 970-669-2061 FAX: 970-669-5034