HomeMy WebLinkAboutREGISTRY RIDGE, 4TH FILING - PDP - 32-95G - CORRESPONDENCE - REVISIONSd. See engineering plans
e. A trail connection has been added
f. See Drainage Report
g. See Drainage Report
h. See Drainage Report
i. Site plan has been revised
j. Site plan has been revised
k. There are now three housing models on site
Sinc ,
Rachel Linder
Project Manager
VF Ripley Associates
8. Stormwater Utility
a. See Grading and Drainage plans
9. Transportation Planning
a. A bike path has been added connecting the 3`d and 4t' Filings
b. Front door street connections have been made on all units
10. Engineering Pavement Department (no comments)
11. Transfort (no comments)
12. AT&T (no comments)
13. Building Inspection Department
a. Acknowledged
14. Mapping and Drafting
a. See Plat
b. See Plat
c. See Plat
d. See Site Plan
e. See Site Plan
15. Utility Education Specialist
a. See Landscape Plan
16. Advanced Planning
a. All of the buildings have a revised orientation
b. See Site Plan
c. Front porches have been added onto all units to provide a more obvious front
entry, See Architectural Elevations
d. Three housing models are being used
e. At least three color schemes will be used, see color samples
17. Traffic Operations
a. Roundabout stripping already exists on site, stripping has been added on the site
plan to provide other pedestrian connections
b. No parking signs will be added
18. Streets Departments (no comments)
19. Parks Planning Department (no comments)
20. Post Office (no comments)
21. Staff Review Comments;
a. Bataan Drive has a revised layout
b. The alleys have been removed and replaced with private drives
c. The building orientation has been adjusted
April 5, 2001
Steve Olt
Project Planner
281 North College Ave.
Fort Collins, CO 80522
RE: Registry Ridge 4t" Filing
Dear Steve Olt,
VF RIPLEY
ASSOCIATES INC.
Landscape Architecture
Urban Design
Planning
401 West Mountain Avenue
Suite _201
Fun Collins. CO 80521-2604
PHON'F. (970) 224-5828
FAX 1970i 224-1662
The comments below address the issues from the staff letter dated December 7, 2000.
1. Public Service Company
a. The utility easements should now be adequate
2. Fort Collins — Loveland Water District
a. Acknowledged
3. Thompson School District
a. Noted
4. Poudre Fire Authority
a. See Utility Plans
b. Acknowledged, See architectural elevations
c. Site plan has been revised to have units addressed off of public streets
d. New street names have been used
e. There are no alleys on the site, rather private drives
5. Natural Resources Department (no comments)
6. Zoning Department
a. Three different housing types are now being used
b. The site is one lot with building envelopes, all setbacks are being met
7. Engineering Department
a. All of the streets have been renamed
b. The streets and site have been redesigned
c. The alleys have become private drives
d. See site plan and engineering plans that address the rest of the comments