HomeMy WebLinkAboutHEARTHFIRE PUD, 1ST FILING - FINAL - 31-95D - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDY (3)Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
i ZXiiiZXXiiiZYXiZiZXiiXXYZXiXiXiZiYXXiiiXXXZiiZXYiZiXXiiiZXZZXXX
File Name ................
Streets: (N-S) site road (E-W) douglas
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... njd
Date of Analysis.......... 7/14/96
Other Information......... 1996 2000 2015 am pm
Two-way Stop -controlled Intersection
Eastbound ; Westbound ; Northbound ; Southbound
L T R; L T R; L T R; L T R
�---- ---- ----;---- ---- ---- ---- ----
No. Lanes 1 0 1 1; 0> 1 0; 1 0 1; 0. 0 0
Stop/Yield ; N; N; i
Volumes ; 71 88: 30 74 ; 43 16:
PHF .95 .95; .95 .95 .95 .95:
Grade 0 0 0 0
MC's (%) 0 0; 0 0 0 0;
SU/RV's (%)1 0 0; 0 0 1 0 0;
CV's (%) 0 0; 0 0 0 0;
PCE's1.1 1.1: 1.1 1.1 i 1.1 1.1;
Adjustment Factors
Vehicle Critical
Maneuver Gap (tg)
----------------------------------------------
Left Turn Major Road 5.00
Right Turn Minor Road 5.50
Through Traffic Minor Road 6.00
Left Turn Minor Road 6.50
Follow-up
Time (tf)
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
WorkSheet for TWSC Intersection
--------------------------------------------
Step 1: RT from Minor Street
NB
---------------------------------------------
Conflicting Flows: (vph)
71
Potential Capacity: (pcph)
1275
Movement Capacity: (pcph)
1275
Prob. of Queue -free State:
0.99
---------------------------------------------
Step 2: LT from Major Street
WB
---------------------------------------------
Conflicting Flows: (vph)
159
Potential Capacity: (pcph)
1440
Movement Capacity: (pcph)
1440
Prob. of Queue -free State:
0.98
TH Saturation Flow Rate: (pcphpl)
1700
Major LT Shared Lane Prob.
of Queue -free : State-----------------
0_97-
-------------- --tate
.� Step 4: LT from Minor Street
•,,
NB
------------ ________________________________
Conflicting Flows: (vph)
175
Potential Capacity: (pcph)
838
Major LT. Minor TH
Impedance Factor:
0.97
Adjusted Impedance Factor:
0.97
Capacity Adjustment Factor
due to Impeding Movements
0.97
Movement Capacity: (pcph)
817
SB
EB
SB
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
YYYYYYYXX#YYYYYY Y XXXYYYX####Y#YYYYXXYY#YY#YYX#YYYYYY#YYYY
Intersection Performance Summary
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------ ------------ ------ -------
NB L 50 817 4.7 A
4.5
NB R - 19 1275 2.9 A
WB L 35 1440 2.6 A 0.7
Intersection Delay = 1.1
•
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
ZZZZZZZZZZZZYZZZYZZYZZZZZZZZZZZZZZZXXZZZZZYXZZZ ZZZZZ ZZZZZZ
File Name --
Streets: (N-S) site road (E-W) douglas
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... njd
Date of Analysis.......... 7/14/96
Other Information......... 1996 2000 2015 am pm
Two-way Stop -controlled Intersection
Eastbound ; Westbound ; Northbound ; Southbound
L T R; L T R; L T R; L T R
---- ---- I ---- --------'---- ---- --- ---- ---- ----
No. Lanes 1 0 1 1; 0> 1 0; 1 0 1; 0 0 0
Stop/Yield N; N; 1
Volumes 1' 61 25: 9 44 66 26:
PHF .95 .95: .95 .95 .95 .951
Grade 0 0 0 0
MC's (%) 0 0: 0 0 i 0 0:
SU/RV's (%)1 0 0; 0 0 0 0;
PCE's 1.1 1.1; 1.1 1.1 ; 1.1 1.1;
-------------- ----------------------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
YYZZYYYXXYXZZZZXYXZZZXYXYXYYYXYXI XZXXX ZXYZXX XZYYXYYZZ YXYXXYZXYXX
WorkSheet for TWSC Intersection
-------------------------------------------
Step 1: RT from Minor Street NB
Conflicting Flows: (vph)
61
Potential Capacity: (pcph)
1290
Movement Capacity: (pcph)
1290
Prob. of Queue -free State:
0.96
-------------------------------------------------
Step 2: LT from Major Street
WB
-------------------------------------------------
Conflicting Flows: (vph)
86
Potential Capacity: (pcph)
1560
Movement Capacity: (pcph)
1560
Prob. of Queue -free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
Major LT Shared Lane Prob.
of Queue -free State:
0.99
-------------------------------------------------
Step 4: LT from Minor Street -
NS
-------------------------------------------------
Conflicting Flows: (vph)
114
Potential Capacity: (pcph)
910
Major LT. Minor TH
Impedance Factor:
0,99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
904
SB
EB
S8
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 3
xxxxXxxxx:xxxx:xxxX:x:x:xXXX::xxxxXXxX:XXx:X:::X:xxx:X:xxxxxxxxx
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement
--------
v(pcph) Cm(pcph) Csh(pcph)
------ ------ ------
Delay
------------
LOS By App
NB L
76 904 _
4.3
------ ---------
A
4.5
NB R
30 1290
2.9
A
WB L
10 1560
2.3
A 0.3
Intersection Delay =
1.8
a
HCS: Unsignalized Intersections Release 2.1c Page
1
HCS: Unsignalized Intersections Release 2.1c Page
vasvvaaaaanavvvvvaevna.vay..........a.vay.anavaysvaa.................v
.vvas.asavasysvvvss uvv.vsvvvsasysa as saasv vsvvevevaanavvavassvaasaavv
Center For Microcomputers In Transportation
Ceatar Por Microcomputers Ia Transportation
University of Florida
University of Florida
512 Weil Hall
512 Weil Hall
Gainesville, FL 32611-2083
Gainesville, FL 32611-2093
Ph: (904) 392-0378
Ph: (904) 392-0378
vsassaavvvvve,isa.a.vv............... 0............
aa..........avvvvsvva
...........................=.................a.........
n............
Streets: (N-S) LEMAY
(E-W) COUNTRY CLUB
Streets: (N-S) LHMAY
(E-W) COUNTRY CLUB
Analyst ................... DID
Analyst................... MD
Date of Analysis.......... 7/4/96
Other Information......... 1996 2000
20
PM
Date of Analysis.......... 7/4/96
Other Information......... 1996 2000
2015
AM PM
All -way Stop -controlled Intersection
All -way Stop -controlled Intersection
aanasaysavvanansansvavvaaaaaana..............................
s.........
...nanasa.a..avvv.ava..ay.avvaavaas..saa.............naysvaaavaay.aaaw
Eastbound
Westbound
Northbound
Southbound
gastbound
Westbound
Northbound
Southbound
L T R
L T
R
L
T R
----
L T
'___
R
____
L T R
L T
R
L T
R
L T-
R
No. Lanes
'--- --__ "'_
0 > 1 < 0
-'-- ---- --'-
0 > 1 <
0
-'--
0 >
----
1 c 0
----
0 > 1
c 0
No. Lanes
"--
0 > 1 < 0
--- ----
0 > 1 <
0
--- ----
0 > 1
"'
< 0
---- ----
0 > 1
----
< 0
Volumes
6 52 96
138. 56
4
44
73, 46
17 153
5
Volumes
6 87 55
86 73
25
82 166 160
9 - 88
2
PEP
.95 .95 .95
.95 .95
.95
.95
.95 .95
.95 .95
.95
PEP
.95 .95 .95
.95 .95
.95
.95 .95 .95
.95 .95
.95
-----------__---------_'__" ____---------"'---------------------------
Volume Summary and Capacity Analysis WorkSheet
Volume S,--ry and Capacity Analysis WorkSheet
_'_--------------------------------------------_'___-'------------___'_
EB
WB
NB
SB
------------------------------------------------------------------_----
RH
WB
NB
SB
-----------------------------------------------------------------------
LT Plow Rate
6
145
46
18
---------------------------------------------------------'_'__'_--'____
LT Flow Rate
6
91
86
9
RT Flow Rate
101
4
48
5
RT'Flow Rate
58
26
168
2
Approach Plow Rate
162
208
171
184
Approach Flow Rate
156
194
429
104
Proportion LT
0.04
0.70
0.27
0.10
Proportion LT
0.04
0.47
0.20
0.09
Proportion RT
0.62
0.02
0.28
0.03
Proportion RT
0.37
0.13
0.39
0.02
Opposing Approach Flow Rate
208
162
184
171
Opposing Approach Flow Rate
194
156
104
429
Conflicting Approaches Flow Rate
355
355
370
370
Conflicting Approaches Plow Rate
533
533
350
350
Proportion, Subject Approach Flow Rate
0.22
0.29
0.24
0.25
Proportion, Subject Approach Flow Rate
0.18
0.22
0.49
0.12
Proportion, Opposing Approach Flow Rate
0.29
0.22
0.25
0.24
Proportion, Opposing Approach Flow Rate
0.22
0.18
0.12
0.49
Lanes on Subject Approach
1
1
1
1
Lanes on Subject Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
Lanes on Opposing Approach
1
1
1
1
IT, Opposing Approach
145
6
18
46
IT, Opposing Approach
91
6
9
86
RT, Opposing Approach
4
101
5
48
RT, Opposing Approach
26
58
2
168
IT, Conflicting Approaches
64
64
151
151
IT, Conflicting Approaches
95
95
97
97
RT, Conflicting Approaches
53
53
105
105
RT, Conflicting Approaches
170
170
84
84
Proportion LT, Opposing Approach
0.70
0.04
0.10
0.27
Proportion IT, Opposing Approach
0.47
0.04
0.09
0.20
Proportion RT, Opposing Approach
0.02
0.62
0.03
0.28
Proportion RT, Opposing Approach
0.13
0.37
0.02
0.39
Proportion LT, Conflicting Approaches
0.18
0.18
0.41
0.41
Proportion IT, Conflicting Approaches
0.18
0.18
0.28
0.28
Proportion RT, Conflicting Approaches
0.15
0.15
0.28
0.28
Proportion RT, Conflicting Approaches
0.32
0.32
0.24
0.24
Approach Capacity
______-__----------------------------------
310
"'_-----__"'--------------
648
452
457
Approach Capacity
359
548
635
565
Intersection Performance Summary
Intersection Performance Summary
Approach Approach
V/C
Average
Approach Approach
V/C
Average
Movement Flow Rate Capacity
__________ __________ _________
Ratio
_______
Total Delay
___________
LOS
____
Movement Flow Rate Capacity
Ratio
Total Delay
LOS
EB 162 310
0.52
7.3
B
EB 156 359
0.43
5.2
B
WB 208 648
0.32
3.4
A
WB -194 548
0.35
3.8
A
NB 171 452
0.38
4.2
A
NB 429 635
0.68
13.0
C
SB 184 457
0.40
4.6
A
SB 104 565
0.18
2.0
A
Intersection Delay
a 4.8
Intersection Delay
. 8.3
Level of Service (Intersection)
a A
Level of Service (Intersection)
. B
HCS: Unsignalized Intersections Release 2.1c Page
maaama...........=...................av a avaa... =...avv........ay.m.aa
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
mmmm.nmmmnn.III .o.......vu...vv .......... ...... as.......... a.......avv
Streets: (N-S) ABBOTSFORD (E-W) GREGORY 4=03_
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 7/4/96
Other Information......... 1996 2000 O15 PM
Two-way Stop -controlled Intersection
v.oua.aa.va.Z..".ay..v avaa.a.vavavavvnna.navvvs.vvvavvvvvaaaaavaa
Eastbound Westbound Northbound Southbound
L T R I L T R I L T R
No. Lanes 1 0 > 1 0 1 0 1 < 0 1 0 0 0 1 0 > 1 < 0
Stop/Yield
Volumes
PEP
Grade
MCI (t)
SU/RV'a M
CV' e M
PCE's
------------
N
0 84
.95 .95
0
1.10
----------------
42
.95
0
3
.95
13 0 0
95 .95 .95
0
1 11.10 1.10 1.10
-
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Unsignalized Intersections Release 2.1c
Worksheet for TWSC Intersection
---------------------------"'--------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
46
Potential Capacity: (pcph)
1312
Movement Capacity: (pcph)
1312
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
WB
RB
----------------------------' -_-----_---
Conflicting Flows: (vph)
----- "'-----
47
Potential Capacity: (pcph)
1628 -
Movement Capacity: (pcph)
1628
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
134
Potential Capacity: (pcph)
928
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
928
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
134
Potential Capacity: (pcph)
886
Major IT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
886
. Intersection Performance Summary
'
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
-------- ------ ------ ------
(veh)
(sec/veh)
-------
SB L 15 886 >
------- -----
---------
SB T 0 928 > 886 4.1
0.0 A
4.1
SB R 0 1312 >
EB L 0 1628 2.2
0.0 A
0.0
Intersection Delay .
0.4 sec/veh
Page 2
s
I
Center For
Microcomputers In Transportation
Center For Microcomputers
In Transportation
'
HCS: Unsignalized Intersection
Release 2.1
Page 1
HCS: Unsignalized Intersection Release 2.1
Page
2
YYM#YYYYYYYYYYYYY#YYYYYY#YYYYYYYYYY###YYY#YiYYXYiY###YYSYYYY#YYY
YYYYY#YXXX#YYYYY##YYYY#YX##YYYYY Y #.KXiY#YY#####YYY#YY#Y#XX
XX#
File Name ................
Streets: (N-S) cr13
(E-W)
douglas
Major Street Direction....
EW
WorkSheet for TWSC Intersection
Length of Time Analyzed...
60 (min)
--------------------------------------------------------
Analyst...................
njd
Step 1: RT from Minor Street
NB
SB
Date of Analysis..........
Other Information.........
7/14/96
1996 2000 2015 am
pm
--------------------------------------------------------
Conflicting Flows: (vph)
149
120
Potential Capacity: (pcph)
1164
1204
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1164
1204
--------=-----------------------
Prob. of Queue -free State:
0.99
0.99
' Eastbound
Westbound ; Northbound ; Southbound
--------------------------------------------------------
L T
R; L T R; L T
R; L T
R
Step 2: LT from Major Street
W8
EB
�---- ---- ----
:---- ---- ---- I ---- ----
----i---- ---- ----
-------------------------------------------------------
No. Lanes ; 0> l<
0; 0> l< 0' 0> l<
0' .0> l<
0
Conflicting Flows: (vph)
151
124
Stop/Yield ;
N; N;
Potential Capacity: (pcph)
1453
1496
Volumes ; 16 147
4; 7 117 7; 7 7
8; 4 4
9
Movement Capacity: (pcph)
1453
1496
PHF .95 .95
.95: .95 .95 .95; .95 .95
.95: .95 .95 .95
Prob. of Queue -free State:
0.99
0.99
Grade ; 0
0 0
0
TH Saturation Flow Rate: (pcphpl)
1700
1700
MC's (X) 1 0 0
01 0 0 0; 0 0
0; 0 0
0
RT Saturation Flow Rate: (pcphpl)
1700
1700
SU/RV's (%); 0 0
0; 0 0 0; 0 0
0; 0 0
0
Major LT Shared Lane Prob.
CV's (:) 0 0
0; 0 0 0; 0 0
0; 0 0
0
of Queue -free State:
0.99
0.99
PCE's 11.1 1.1
1.11 1.1 1.1 1.1; 1.1 1.1
1.1; 1.1 1.1 1.1
--------------------------------------------------------
-------------
Step 3: TH from Minor Street
NB
SB
----=---------------------------------------------------
Conflicting Flows: (vph)
296
294
Potential Capacity: (pcph)
763
765
Adjustment Factors
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Vehicle
Critical
Follow-up
Movement Capacity: (pcph)
748
750
Maneuver
Gap (tg)
Time (tf)
Prob. of Queue -free State:
--------------------------------------------------------
0.99
0.99
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Step 4: LT from Minor Street
NB
SB
Right Turn Minor Road
5.50
2.60
--------------------------------------------------------
Through Traffic Minor Road
6.00
3.30
Conflicting Flows: (vph)
299
300
Left Turn Minor Road
6.50
3.40
Potential Capacity: (pcph)
711
710
Major LT, Minor TH
Impedance Factor:
0.97
0.97
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
'
due to Impeding Movements
0.97
0.97
Movement Capacity: (pcph)
691
688
--------------------------------------------------------
Intersection Performance
Summary
FlowRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------ ------
Delay
LOS
By App
NB L 8 691 >
------------
>
------
>
---------
NB T 8 748 > 833
> 4.5
> A
4.5
NB R 9 1164 >
>
>
S8 L 4 688 >
> -
>
SB T 4 750 > 925
> 4.0
> A
4.0
SB R 10 1204 >
>
>
EB L 19 1496
2.4
A
0.2
WB L 8 1453
2.5
A
0.1
Intersection Delav =
0.7
I
Center For
Microcomputers In Transportation
Center For Microcomputers
Release
In Transportation
2.1
Page 2
HCS- Unsignalized Intersection
Release 2.1
Page 1
HCS: Unsionalized Intersection
File Name ................
(E-W) douglas
! WorkSheet for TWSC Intersection
MaStreets:
StreetSDirection....
EW
Length of Time Analyzed...
60 (min)
---------- ---------------------------------------------
Step 1: RT from Minor Street
NB
SB
Analyst ...................
njd
Date of Analysis..........
7/14/96
--------------------------------------------------------
Conflicting Flows: (vph)
82
110
Other Information.........
1996 2000 2075 am pm
Potential Capacity: (pcph)
1256
1218
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1258
1218
Prob. of Queue -free State:
1.00
0.99
' Eastbound
Westbound Northbound ;
Southbound
--------------------------------------------------------
WB-----------EB
L T
R; L T R; L T - R;
L T
R
Step 2: LT from Major Street------------
-----------------
---- ---- ----1----
No. Lanes i 0> 7<
--------: ---- ---- ----: ----
0; 0> l< 0; 0> 1< 0;
---- ----
0> l<
0
-----------
Conflicting Flows: (vph)
82
111
Stop/Yield ;
N; N; ;
Potential Capacity: (pcph)
1567
1518
Volumes 5 81
1; 8 110 1; 4 3 1;
4 3
12
Movement Capacity: (pcph)
1567
1518
PHF .95 .95 .95:
.95 .95 .95: .95 .95 .95:
.95 .95
.95
Prob. of Queue -free State:
0.99
1.00
Grade ; 0
0 ; 0 1
0
TH Saturation Flow Rate: (pcphpl)
1700
1700
MC's (%) ; 0 0
0; 0 0 0; 0 0 0;
0 0
0
i RT Saturation Flow Rate: (pcphpl)
1700
1700
SU/RV's (%); 0 0
0; 0 0 0; 0 0 0;
0 0
0
Major LT Shared Lane Prob.
CV's (%) 0 0
0; 0 0 0; 0 0 0;
0 0
0
of Queue -free State:
0.99
1.00
PCE's ; 1.1
------------------------------------------------------------------------
Step 3: TH from Minor Street
NS
SB
-----`--------------------------------------------------
Conflicting Flows: (vph)
206
206
Potential Capacity: (pcph)
851
851
Adjustment Factors
-
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99
Vehicle
Critical
Follow-up
Movement Capacity: (pcph)
842
842
Maneuver
Gap (tg)
Time (tf)
Prob. of Queue -free State:
--------------------------------------------------------
1.00
1.00
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Step 4: LT from Minor Street
NB
SB
Right Turn Minor Road
5.50
2.60
--------------------------------------------------------
Through Traffic Minor Road 6.00
3.30
Conflicting Flows: (vph)
212
207
Left Turn Minor Road
6.50
3.40
Potential Capacity: (pcph)
796
803
Major LT, Minor TH
Impedance Factor:
0.99
0.99
Adjusted Impedance Factor:
0.99
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.99
Movement Capacity: (pcph)
780
794
--------------------------------------------------------
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement v(peph) Cm(pcph) Csh(pcph)
•------
Delay
------------
LOS
------
By App
---------
-------- ------ ------
NB L 4 780 >
>
>
NB T 3 - 842 > 843
> 4.3
>
A 4.3
NB. R 1 1258 >
>
>
SB L 4 794 >
>
>
SB T 3 842 > 1045
> 3.5
>
A 3.5
SB R 14 1218 >
>
>
EB L 6 1518
2.4
A
0.1
WB L 9 1567
2.3
A
0.2
Intersection Delay =
0.6
1
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
Yi3X333ii3i333Y3i3333333i333333331i33333333ii33iY33333333333i3i3
File Name ................
Streets: (N-S) shl (E-W) douglas
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... njd
Date of Analysis.......... 7/14/96
Other Information......... 1996 2000 2015 am m
Two-way Stop -controlled Intersection
Northbound , Southbound ; Eastbound Westbound
,
L T R; L T R; L T R; L T R
No. Lanes 1 1 l< 0; 1 1 i; 0> 1 1; 0> l< 0
Stop/Yield ; N; N; ;
Volumes 116 356 114: 19 183 60: 73 39 581 57 70 15
PHF .95 .95 .95; .95 .95 .95: .95 _95 .95: .95 .95 .95
Grade 0 0 0 0
MC's (%) ; 0 0 0; 0 0 0; 0 0 0; 0 0 0
SU/RV's (x); 0 0 0; 0 0 0; 0 0 0; 0 0 0
CV's (%) 0 0 0; 0 0 0; 0 0 0; 0 0 0
PCE's 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1 1.1 1.1
----------------------------------------
Adjustment Factors
Vehicle _ Critical
Maneuver Gap (tg)
----------------------------------------------
Left Turn Major Road 5.00
Right Turn Minor Road 5.50
Through Traffic Minor Road 6.00
Left Turn Minor Road 6.50
Follow-up
Time (tf)
2.10
2.60
3.30
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
i XZYYYiZYYYZZZXXXXZYYXZZXZXY2 Z'fiYiYZZZXYXXXYXiYYYZ2Z2ZZYZZYXiXZY
WorkSheet for TWSC Intersection
Step 1: RT from Minor Street WB
Conflicting Flows:
(vph)
413
Potential Capacity:
(pcph)
855
Movement Capacity:
(pcph)
855
Prob. of Queue -free
State:
0.98
-------------------------------------------
Step 2: LT from Major Street
SB
--------------------------------------- Conflicting Flows:
(vph)
470
Potential Capacity:
(pcph)
1024
Movement Capacity:
(pcph)
1024
Prob_ of Queue -free
State:
0.98
-------------------------------------------
Step 3: TH from Minor Street
WB
----------------------------
Conflicting Flows:
-------------
(vph)
791
Potential Capacity:
(pcph)
419
Capacity Adjustment
Factor
due to Impeding Movements
0.88
Movement Capacity:
(pcph)
368
Prob. of Queue -free
State:
0.78
-------------------------------------------
Step 4: LT from Minor
Street
WB
-------------------------------------------
Conflicting Flows:
(vph)
780
Potential Capacity:
(pcph)
374
Major LT, Minor TH
Impedance Factor:
0.77
Adjusted Impedance
Factor:
0.82
Capacity Adjustment
Factor
due to Impeding Movements
0.77
Movement Capacity:
-------------------------------------------
(pcph)
290
Intersection Performance Summary
EB
183
1118
1118
0.94
N8
243
1313
1313
0.90
EB
788
421
0.88
370
0.88
EB
804
362
0.69
0.76
0.74
268
F1owRate MoveCap SharedCap Avg.Total Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay LOS By App
-------- ------ ------ ------------------ -------------
EB L 85 268 > 296 > 21.6 > 0
EB T 45 370 > > > 16.0
EB R 67 1118 3.4 A
WB L 66 290 > > >
WB T 81 368 > 352 > 19.2 > C 19.2
WS R 18 855 > > >
NB L 134 1313 3.1 A 0.6
SB L 22 1024 3.6 A 0.3
Intersection Delay = 5.1
Center For
Microcomputers
In Transportation
Center For Microcomputers
In Transportation
2.1
Page 2
HCS: Unsignalized Intersection Release
2.1 Page 1
HCS: Unsignalized Intersection Release
ZXiXZYXiZY#XZYiXiZXZXiiiiiXXZXXXXXiXXYXXZ X.�.X XXiXXZXXZXiXXYii#YX#
Yi#ZiiiXXZZXYX i
#iiXXYXX XYYX#ZZXYiXZZiXXXXXiZ#iXXZZZY
File Name ................
Streets: (N-S) shi
(E-W) douglas
WorkSheet for TWSC Intersection
Major Street Direction....
NS
Length of Time Analyzed...
60 (min)
-
---'--'-----------------------------------------------
Step 1: RT from Minor Street
WB
ES
Analyst ...................
njd
Date of Analysis..........
Other Information.........
7/14/96
1996 2000
2015 am pal
--------------------------------------------------------
Conflicting Flows: (vph)
Potential Capacity: (pcph)
120
1204
325
948
Two-way Stop -controlled
Intersection
Movement Capacity: (pcph)
1204
0.99
948
Prob. of Queue -free State:
' Northbound
; Southbound
Eastbound ;
Westbound
----- ----------'----------------"'----------
Step 2: LT from Major Street
---'---0_89
SB
N8
L T
R; L T
R; L T R;
L T
R
---_----
--
---- --------
i ---- -------N;----
1 1
--------i----
1; 0> 1 1;
---- ----
0> l<
0
--------------------------'-------------
Conflicting Flows: (vph)
138
381
No. Lanes ; 1 14
0;
N;
Potential Capacity: (pcph)
1473
1129
Stop/Yield ;
Volumes 30 101
37: 18 325
,
56; 36 60 941
101 30
7
Movement Capacity: (pcph)
1473
1129
0.97
PHF .95 .95
.95: .95 .95
.95: .95 .95 .95;
.95 .95
.95 !
Prob. of Queue -free State:
0.99
Grade0
0
0
0: 0 0
0
0; 0 0;
0
0 0
0
--------------------------------------------------------
Step 3: TH from Minor Street
WB
EB
MC's (%) 0
SU/RV's C%)i 0 0
0� 0 0
0 0
.0
01 0 0 0�
0; 0 0 0;
0 0
0 0
0
0
----------- _------ _----- _____________________________
Conflicting Flows: (vph)
___
548
511
CV's (%) 0 0
PCE's 1.1 1.1
0;
Potential Capacity: (pcph)
563
588
Capacity Adjustment Factor
--------------------------'--------------------------------------------
due to Impeding Movements
0.96
0.96
Movement Capacity: (pcph)
538
562
_
Prob. of Queue -free State:
0.93
0.88
Adjustment Factors
--------------------------------------------------------
Step 4: LT from Minor Street
WS
EB
Vehicle
Critical
Gap (t9)
Follow-up
Time (tf)
--------------------------------------------------------
Conflicting Flows: (vph)
570
539
Maneuver
Potential Capacity: (pcph)
495
516
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
2.60
Major LT. Minor TH
Impedance Factor:
0.84
0.89
Right Turn Minor Road
Road
5.50
6.00
3.30
Adjusted Impedance Factor:
0.88
0.92
Through Traffic Minor
Left Turn Minor Road
6.50
3.40
Capacity Adjustment Factor
due to Impeding Movements
0.77
0.91
Movement Capacity: (pcph)
--------------------------------------------------------
384
471
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
'
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------ ------
Delay
LOS
By App
EB L 42 471 > 524
------------
> 8.7
------
>
-------
8
EB T 69 562 >
>
>
6.7
EB R 109 948
4.3
A
WB L 117 384 >
>
>
WB T 35 538 > 425
> 13.6
>
C 13.6
WB R 8 1204 >
>
>
NB L 35 1129
3.3
A
0.6
SO L 21 1473
2.5
A
0.1
Intersection Delay =
3.7
APPENDIX D
RCS: Unsignalized Intersections Release 2.1c Page
aavaas..........a...vv....a....a.........=...........ov..ay.va.a......
Center For Microcamputera In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
...... ..v.va.a...............................v vvv a......v.v vv v........
Streets: (N-S) SITE ROAD (S-W) DOUGLAS
Major Street Direction.... HW
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 7 96
Other Information........ 000 2015 PM
Two-way Stop -controlled Intersection
............ v...... aa..... v............................................
LEaetboundR I LWeathoundR I LNorthboundd I LSouthboundd
No. Lanes 1 0 1 1 1 0 > 1 0 1 1 0 1 1 0 0 0
Stop/Yield
Volumes
PRF
Grade
MCI M
SU/RV,D M
CV'e M
VICE Ia
------------
Y
46 21
.95 .95
0
----------------
6 36
.95 .95
0
1.10
N
61 18
.95 .95
0
11.10 1.101
-------------------------------
Adjustment Factors
vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
RCS: Unsignalized Intersections Release 2.1c Page 2
..vvvavaevevvavvvvvavvvvvvvva......ae...................vv............
Worksheet for TWSC Intersection
--------------------------------------------------------
Stop 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
48
Potential Capacity: (pcph)
1309
Movement Capacity: (pcph)
1309
Prob. of Queue -Free State:
0.98
--------------------------------------------------------
Step 2: LT from Major Street------------
9------------HB
Conflicting Flows: (vph)
48
Potential Capacity: (pcph)
1626
Movement Capacity: (pcph)
1626
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
-------- -----------------------------------------------
Step 4: IT from Minor Street
NB SB
--------------------------------------------------------
Conflicting Flows: (vph)
92
Potential Capacity: (pcph)
937
Major LT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
'
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
933
Intersection Performance Summary
Flow Move
Rate Cap
Movement (pcph) (pcph)
-------- ------ ------
NB L 70 933
NB R 21 1309
Avg. 95%
Shared Total Queue Approach
Cap Delay Length LOS Delay
(pcph)(Dec/veh) (veh) (Dec/veh)
------ ------- ------- --------------
4.2 0.2 A
3.9
2.8
WS L 7 1626 2.2
0.0 A
0.0 A 0.3
Intersection Delay v 1.7 sec/veh
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1
Page 1
iiYZYYiiiYZZYYYYYZiYYYYiYiYYZiZYiKiiiiiYiZiYYZYZZYZZYZiiiiYiYZZZ
SC3: Uneignalizad Intersections Release 2.1c
Page
1
File Name ................
v....v.s.....a..sv.a.s..v.ay.....vvv.vv.............. ................
Streets: (N-S) lemay (E-W) country club
Center For Microcomputers In Transportation
Analyst ................... mid
University of Florida
Date of Analysis.......... 7/14/96
Other Information......... 1996 2000 2015
am pm
512 Wail Hall
I Gainesville, FL 32611-2083
Ph: (904) 392-0378
All -way Stop -controlled Intersection
vav vvu.asannaay.aavvv.vvvavv uavv..v uanvavaas vavn..assnvv.vvvv.v.
_ (R-W) COUNTRY CLUB
Streets: (N S)
Eastbound- ; Westbound ; Northbound ;
Southbound
................... MD
" '* *
L T R; L T R; L
�---- ---- ----i ---- ---- ----' ---- ----
T R; L T
---- :---- ----
R
----
Daalyet
Date of Aaaly*is.......... 7/4/96
Other Information.........1996 000 2015
AM PM
No. Lanes ; 0> l< 0; 0> l< 0; 0>
l< 0;
0> l<
0
All -way Stop -controlled Intersect
Volumes ; 77 42 5; 104 42 a; 33
64 35;
17 138
5
PHF ;
.95
aa.avaa.va.va.aaaa.v.avaaavvavnnevs.sna................................
.95 .95 .95; .95 .95 .95; .95
0
.95 .95;
0
.95 .95
0
Eastbound
Westbound
Northbound
Southbound
Grade 0
;
L T R
L T
L
T R
L T
R
MC's (%) .; 0 0 0; 0 0 0; 0
0 0;
0 0
0
---- --- ----
---- ---- ----
-
----
--- ----
SU/RV's (%); 0 0 0; 0 0 0; 0
0 0;
0 0
0
aaee
0 T_'_;
170� 044
072� 155� 023
062�
TV;
----
0
180<
0
CV's (%) 0 . 0 0; 0 0 0; 0
0 0;
0 0
0
Volumes
8�
148� 129
9>
3
PCE's ; 1.1 1.1 1.1; 1.1 1.1 1.1; 1.1
------------------------------------------------------------------------
1.1 1.1;
1.1 1.1
1.1
PHF
.95 .95 .95
.95 .95 .95
.95
.95 .95
.95 .95 .95
---------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------------
-----------------------------------------------------------------------
EB
W8
NO
SB
RB
-----------------------------------------------------------------------
WB
NB
SB
- ----------------------------------------------------------------------
LT Flow Rate 81
109
35
18
LT Flow Rate 8
76
65
9
RT Flow Rate 5
4
37
.5
RT Flow Rate 46
24
136
3
Approach Flow Rate 130
157
139
168
Approach Flow Rate 128
158
357
96
Proportion LT 0.62
0.69
0.25
0.11
Proportion IT 0.06
0.48
0.18
0.09
Proportion RT 0.04
0.03
0.27
0.03
Proportion RT 0.36
0.15
0.38
0.03
Opposing Approach Flow Rate 157
130
168
139
Opposing Approach Flow Rate 158
128
96
357
Conflicting Approaches Flow Rate 307
307
287
287
Conflicting Approaches Flow Rate 453
453
286
286
Proportion, Subject Approach Flow Rate 0.22
0.26
0.23
0.28
Proportion, Subject Approach Flow Rate 0.17
0.21
0.48
0.13
Proportion, Opposing Approach Flow Rate 0.26
0.22
0.28
0.23
Proportion, Opposing Approach Flow Rate 0.21
0.17
0.13
0.48
Lanes on Subject Approach 1
1
1
1
Lanes on Subject Approach 1
1
1
1
Lanes on Opposing Approach 1
1
1
1
Lanes on Opposing Approach 1
1
1
1
LT, Opposing Approach 109
81
16
35
LT, Opposing Approach 76
8
9
65
RT, Opposing Approach 4
5
5
37
RT, Opposing Approach 24
46
3
136
LT, Conflicting Approaches 53
53
190
190
LT, Conflicting Approaches 74
74
84
84
RT, Conflicting Approaches 42
42
9
9
RT, Conflicting Approaches 139
139
70
70
Proportion LT, Opposing Approach 0.69
0.62
0.11
0.25
Proportion LT, Opposing Approach 0.48
0.06
0.09
0.18
Proportion RT, Opposing Approach 0.03
0.04
0.03
0.27
Proportion RT, Opposing Approach 0.15
0.36
0.03
0.38
Proportion LT, Conflicting Approaches 0.17
0.17
0.66
0.66
! Proportion IT, Conflicting Approaches 0.16
0.16
0.29
0.29
Proportion RT, Conflicting Approaches 0.14
0.14
0.03
0.03
Proportion RT, Conflicting Approaches 0.31
0.31
0.24
0.24
Approach Capacity 290
-----------------------------------------------------------------------
328
317
335
Approach Capacity 352
-----------------------------------------------------------------------
531
637
575
Intersection Performance Summary
Intersection Performance Summary
Approach Approach V/C
Average
Movement Flow Rate Capacity Ratio
Total Delay
LOS
Approach Approach V/C
Average
---------- --------------------------
-----------
----
Movement Flow Rate Capacity Ratio
Total Delay
LOS
EB 130 290 0.45
5.5
B
---------- ---------- ----------------
-----------
----
WB 157 328 0.48
6.2
B
RB 128 352 0.36
4.0
A
NO 139 317 0.44
5.3
B
WB 158 531 0.30
3.1
A
SB 168 335 0.50
6.7
B
NB 357 637 0.56
8.4
B
SB 96 575 0.17
1.9
A
Intersection Delay = 5.98
Level of Service (Intersection) =. B
Intersection Delay 5.7
Leval of Service (Intersection)
. B
HCS: Unsignalized Intersections Release 2.1c Page
iaaenvu.aeoay.v..asswv.aasvavva.uvavnaavasa.anauv vasn.........
Center For Microcomputers In Transportation
University of Florida
512 Weil Ball
Gainesville, FL 32611-2083
Ph: (904) 392-0378
.aae.a.u.oun.a.a.s.ay..=.=..a.uovv............asvevvvaaaaeaeayswa
Streets: (N-S) ABBOTSFORD (E-W) GREGORY 4WEL
Major Street Direction.... RN
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 7/4/96
Other Information......... 1996 2000 2015 AM
Two-way Stop -controlled Intersection
.a.vvv....avavaaavvsavanavv...avwwvavasvvnsana...... n................
Eastbound Westbound Northbound Southbound
L T R I L T R I L T R I L T R
No. Lanes 1 0 > 1 0 1 0 1 < 0 1 0 0 0 1 0 > 1 < 0
Stop/Yield
volumes
PEP
Grade
MC'a (!)
SD/Rv's M
CV' a M
PCE'a
------------
1 45
.95 .95
0
1.10
------
N
92 30
.95 .95
0
22 0 1
95 .95 .95
0
1 11.10 1.10 1.10
-------- ------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
BCS: Unsignalized Intersections Release 2.1c Page 2
................ a .............................. v.......................
Workshest for TWSC Intersection
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
113
Potential Capacity: (pcph)
1214
Movement Capacity: (pcph)
1214
Prob. of queue -Free State:
1.00
------- ------------------------------------------------
Step 2: IT from Major Street
------------
WBEB
-----------
-----------------------
Conflicting Flows: (vph)
129
Potential Capacity: (pcph)
1488
Movement Capacity: (peph)
1488
Prob. of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
161
Potential Capacity: (pcph)
898
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
897
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
-SB
--------------------------------------------------------
Conflicting Flows: (vph)
161
Potential Capacity: (pcph)
854
Major IT, Minor TH
Impedance Factor: _
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
853
Intersection Performance Summary
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh)
-------- ------ ------ ------
(veh)
(sec/veh)
-------
SB L 25 853 >
-------
----- ---------
SB T 0 897 > 863 4.3
0.0
A 4.3
SB R 1 1214 >
EB L 1 1488 2.4
0.0
A 0.1
Intersection Delay =
0.5 sec/veh
1
HCS: Unsignalized Intersections Release 2.1c Page
vvavvavvvvvvvmvaavvvvavaavmvvvvavvanaamavvvvvavvvmvvvuvanvvavavvva.
Center For Microcomputers In Transportation
University of Florida
512 Weil Sell
Gainesville, PL 32611-2083
Ph: (904) 392-0378
maaavvvvvuvavvaavvvvavvvaaovavvamavavaaavvvvvvvvavaovavvvavavvvvevam
Streets: (N-S) ABBOTSFORD (S-W) GREGORY 0SM
Major Street Direction.... SW
Length of Time Analyzed... 60 (min)
Analyst ................... NO
Date of Analysis.......... 7/4/96
other Information ....... ..1996 2000 2015 FM
Two-way Stop -controlled Intersect
vvavavvvvvvvvevvvvavvavvvavvvaaaavaaavaaaavvmmaavvvaavavaaaavavaaaeavm
ml LBastboundR I LWestboundR I LNorthbound I LSouthboundd
No. Lanes 1 0 > 1 0 1 0 1 < 0 1 0 0 0 1 0 > 1 < 0
Stop/Yield
Volumes
PHP
Grade
MCI ($)
SU/RV's ($)
CV' a ($)
PCB-s
------------
N
0 64
.95 .95
0
1.10
Adjustment Factors
29 0 0
.95 .95 .95
0
1.10 1.10 1.10
---------------
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Dnsi lized Intersections Release 2.1c Page 2
9� g
vvesmassvmmvvvvmvvavavavmaavvvevvvvevmvvvvvvvvaavevavvavaavavvavavvavvv
Worksheet for TWSC Intersection
--------------------------------------------------------
Stop 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
40
Potential Capacity: (pcph)
1321
Movement Capacity: (pcph)
1321
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 2: LT from Major Street
WB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
44
Potential Capacity: (pcph)
1633
Movement Capacity: (pcph)
1633
Prob.- of Queue -Free State:
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major IT Shared Lane Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
107
Potential Capacity: (pcph)
959
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
959
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
'--------------------------------------------------------
NB
SB
Conflicting Flows: (vph)
107
Potential Capacity: (pcph)
918
Major IT, Minor TH
Impedance Factor:
1.00
Adjusted Impedance Factor:
1.00
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
918
Intersection Performance Summary
Avg. 95$
Flow Move Shared
Total Queue
Approach
Rate Cap Cap
Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (vah)
-------- ------ ------
(sec/veh)
------
SB L 34 918 >
------- -------
----- ---------
SB T 0 959 > 918
4.1 0.0
A 4.1
SB R 0 1321 >
BE L 0 1633
2.2 0.0
A 0.0
Intersection Delay a 0.9 sec/veh
r.7
F---� r-- 1
r-
r-� ram:. ram;
Center For. Microcomputers
In Transportation
Center For
Microcomputers In Transportation
Page 1
HCS: Unsignalized Intersection Release 2.1
Pape 2
HCS: Unsignalized Intersection Release 2.1
:Y:X=YXY#=#=Y:2#2YYYYYXYYY##2YX#=#X#2:YYY:22:X=XXXYY#2X=::2Y:SY=
Y Y2YYXYYY###2#YYS##=2#YY22SY2YSSYYXX=XXSX22#=Y22YYYY#XYX2S###Y2Y
File Name ................
Streets: (N-S) cr13
(E-W)
doualas
for TWSC Intersection
Major Street Direction....
EW
----Sheet
-----------------------------------------------------
Analyzed...
Length of Time A
60 (min)
Step 1: RT from Minor Street
NB
SB
Analyst....me
.........
njd
--------------------------------------------------------
Date of Analysis..........
7/14/96 2015
am
Conflicting Flows: (vph)
98
78
Other Information .........
am
1996 Q_12�
Potential Capacity: (pcph)
1,.35
1264
Movement Capacity: (pcph)
1235
1264
Two-way Stop -controlled
Intersection
Prob. of Queue -free State:
0.99
---
' Eastbound
; Westbound ; Northbound ; Southbound
-------------------------------------------------
Step 2: LT from Major Street
WB
----
EB
L T
R; L T R; L T
R; L T
R
---- ---- ----
: ---- ---- ---- ---- ----
----I---- ---- --
Conflicting Flows: (vph)
81
No. Lanes 0> 1<
0, 0> l< 0; 0> 1<
0; 0> l<
0
Potential Capacity: (pcph)
1536 536
1569
Stop/Yield ;
N; N;
Movement Capacity: (pcph)
Volumes ; 13 97
3; 16 76 5; 5 5
27; 3 3
7
Prob. of Queue -free State:
0.99
0.99
PHF ; .95 .95
.95; .95 .95 .95; .95 .95
.95; .95 .95 .95
TH Saturation Flow Rate: (pcphpl)
1700
1700
170D
1700
Grad
Grade ; 0
; 0 ; 0
; p
RT Saturation Flow Rate: (pcphpl)
1700
1700
(%) ; 0 0
MC'sMajor
0; 0 0 0; 0 0
0; 0 0
0
LT Shared Lane Prob.
SU/RV's (X); 0 0
0; 0 0 0; 0 0
0; 0 0
0
of Queue -free State:
0.99
CV's (%) ; 0 0
0; 0 0 0; 0 0
0; 0 0
0
-----------------------------------------------------
---
PCE's ; 1.1 1.1
--------------------------------------------
1.1; 1.1 1.1 1.1; 1.1 1.1
____________________________
1.1; 1.1 1.1 1.1
Step 3: TH from Minor Street
N8
SB
- Conflicting Flows: (vph)
208
208
Potential Capacity: (pcph)
848
848
Capacity Adjustment Factor
Adjustment Factors
due to Impeding Movements
_0.98
0.98
Vehicle
Critical
Follow-up
Movement Capacity: (pcph)
828
628
Maneuver
Gap (tg)
Time (tf)
Prob. of Queue -free State:
--------------------------- -----------------------------
0.99
1.00
Left Turn Major Road
5.00
2.10
Step 4: LT from Minor Street
--------------------------------------------------------
NS
SB
Right Turn Minor Road
5.50
2.60
Conflicting Flows: (vph)
211
Through Traffic Minor Road
6.00
3.30
Potential Capacity: (pcph)
799
9S
788
88
Left Turn Minor Road
6.50
3.40
Major LT, Minor TH
Impedance Factor:
0.97
0-97
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.95
Movement Capacity: (pcph)
778
750
________________________________________________________
Intersection Performance Summary
FlowRate MoveCap SharedCap
Avg.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------ ------
Delay
LOS
By App
NB L 6 778 >
------------
>
------
>
________-
NB T 6 828 > 1073
> 3.5
>
A 3.5
NB R 31 1235 >
>
>
SB L 3 750 >
>
>
S8 T 3 828 > 1003
> 3.6
>
A 3.6
SB R 8 1264 >
>
>
EB -L 15 1569
2.3
A
- 0.3
WB L 19 1536
2.4
A
0.4
Intersection Delay =
0.9
HCS: unsignalized Intersections Release 2.1c Page
mvavavavaavnavaavavvvaavvvaavv.v...aavva.v.a.v.aavvm ovv naava.........
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
a vsay.vaa uavv.va.vv...vnavaavaavanavv.a.vvvavvaa..vv.a.vaavvvvnavnavv
Streets: (N-S) CR 13 (E-W) DOUGLAS
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... NO
Date of Analysis.......... 7/4/96
Other Information ......... 1996 00 2015 PM
Two-way Stop -controlled Intersection-
avv.aava.vaa. aay.aa. vaav.............. ...... =................ a......
a Eastbound Weathound Northbound Southbound
L T R I L T R I L T R I L T R
No. Lanes I 0 > 1 < 0 10 > 1 < 0 10 > 1 < 0 10 > 1 < 0
Stop/Yield
Volumes
PEP
Grade
MCI M
SU/RV's M
CV's (E)
PCE10
N
4 56 0
.95 .95 .95
0
1.10
---------------
24
.95
1.10
N
72 - 1
.95 .95
0
3 2 7
.95 .95 .95
0
4 2 9
.95 .95 .95
0
11.10 1.10 1.1011.10 1.10 1.10
------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
HCS: Dnsignalized Intersections Release 2.1c Page 2
vvmavvvvvvvvemavvvn..avvv.m.ay.v.a...vv..............................
Worksheat for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph)
59
76
Potential Capacity: (pcph)
1293
1267
Movement Capacity: (pcph)
1293
1267
Prob. of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
59
77
Potential Capacity: (pcph)
1607
1575
Movement Capacity: (pcph)
1607
1575
Prob. of Queue -Free State:
0.98
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major IT Shared Lane Prob.
of Queue -Free State:
0.98
1.00
--------------------------------------------------------
Step 3: TH from Minor Street
NB
SE
--------------------------------------------------------
Conflicting Flows: (vph)
165
164
Potential Capacity: (pcph)
894
895
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Movement Capacity: (pcph)
875
876
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: IT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph)
170
169
Potential Capacity: (pcph)
844
845
Major LT, Minor TH
Impedance Factor:
0.98
0.98
Adjusted Impedance Factor:
0.98
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.97
0.98
Movement Capacity: (pcph)
823
825
--------------------------------------------------------
Intersection Performance Summary
Avg.
9s%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (poph)(sec/veh) (vah)
(sec/veh)
-------- ------ ------ ------ -------
NB L 3 823 >
-------
----- ---------
NB T 2 875 > 1073 3.4
0.0
A 3.4
NB R 8 1293 >
SB L 4 825 >
SB T 2 876 > 1065 3.4
0.0
A 3.4
SB R 10 1267 >
EB L 4 1575 2.3
0.0
A 0.2
WE L 28 1607 2.3
.0.0
A 0.6
Intersection Delay .
0.8 sec/veh
Center For Microcomputers In Transportation
HCS: Unsia_nalized Intersection Release 2.1 Page 2
XXXXX(X#XX#XXYXX##YX##XXXXXXX##ZXXX#ZXXXXX#Y#ZZZXZZ.X XXX#XZXY#XX#
Work$heet for TWSC Intersection
Center For
Microcomputers In Transportation
--------------------------------------------------------
HCS: Unsignalized Intersection
Release 2.1
Page 1
Step 1: RT from Minor Street
WB
EB
Y YZYZYYYY Z Z YYZZYZY#ZXiZZZZZZZZZZYZZZZYZXZZYYZYYYYYYYY
Y
Conflicting Flows: (vph)
96
260
File Name ................
Potential Capacity: (pcph)
1238
1022
Streets: (N-S) shl
(E-W) douglas
Movement Capacity: (pcph)
1238
1022
Major Street Direction....
NS
Prob. of Queue -free State:
1.00
0.91
Length of Time Analyzed...
60 (min)
--------------------------------------------------------
Analyst...................
njd
Step 2: LT from Major Street
SB
NB
Date of Analysis..........
Other Information.........
7/14/96
1996 000 2015
am pm
--------------------------------------------------------
Conflicting Flows: (vph)
ill
305
Potential Capacity: (pcph)
1518
1227
Two-way Stop -controlled
Intersection
-
Movement Capacity: (pcph)
1518
1227
Prob. of Queue -free State:
0.99
0.98
Northbound
; Southbound Eastbound ;
Westbound
--------------------------------------------------------
L T
R; L T R; L
T R;
L T
R
Step 3: TH from Minor Street
W8
EB
---- ---- ----
: ---- ---- ---- I ----
---- ----: ---- ---- ----
--------------------------------------------------------
No. Lanes 1 l<
0; 1 1 1; 0>
1 1;
0> 1<
0
Conflicting Flows: (vph)
436
406
Stop/Yield '
N: N;
i
-
Potential Capacity: (pcph)
644
668
Volumes 23 81
30: 12 260 45; 29
46 75:
78 21
4
Capacity Adjustment Factor
PHF .95 .95
.95: .95 .95 .95: .95
.95 .95:
.95 .95 .95
due to Impeding Movements
0.97
0.97
Grade ; 0
; 0 ;
0 ;
0
Movement Capacity: (pcph)
625
648
MC's (%) 0 0
01 0 0 0; 0
0 0;
0 0
0
Prob. of Queue -free State:
0.96
0.91
SU/RV's (%): 0 0
0{ 0 0 0: 0
0 0:
0 0
0
--------------------------------------------------------
CV's (%) 1 0 0
0; 0 0 0; 0
0 0;
0 0
0
Step 4: LT from Minor Street
WB
EB
PCE's ; 1.1 1.1
1.1; 1.1 1.1 1.1( 1.1
1.1 1.1;
1.1 1.1 1.1
--------------------------------------------------------
------------------------------------------------------------------------
Conflicting Flows: (vph)
452
426
Potential Capacity: (pcph)
580
600
Major LT, Minor TH
Impedance Factor:
0.89
0.93
-
Adjustment Factors
Adjusted Impedance Factor:
0.91
0.95
Capacity Adjustment Factor
Vehicle -
Critical
Follow-up
due to Impeding Movements
0.83
0.95
Maneuver _
Gap (tg)
Time (tf)
Movement Capacity: (pcph)
--------------------------------------------------------
484
567
------------------------------------------------------------------
Left Turn Major -Road
5.00
2.10
Intersection Performance Summary
Right Turn Minor Road
5.50
2.60
-
Through Traffic Minor Road
6.00
3.30
F1owRate MoveCap SharedCap
Avg -Total-
Delay
Left Turn Minor Road
6.50
-
3.40
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------
Delay
LOS
By App
------
EB L 34 567 > 615
------------
> 6.9
------
> 6
---------
EB T 56 648 >
> -
>
5.5
EB R 87 1022
3.9
A
WB L 90 484 >
>
>
WB T 24 625 > 518
> 9.0
> B
9.0
WB R 4 1238 >
>
->
NB L 26 1227
3.0
A
0.5
-
SB L 14 1518
2.4
A
0.1
.
'�
Intersection Delay =
.2.6
APPENDIX C
1
-
Center For Microcomputers
In Transportation
-
HCS: Unsienalized Intersection Release
2.1
Page
1
EC3: Dnsignalized Intersections Release 2.1c
Page
uvu.................................................................
File Name .............
-
Center For Microcomputers In Transportation
Streets: (N-S) lemay
(E-W) country
club.
University of Florida -
Analyst ................... mjd
512 Weil Ball
Gainesville, FL 32611-2083
Date of Analysis.......... 7/14/96
Other Information......... 7996 2000
2015
am pm
Ph: (904) 392-0378
...................................................................
All -way Stop -controlled Intersection
Streets: (N-S) LEMAY (B-W) COUNTRY CLUB
Analyst ................... MD
; Eastbound Westbound
; Northbound '
Southbound
Date of. Analysis.......... 7 96
Other Information ....... 1996 2000 2015
® PM
L T R; L T
�---- --------: ---- ---- - ---:----
R, L
----
T R,
----:----
L
----
T R
----
All-way Stop -controlled Intersection
No. Lanes 0> l< 0; 0> l<
0; 0>
l< 0;
0>
l< 0
.......................................................................
Volumes 4 65 41: 67 51
17: 57
1-6 121;
7
67 2
Eastbound
Westbound
Northbound
Southbound
PHF .95 .95 .95: .95 .95 .95:
.95
.95 .95; .95
.95
.95
L T R
L T . R
L
T R
L T
R -
Grade ; 0 0
0 ;
0 .
____ ____ ____
____
____ ____
____ ____
____
•MC's (.) 0 0 0; 0 0
0; 0
0 01
0
.0 0
No. Lanes
T___
0> 1 < 0
0> 1 < 0
0>
1 < 0
0.> 1
< 0
SU/RV's (%); 0 0 0; 0 0
0; 0
0 0;
0
0 0
Volumes
4 39 72
97 39 3
31"
55 32
13 116 4
CV's (%) 0 0 0; 0 0
0; 0
0 0;
0
0 0
PEP
.95 .95 .95
.95 .95 .95
.95
.95 .95
.95 .95 .95
PCE's 1.1 1.1 t. 1; 1.1
------------------------------------------------------------------------
-----------------------------------------------------------------------
Volume Summary and Capacity Analysis WorkSheet
-----------------------------------------------------------------------
i
-'--'-----------'--'--'-----------------------------------------------
Volume Summary and Capacity Analysis
WorkSheet
BB
WB
NB
SB
-----------------------------------------------------------------------
EB
W8
NB
58
LT Flow Rate 4
102
33
14
LT Flow Rate
4
71
60
7 -
RT Flow Rate 76
3
34
4
RT Flow Rate
43
18
127
2
Approach Flow Rate 121
146
125
140
Approach Flow Rate
115
143
320
80
Proportion IT 0.03
0.70
0.26
0.10
Proportion LT
0.03
0.50
0.19
0.09
Proportion RT 0.63
0.02
0.27
0.03
Proportion RT
0.37
0.13
0.40
0.03
Opposing Approach Flow Rate 146
121
140
125
Opposing Approach Flow Rate
143
115
80
320
Conflicting Approaches Flow Rate 265
265
267
267
Conflicting Approaches Flow Rate
400
400
258
258
Proportion, Subject Approach Flow Rate 0.23
0.27
0.23
0.26
,proportion, Subject Approach Flow Rate
0.11
0.22
0.49
0.12
Proportion, Opposing Approach Plow Rate 0.2
0.23
0.2
0.23
proportion, Opposing Approach Flow Rate
0.22
0.17
0.12
0.49
1
Lanes on Subject Approach- 1
1
1
1
"1
Lanes on Subject Approach ".
"1
1 -
1
- 1 -
Lases on Opposing Approach 1
1
1
1
Lanes on Opposing Approach
1
"1
1
_1
IT, Opposing Approach 102
-
4
14
33
LT, A
Opposing Approach "
71
4
7.
60
RT, Opposing Approach 3
76
4
34
RT, Opposing Approach
18
43
2:
127
IT, Conflicting Approaches 47
47
106
106
LT, 'C onflicting Approaches
67
67
75
75
..RT, Conflicting Approaches 38
38
79
79
RT, Conflicting Approaches
129
129
61
61
Proportion IT, Opposing Approach 0.70
0.03
0.10
0.26
Proportion LT, Opposing Approach
0.50
0.03
0.09
0.19
Proportion RT, Opposing Approach "0.02
0.63
0.03
0.27
Proportion RT, Opposing Approach
- 0.13
0.37
0.03
0.40
Proportion IT, Conflicting Approaches 0.18
0.18
0.40
0.40
proportion LT, Conflicting Approaches
0.17
0.17
0.29
0.29
Proportion RT, Conflicting Approaches 0.14
0.14
0.30
0.30
Proportion RT, Conflicting Approaches
0.32
0.32
0.24
0.24
Approach Capacity 304
639
465
472
Approach Capacity
350
557634
569
" Intersection Performance Summary
_
Intersection Performance Summary
• Approach Approach V/C
- Average
-
". Approach Approach
V/C
Average
--Delay
_-
Movement _Flow Rate. Capacity Ratio
Total Delay
_
LOS
-Movement_ -Flow-Rate _Capacity
__
Ratio-
Total
LOS-
---------- ---------- ----------___---
- -- -
BB 121 304 0.40
-----------
4.5
----
. A
I
ES 115. 350
0.33
- 3.5
-
A
WB - 146 639 0.23
2.4
A
I
WB -143 551
0.26
2.7
A
'. N8 125 465 0.27
- 2.8
A
NB 320 634
0.50
6.8
B
SB 140 472 " -0.30
3.1
A, -
I
SS 80 569
0.14
1.7
A
Intersection Delay 3.2
Intersection Delay =
.4 .71
- Level of Service (Intersection) . A -
_ - Level of Service (Intersection) = A -
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 1
z xXzxXzzzzzzzxzxzxx#xXxzxxxxizxxxxzzzzxxxxxzxxzzzzxzxz'czxzxxxxzz
F.ile.Name .................
Streets: (N-S) abbotsford (E-W) gregory
Major Street Direction.... EW
Length.of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis.......... 4196
Other Information......... 1996 2000 2015 am pm
Two-way Stop -controlled Intersection
Eastbound Westbound Northbound Southbound
,
L T R; L- T R; L T R; L T R
,
No. Lanes 0> 1 0; 0 1< 0; 0 0 0; 0> 0< 0
Stop/Yield N; N;
Volumes -1 42 86 9; 10 1
PHF -; .95 .95 ...95 .95; .95 .95
Grade 0 0 t 0 0
SU/RV's (%); 0 0 0 0; 0 0
CV's (%) 0 0 ; 0 0; 0 0
PCE's 1.1 1.1 1.1 1.1; 1.1 1.1
Adjustment Factors
Vehicle_
- Critical
Follow-up
Maneuver
Gap (tg)
Time (tf).
__________________________________________________________________
Left Turn Major
Road
5.00
2.10
Right Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1 Page 2
Xi.F XZXZZX#XXXX#XXXiX#X#XZXZXXXXXX#iXXFiZ.FXXXXXXXi#iXXiXFX##XXXXX
WorkSheet for TWSC Intersection
Step,l: RT from Minor Street NB SB
Conflicting Flows: (vph) -
90
Potential Capacity: (pcph)
1247
Movement Capacity: (pcph)
1247
Prob. of Queue -free State:
--------------------------------------------------------
Step 2: LT from Major Street
WS
EB
________________________________________________________
Conflicting Flows: (vph) -
95
Potential Capacity: (pcph) -
1545
Movement Capacity: (pcph)
1545
Grob. of Queue -free State: -
1.00
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
.
of Queue -free State:
1.00
--------------------------------------------------------
Step 4: LT from Minor Street
NB
SB
--------------------------------------------------------
Conflicting Flows: (vph) -
134
Potential Caoacity: (pcph)
886
Major LT. Minor TH -
Impedance Factor:
1..00
Adjusted Impedance Factor:
1.00-
-
Capacity Adjustment Factor _
-
-
due to Impeding Movements
1.00
Movement Capacity: (pcph)
--------------------------------------------------------
885
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg -Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph)
-------- ------ ------ ------
Delay
------------
LOS
By App
SB L 12 885 >
>
------
>
---------
- 905
4.0
A
.4.0
SB R 1 1247 >
>
_
EB L 1 1545
2.3
A
0.1
Intersection Delay =
0.3
RCS: Dnsignalized Intersections Release 2.1c Page
v uaysvvvv vvvvavavvauvavavaaaaavaavavvvaavvavaeaavaaavvaavaavavvavvaa
Center Por Microcomputers Ia Transportation
Oniversity of Florida
512 Neil Hall .
Gainesville, FL 32611-2083
Ph: (904) 392-0378
u vevvvavvvvvva vavvvvFORD aaaaavavm vavaevs (vE_W)...........RERvvvaaa
Streets: (N-S) AHBOTSPORD
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis .......... /96
Other Information........ 99 2000 2015 PM
Two-way Stop -controlled In section
.......... vvavavvvav uvanvvnvvn aanvanvanvvvavvava avavavaavvaavvaavaava
Eastbound Westbound Northbound Sorthbound
L T R �L T R L T R L T ... R
No. Lanes 0 > 1 0 0 1 c 0 0
Stop/Yield
volumes
PEP
Grade
MCI M
SD/RV's (t)
Cv' s M
PCE's
N
0 60
.95 :95
0
1.10
---------------
2
.95
0
N
32
95
Adjustment Factors
10 0 0
95 .95 .95
0
11.10 1.10 1.10
----------------------------
Vehicle
Critical
Follow-up
Gap (tg)
Time (tf)
Maneuver
"--___--
---------------------------------------------------------
Left Turn Major -Road
5.00
2.10
2.60
Right Turn Minor Road
5.50
3.30
Through Traffic Minor Road
6.00
Left Turn Minor Road _
6.50
3.40
HCS: unsignalized Intersections Release 2.1c
- Page 2
vevaavavaavavaaevvvvvaavaavasvavvvvavvavvavavaavasvvavaaavasaavavaaavva
Worksheet for TWSC Intersection
---------------------------------------------------------
Step 1: RT from Minor Street NB
SH
_ _ ____------_____--
Conflicting Plows: (vph)
19 -
1354
Potential Capacity: (pcph)
1354
Movement Capacity: (pcph)
Prob. of Queue -Free State:
.1.00
--------------------------------------------------------
Step 2: IT from Major Street WB
-----___-----
EE
___'_________-
Conflicting Flows: (vph)
36
1648
Potential Capacity: (pcph)
1648
Movement Capacity: (pcph)
1.00
Prob. of Queue -Free State:
.
1700
TH Saturation Plow Rate: (pcphpl)
RT Saturation Flow Rate: (pcphpl)
Major IT Shared Lane Prob.
of Queue -Free State:
1.00
--------------------------------------------------------
Step 3: TH from Minor Street --_--__---- NB
SE
__--------- _______----- _____
Conflicting_Flows: (vph)
82
Potential Capacity: (pcph)
988
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph)
988
Prob. of Queue -Free State:
1.00
--------------------------------------------------------
Stop 4: IT from Minor Street. NB
SE
----"'------------"-----------------------------------
Conflicting Flows: (vph) _
82
Potential Capacity: (pcph) -
949 '
Major IT, Minor TH
Impedance Factor:
1.00 ;
Adjusted Impedance Factor:
1.00 i
Capacity Adjustment Factor
due to Impeding Movements
1.00
Movement Capacity: (pcph) - �.
------------------------- "'------____---------------"'
949 .
Intersection Performance Summary
Avg. 95%
.
Flow Move Shared Total Queue
Approach
Rate Cap Cap Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------- --------------
_---- (sec/veh)
` -------- ------ ------ ------
SS L 12 949 >
BE T 0 988 > 949 3.8 0.0
A 3:8
SS R 0 1354 >
ER L .0 1648 - 2.2 0.0
A 0.0
Intersection Delay a 0.4 sec/veh
BCS: Unsignalized Intersections Release 2.1c Page
aaavovavavvaanvvva vavaavavaaaavvvavavaa a naavvaaaavaaavv aavnavavnv aannvv
Canter For Microcomputers In Transportation
University of Florida -
512 Weil Hall
Gainesville, FL" 32611-2083
Ph: (904) 392=0378
avavavvaavvavavvavaavaaa a aavavvaaaavvvvvaavvaavava aavaavavavasavaava.
.Streets: (N-S) CR 13 (E-W) DOUGLAS
Major Street Direction.... RW
Length of Time Analyzed... 60 (min)
Analyst.......... No
Date of Analysis.......... 7 96
Other Information........ 99 2000 2015 AM QD
Two-way Stop -controlled Intersection
vvavvavevaaaaaaavvvvaavaaavaaaaanavaaaavvvaavaaaavav anaaaava v aavasaaaan
Eastbound Westbound Northbound. Southbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Stop/Yield N N
Volumes 12 42 3 5 45 5 5 5 6 3 3 7
PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's M
SU/RV's M
CV's M
PCE's 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10
-----------------------------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver _
Gap (tg) -
Time (tf)
------------------------------_------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
- 3.30
Left Turn Minor Road
6.50
3.40
BCS: Unsignalized Intersections Release 2.1c
Page 2
v vavnvavv aavvavvvvavaaaaaaavanvaavvaavv aaaaaaaav vavavavvvvaavavaaavvvvv
. Worksheet for TWSC Intersection
.
--------------------------------------------------------
Step 1: RT from Minor Street
NB
SB -
___________________________________"'------------------
Conflicting Flows: (vph)
46
-
50- -
Potential Capacity: (pcph)
1312
1306
Movement Capacity: (pcph)
1312
1306
Prob. of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 2: IT from Major Street
WBBB
--------------------------------------------------------
Conflicting Flows: (vph)
47
52
Potential Capacity: (pcph)
1628
1619
Movement Capacity: (pcph)
1628
1619
Prob. of Queue -Free State:
1.00
0.99
TH Saturation Flow Rate:.(pcphpl)
1700
1700 -
RT Saturation Flow Rate: (pcphpl)
1700
1700
-Major IT Shared Lane Prob.
of Queue -Free State:
1.00
0.99
--------------------------------------------------------
Step 3: TH from Minor Street
NB
"'---
SE
..--------------------------------------------------
Conflicting Flows: (vph)
116
114
Potential Capacity: (pcph)
948
951
Capacity Adjustment Factor
due to Impeding Movements
0.99
'0.99 -
Movement Capacity: (pcph)
936
939 -
Prob. of Queue -Free State:
0.99
1.00..-
--------------------'--------'
Step-4:-LT-from-Minor-------'---
Street
- -=NH ----------'
3B -
________________________________________________________
Conflicting Flows: (vph)
118 - --
118 -
Potential Capacity: (pcph)
905
905
Major IT, Minor TH
-
Impedance Factor:
0.98
0.98
Adjusted Impedance Factor:
0.99
0.99 .
Capacity Adjustment Factor
-
due to Impeding Movements
"0.98
0.98 _
Movement Capacity: (pcph)
889
887
---------- ----------------------------------------------
Intersection Performance Summary
. - - Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate -Cap Cap Delay
Length LOS
Delay -
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
(sec/veh)
.
-------- ------ ------ ------ -------
NB L 6 889->"
------- -----
---------
NB T 6 936 > 1027 .3.6.
0.0 A
3.6
NB R 7 1312 >
-
SE L 3 887 >
SB T 3 939 > 1102 3.3
0.0 A
3.3
SB R 8 1306 >
.EB L 14 1619 2.2
0.0 A
-"0.5
--WB L 6 - 1628 2.2
0.0 A
0.2
i - Intersection Delay v-1.O
sec/veh
RCS: Unsignalized Intersections Release 2.1c - Page
......evvevv...va.vv...v..v.....v..v....vv.............................
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
vvvvvvvay......vvavvv............evvvva..v....v...v.....v.a.........v.
Streets: (N-S) CR 13 (E-W) DOUGLAS
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst.......... • MD
Date of Analysis .......... �,/�96
Other Information........ 199 2000 2015 ® PM
Two-way Stop -controlled Intersection
a vvvvvvv.v.v..........v................................................
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T .R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Stop/Yield N - N
Volumes 4 38 0 6 26 1 3 2 1 4 2 9
"PHF .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0 0
MC's M
SD/RV's M
Cv's (B)
PCE's 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver -
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
RCS: Dnsignalized intersections Release 2.1c
Page 2
......vvvvvevvvvvvvv.........v.avv.e.......v.v..v. a ....................
Worksheet for TWSC Intersection
---------------
----------------------------------------
Step 1: RT from Minor Street
NB
SB
---------------------------------------------------
- Conflicting Flows: (vph)
40
28
Potential Capacity: (pcph)
1321
1340
Movement Capacity: (pcph)
1321
1340
Prob. of Queue -Free State:
1.00
0.99
---------------------------------__---------------------
Step 2: LT from Major Street
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
40
28
Potential Capacity: (pcph)
1641
1662
Movement Capacity: (pcph)
1641
1662
Prob. of Queue -Free State:
1.00
1.00
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
1.00
.
1.00
--------------------------------------------------------
Stop 3: TH from Minor Street -
NB
SB
--------------------------------------------------------
' Conflicting Flows: (vph)
78
78
Potential Capacity: (pcph)
993
993
Capacity Adjustment Factor
due to Impeding Movements
0.99
0.99 -
Movement Capacity: (pcph)
986
986
Prob. of Queue -Free State:
1.00
1.00
--------------------------------------------------------
Step 4: LT from Minor Street_
NB
---------
SB
----------------------------------------------
Conflicting Flows: (vph)
83 -
79
Potential Capacity: (pcph)
948
953
Major IT, Minor TH
impedance Factor:
0.99
0.99
Adjusted Impedance Factor:
0.99
0.99 .
Capacity Adjustment Factor
due to Impeding Movements
0.99
- 0.99
Movement Capacity: (pcph)
935
946
------------------------------- `------------------------
- Intersection Performance Summary
-
Avg.
95%
Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
=
(sec/veh)
-------- ----- ------ ------ -------
US L 3 .935 >.
-------
----- ---------
. NB T 2 986 > 1001 3.6
0.0
A 3.6
NB R - 1 1321 >
SB L 4 946 >
SB T 2 986 > 1166 3.1
0.0
A 3.1
SB R 10 '1340 >
EB L 4 1662 2.2
0.0
A 0.2
WB L 7 1641 2.2
0.0
A 0.4
If
- Intersection Delay .
0.9 sec/veh
f- f__ 1- 7
8C5: Unsignalized Intersections Release 2.1c Page
evmmmaaaamvavmaaavammvaavaaavmaaaav avaaavavaeavvvavvavvvvvaaaavvaaaavaa
Center For Microcomputers In Transportation
University of Florida
512 Weil Ball .
Gainesville, FL 32611-2083
Ph: (904) 392-0378
maaamaeavvavvaavvvavaavaavvvaavaavaavavavvv vavvavvvvaaavaaavavvavavaa
Streets: (N-S) SB 1 (E-W) DOUGLAS
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 7 96
Other Information........ 99 2000 2015 AM
Two-way,Stcp-controlled Intersection
vvmaaaavvv a................................vvav
avvvovvavmv anmvavaannvva
Northbound Southbound Eastbound Westbound
L T R L T .R L T R L T R
No. Lanes 1-0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Stop/Yield
Volumes
PEP
Grade
MC's M
SD/RV's M
Cv'a M
PCE's
N
51 235 36
.95 .95 .95
0
1.10
----------------
N
3 122 37
.95 .95 .95
0
1.10
--------------
48 18 26
.95 .95 .95
0
1.10 1.10 1.10
--------------
Adjustment Factors
16 37 8
.95 .95 .95
0
1.10 1.10 1.10
---------------
vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
------------------------------------------------------------------
Left Turn Major Road
5.00
2.10
Right Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.00
3.30
Left Turn Minor Road
6.50
3.40
ECS: Unsignalized Intersections Release 2.1c Page 2
aavvavvvvvvvvvvavvaavvvvaaaa..vamvvvamvmm. a vavavavvavaamvvv mevvvvvvvvav
Worksheet for TWSC Intersection
Step 1: RT from Minor Street WB EB
Conflicting Flows: (vph)
266
148
Potential Capacity: (pcph)
1015
1165
Movement Capacity: (pcph)
1015
1165
Prob. of Queue -Free State:
0.99
0.97
--------------------------------------------------------
Step 2: IT from Major Street
SE
NB
____-____----------------"'----------------------------
Conflicting Flows: -(vph)
285
167
Potential Capacity: (pcph)
1254
1427
Movement Capacity: (pcph)
1254
1427
Prob. of Queue -Free State:
1.00
0.96
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major IT Shared Lane Prob.
of Queue -Free State:
1.00
0.95
-----------------------"'---------------_--___---------
Step 3: TH from Minor Street
--------------------------------------------------------
WE
EB
Conflicting Flows: (vph)
490
.
490
Potential Capacity: (pcph)
603
603
Capacity Adjustment Factor
due to Impeding Movements
0.95
0.95
Movement Capacity: (pcph)
572
572
--Prob. of Queue -Free State:
0.92
:------------
0.96
-------------------------------------------
Step 4: IT from Minor Street
WB
RB
--------------------------------------------------------
Conflicting Flows: (vph)
494
494
Potential Capacity: (pcph)
548
548
Major IT, Minor TH
Impedance Factor:
0.91
0.88
Adjusted Impedance Factor:
0.93
0.91
Capacity Adjustment Factor
-
due to Impeding Movements
0.91
0.90
Movement Capacity: (pcph)
498
492
------------------------------------------'----" "-"-
Intersection Performance Sum-mary
Avg.
95%
- Flow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (vah)
-------- ------ ------ ------
(sec/veh)
-------
EB L 56 492 >
-------
----- ---------
EB T 21 572.> .607 7.2
0.7
B 7.2
EB R 30 1165 >
- -
WB L 19 498 >
WB T 43 572 > 581 7.1
0.4
B 7.1.
WB R 9 1015 >
-
- NB L 59 1427 2.6
0.0
A 0.4
SE L 3 2254 - 2.9
i
0.0
A 0.1
.. Intersection Delav a'
1.9 sec/veh
r-_
HCS: Dnsignalized Intersections Release 2.1c Page 1
evavvvvvvevvemvvvavavvavvavvvavvvaveavavvvvvvvavavvevavavvvvvvvvavvavv
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, PL 32611-2083
Ph: (904) 392-0378
vvvvauvvvovvvvvvevvvvvvvvvvvvnvvavvavvvvvevvavvvvavvvvevvvavavvvvvvv.
Streets: (N-S) SH 1 _ (E-W) DOUGLAS
Major Street Direction.... NS
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 7/4/96
Other Information....... <99 2000 2015 ® PM
Two-way Stop -controlled Intersection
vvvvvvvavvvvvvvevovvvvveavavvvvavvxvavvvavvvvvavvvvvvvvvvvvav vvvv vvavav
Northbound Southbound Eastbound Westbound
L T R L T R L T R L T R
---- ---- ---- ---- -- ---- ---- ---- ---- ---- ----
No. Lanes 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0 0 > 1 < 0
Stop/Yield N N
volumes 12 62 14 8 218 38 21 33 40 33 15 0
PEEP .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 .95 -.95
Grade 0 0 0 0
MC-8 M
SU/RV's W
CV' 6 M .
PCE's 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Maneuver
-----------------------------
Left Turn Major Road
Right Turn Minor Road
Through Traffic Minor Road
Left Turn Minor Road
Critical
Follow-up
Gap (tg)
Time (tf)
----------------------
5.00
2.10
5.50
2.60
6.00
3.30
6.50
3.40
F.r
HCS: Dnsignalized Intersections
Release 2.1c
Page 2
vvavvvavvvvvvavvavvvvavvvvavvavvvavvvvvvvavvvavvvvvvvvvevvevvvvvvvevvev
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street------------
W-----------EB
.
----------------------------
Conflicting Flows: (vph)
72
249
Potential Capacity: (pcph)
1273
1036
Movement Capacity: (pcph)
1273
1036
Prob. of Queue -Free State: -
1.00
0.96
--------------------------------------------------------
Step 2: LT from Major Stree[-------------SB----------
NB
---
-----------------------
Conflicting Flows: (vph)
80
269
Potential Capacity: (pcph)
1570
1276
Movement Capacity: (pcph)
1570
1276
Prob. of Queue -Free State:
0.99
0.99
TH Saturation Flow Rate: (pcphpl)
1700
1700
RT Saturation Flow Rate: (pcphpl)
1700
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
0.99
--------------------------------------------------------
Step 3: TH from Minor Street -
'
WB
EB
--------------------------------------------------------
Conflicting Flows: (vph)
362
350
Potential Capacity: (pcph)
704
715
Capacity Adjustment Factor
due to Impeding Movements
0.98
0.98
Movement Capacity: (pcph)
691
702
Prob. of Queue -Free Stater
0.97
0.94
--------------------------------------------------------
Step 4: LT from Minor Street
WB
EB
--------------------------------------------------------
- Conflicting Flows: (vph)
381
.
350. _
Potential Capacity: (pcph)
_ 637
664 -_
Major LT, Minor TH
-
-Impedance Factor:
0.93
0.96
Adjusted Impedance Factor:
0.94
0.97 .
Capacity Adjustment Factor
due to Impeding Movements
0.90
0.97
Movement Capacity: (pcph)
575
642
--------------------------------------------------------
Intersection Performance Summary
Avg.
95%
Flow
Move Shared Total
Queue
Approach
Rate
Cap Cap Delay
Length
LOS
Delay
Movement
(pcph)
(pcph) (pcph)(sec/veh)
------ -------
(veh)
-------
-----
(sec/veh)
---------
--------
EB
L
------
24
------
642 >
EB
T
39
702 > 794 5.3
0.5
B
5.3
EB
R
46
1036 >
-
- WB
B
39
575 > - -
WB
T
18
691 > 607 6.5
0.3
B
6.5
WB
R
0
1273 > -
- NB
L
.14
1276 2.9
0.0
A
0.4
SB
L
9
IS70 2.3
0.0
A
0.1
Intersection Delay -
.1.7 sec/veh
APPENDIX B
TABULAR SUMMARY OF VEHICLE COUNTS
Observer AA CIeR 1 e-Date 3 Day Clty � A,e 1'`r&`R_ R = Right turn .
S = Straigm
INTERSECTION OF A R-ao~5 g;!5'e AND ri. e6rISof V L = Left turn
TIME
BEGINS
gsgcrs,�,2 (�
from NORTH
NOri�
South
GeQ-ra>? y
G[l-�oe-�
TOTAL.
TOTAL
from SOUTH
from EAST
[R---I
from WEST
R S
I
I L
Total R
11 R
S L Total
1
S L Total
I I
I IWimALL
R S L Total
730110
I
4-
4.11
1 1 1
1 4• to Is 1 1 sl
I1-5lo 1 1311
18 11
zz
745-1I01
131
3 II
1 I 1 II
3 II t 11 1 1 16 II
117 10 1 19 II
Z9 II
3Z
o Il
o I
2-
1 2 II
1 1 1 II
Z 11) 111 I 112. II
1 t-4-Ib 1 14-11
Z Co lI
Z
ts15 Ilo
I
I I
I 1 11
1 1 1 II
110 I-7 I I-7 it
I 4- 1 0 1 t¢
11 Z 1
11 z z
S3ollol
1 i II
I. I 1 II
11Z? I Ito II
I1011 1 t1
I Zc
11 ZZ
84s`II
I
131
411
1 1 1
II 111 1t21 It3 II
ItColo1 thll
2-911
33
I I
I
I II
I I I
II II i i I II
I I I
II
II
73o-oilol
Itel
10
II
I i I
II to IIZ13Z1
134 II
Ilaol of of
9 411
to
I
I
t
i
II
I I I
it
II I I I II
I I I
II
II
call
1 1 'I
71
II
11 1
11
114 1 3 81 14 Z 11
Is 41 1 I sl
711
10 S
II
I
i
I
I I I
it
II I I I
I I I I
II
II
I I I
II
II I I I II
I I I
I
I
I
I
I
II
I i
II
II I I I II
I I i
I
II
43o11o1
1 ¢1
II
1 1 1
11 4-
4-IZo I I Z II
IS Id l 6-1
Z9
II 33
4.46I01
1 ZI
Z
II
► I
II Z
01Z&l I ZGII
1 7 to 17
33
II 3S
mold
i
Z
Z
II
I I
II 2
II IZ-7 1 1 51 II
Izo I t I Z(
sZ
it 5-4-
s-r S
1 1
2
1 3
1
I I
tl 3
1 1 1 3 1 1 14- it
1 t O 10 110
Z- 4-
II Z?
II I
I
I
II
I I I
II
I I i 11
i I I
I
4��1
I'a 9 511
14 Z 1 1 14 3
1 3.9
11 ) 4- 9
I
TABULAR SUMMARY OF VEHICLE COUNTS
Observer � o Date 3 $ Q Day jrAt bA Y City LAP-oA672 (OQUAJ-r y R = Right tum
Straignt
INTERSECTION OF C9�2G!T1)Q�I / LC-'INq`I AND eo��vr2y ec.s L=.Lettturn .
TIME
BEGINS
Gr2ccoleY
L�.H a Y
TOTAL North
South
ea,Cc ut3
NrQY
v.ur2Y �cug
TOTAL
Em
TOTAL
ALL
tram NORTH
from SOUTH
tmm EAST
tram WEB
R S -'I
L I Total I
R I
S L I Total
R. I S I L I Total II
R I S L: I Total I
73o
Iz134-
414o1111
17
19 1 2711
67
l0l10 13ol 40 1117
1Z101 Z711
&9ll
13�
74s II
1 133
3 3-7115
1
11 Isl 21 II
s8 110
110 1zZ1 3Z IIZoI
li I I I z9
11 &1 II
ii 9
goo 11
1 izCo
1 3 1 3011
Z1 I(I 362 11 G& 11Z
1 9 1301 41 11
IT 1( 10 1 Z9
II 70 11
1 a�
1s 110
IZ-5
1 31 2&117
1(0 11( 1 3411 60 II
1 1 to Ilsl zCo 11171
S 13 1 z8
s4-11
114
3'30111
IZZI
Z I 2-Sll7
9 16 1 Z311 48 11
1 1 1411�71 37-1115'1
5- 1 1 1 z1
11 6-311
101
a4s11Z.
Izcel-
I s 37,
11zo
115 1101 43 11 -1 IT 110
113 1111 3o IIZ-71
It I 1 1 39
11 6
11 144
730
14 111(o113113all321S5131111
811Z5 11131311971139111ZI3914111
Tll25411tr0
Sco-goo 14
1 9 &I131
11
15
15 913 21 13 toll Z 4 q II
4 14 Co 1-7 911 Z 9 11
13 51 S 1 11 7
11 Z4
II 5
II
I
I I
II
I I I II
II I I I II
I I i
I
II
3cx0 10
1 T
I 1 1
IIIZ
121tZ1 3 II 4-4
14 1 1Z11-71 3311
9116-I 1 1 ZS11
s
it 10Z
316- 119
IT
1 1 z 8
1119
120 118 1 6-7 11 Ss--,5-
11 4 1 9 119 1 32-
114-I 14 1 0 1 z 3
4s
330 11
► 11,5
1 Z I IS'
11Za1331Z3184
11 ioZ-
14 1 to IZZI 3(oll
l4l 1Z 1 3 1 Z9
11 G5--
I flo7
345 to
12-1
1 1 1 ZZ1119
zgittls$ II -01131
41 7114-II/5rI
$IZI2S11
37
11 9
3co-4aO113
1631
sl 7 &17
? 31 4123 5113 1 1
I1151�35165111 .5115-Z14
91 110 711Z2
Z1If3
3
43o 111
1 If
1 01 l(a
1130
1 3! It4- 1 -76-11 91
11 Z 1 141171 33
TlZ1 14I 1 7--f
I 00
11 1 -/
445- 110
1 t(p
I Z I IY
ll-s4j
z8 11Z 1 11 9L
11 & 1 13 1 /9 1 37 IIll
1 12 1 1 1 -3
I (07
11 ! s9
aaO
O I I&
3 I 9
I Z3i
431ZZI S 3 11 /o �
II 3 110 1/51 Z 8 II
$I 1$ I I I Z?
II ss
II 1loZ
51S
II 1 1 Zo
I Z 1 23
11341
Z41 I &7 11 9 0
II 114 1171 37 1110
1 16-1 1 1 ziCo
11 & 3
1 1 s3
4�d�3o
2 IG?
7 1 7 611Z1
I IZ(�!r7I 3o4113 9 0
111716-1167113 5-11411
&sl411f o
11 24.5-11�
z
APPENDIX A
V. CONCLUSIONS
This study assessed the traffic impacts of the development of
Hearthfire on the short range (year 2000..) and long range (year
2015) street system in the vicinity of the proposed development.
As a result of this analysis, the following is concluded:
- Hearthfire is a residential development, comprised of 142
dwelling units. This facility is expected to generate
approximately 1415 daily vehicle trip ends, 109 morning peak hour
trip ends, and 150 afternoon peak hour trip ends.
Based upon current traffic volumes and existing
geometry/control, all key intersections operate acceptably..
In the short range with Hearthfire fully developed, all
intersections are expected to continue operating acceptably. This
assumes implementation of the planned improvements at the Terry
Lake/Douglas intersection and an eastbound right turn deceleration
lane on Douglas Road at the entry roadway to Hearthfire. This lane
should be 375 feet of deceleration distance and 180 feet of taper
based upon the existing 45 mph speed limit. Roadway paving may. or
may not occur depending on policy decisions by the involved
agencies. From an intersections operations perspective, the
findings of this study will not be affected under either pavement
scenario.
Approximately 30 vehicles per peak hour are expected to
use CR 13 and the connecting street system to travel south in the
short range. These vehicles are expected to use the roadway system
provided by the Richard Lake development in the long range future.
Since no direct access to CR 13 is planned, the Richard Lake
roadway system will provide the shortest, most efficient travel
path. Accordingly, diversion of site traffic to nearby
neighborhoods to the southwest will likely be temporary.
In the long range future, all area roadways and
intersections are expected to operate acceptably. Given the.
anticipated traffic forecasts, acceptable operations can be
expected for the foreseeable future.
5
TABLE 4
2015 Peak Hour Operation
Level
of Service
..Intersection
AM
PM
Terry Lake/Douglas
(stop sign)
EB LT/T
B
D
EB RT
A
A
WB LT/T/RT
C
C
NB LT
A
A
SB. LT
A
A
CR 13/Douglas (stop
sign)
NB LT/T/RT
A
A
SB LT/T/RT
A
A
EB LT
A
A
WB LT
A
A
Abbotsford/Gregory
(stop sign)
SB LT/T/RT
A
A
EB LT
A
A
,Country Club/Lemay
(all way stop)
EB
B
B
WB
A
A
NB
A
C
SB
A
A
Douglas/Site Access
(stop sign)
NB LT
A
A
NB RT
A
A
WB LT
A
A
TABLE 3
2000 Peak Hour Operation
Intersection
Terry Lake/Douglas (stop sign) .
EB LT/T
EB RT
WB LT/T/RT
NB LT
SB LT
CR 13/Douglas (stop sign)
NB LT/T/RT
SB LT/T/RT
EB LT
WB LT
Abbotsford/Gregory (stop sign)
SB LT/T/RT
EB LT
Country Club/Lemay (all way stop)
EB
WB
NB
SB
Douglas/Site Access (stop sign)
NB LT
NB RT
WB LT
Level of Service
AM PM
B C
A A
B C
A A
A A
A A
A A
A A
A A
A A
A A
B A
B A
B B
B A
A A
A A
A A
T
cr
o� rn
� n�'
7/15
U
��
\�
j 7
�
"' 1
-F— 30/70
^ �
110/117
— 44 74
/r--111/57
DOUGLAS RD, j
/� 1/7
r— 9/30 CO.
AD.
36% 3 —�
5/16 I I
60 39
94/58 —�
���
81/147 —•
0/4
25/88
C��
n —
_�
��cr
o
"op j
0
O +�
Q
A j
LU
co
arc 90
co
� qa
cl' 4/25
to 56/73
COUNTY CLUB RD. �� 138/86
6/6�
52/87 oNo to m
96/55 --�
Ld
AM / PM
a
J
TOTAL LONG RANGE PEAK HOUR TRAFFIC
54
Figure 10
c
Nw
1
21/55
/r-7e/44 DOUGLAS RD.
29/58
48/27 - r
75/47 --�
�"-
NAM
T
ci
m
O
U
�tz�
-1 /5
C" "
—72/76
-t-36 58
24/16.
�- 6 21 CO.
4/13
} r46/55-
21/72 -�
56/97 -�-
0/3 --\
or
W
�
�„ \
r SITE J
N
�
O�N
�N
vd�
0
r, co �- 4/23
n 1 ^ 42/55
COUNTY CLUB RD. + 104/72
42%80 � C,4 C"'
77/44
W
a
AM PM
w
J
TOTAL SHORT RANGE PEAK HOUR TRAFFIC Figure 9
Lake Road is also expected to divert to alternate roadways in the
long range future. Figure 9 shows total morning and afternoon peak
hour traffic in the year 2000 short range future with full
development of Hearthfire. Figure 10 shows total morning and
afternoon peak hour traffic in the long range future (2015)..
i
1 IV. TRAFFIC IMPACTS AND ANALYSIS
Signal Warrants
{ As a matter of policy, traffic signals are not installed at
t-- any location unless warrants are met according to the Manual on
Uniform Traffic Control Devices. Based upon the forecasted traffic
volumes, it appears that the key intersections.will not meet peak
L hour signal warrants.
Operation Analysis
Capacity analyses were performed on the key intersections in
the vicinity of Hearthfire for both short range (year 2000) future
and long range (year 2015) future traffic conditions.
Using the traffic volumes shown in Figure 9, the key
intersections operate in the short range future, with Hearthfire,
as indicated in Table 3. Calculation forms for these analyses are
provided in Appendix C. These analyses assumed implementation of
an eastbound right turn lane at the site access roadway along
Douglas Road. Per Larimer County Access Policy criteria, this lane,
appears to be warranted. The planned widening at the Terry
Lake/Douglas intersection (addition of a southbound right -turn
lane, northbound and southbound left -turn lanes, and an eastbound
right -turn lane) was assumed to be implemented in the short range
future. No other improvements were assumed.' All traffic movements
and intersections are expected to operate acceptably. It should
be noted that unpaved portions of roadways within the study area
were assumed to remain unpaved. Whether or not this assumption is
correct is a policy decision and beyond the scope of this study.
Using the traffic volumes shown in Figure 10, the key
intersections operate in the long range future (year 2015) as
Lindicated in Table. 4. Calculation forms are provided in Appendix
D. No additional roadway improvements were assumed in place in the
long range future, except for the road connections through the
Richard Lake development. Long range operating conditions are
expected to remain acceptable with all traffic movements operating
at level of service C or better.
L
L
m
0
0
N
�-- 4/3
U
- NOM.
+ 36/24
% 32/21 DOUGLAS RD.
/r- NOM.
/r— s/21 CO.,VD.
54
NOM.
I
I
15/51-
15/51--�
I
I
n
z.
�0
C
to�.
o
SITE J
v
�9:�
000
zzz
COUNTY CLUB RD. \—NOM.
NOM. }
0
z
W
} AM / PM
a
w
J
LONG RANGE SITE GENERATED TRAFFIC Figure 8
N 4/3
1 NOM.
`� fir- 3s/25 DOUGLAS RD.
NOM. -
n
m
U.
N
O
m
m
a
0
m
0
U
43/28
r-18/11 f- 8/21 CO.
15/51 21/72 --,.[to
ft
r ' SITE �
wY
i�j F
cd�
a '�o
lw-
qa
COUNTY CLUB RD. 1 \-1/4
1 /4 --�
M
w
} AM / PM
a
SHORT RANGE SITE GENERATED TRAFFIC
Figure 7
N
0
0
U
NOMINAL 507-607 20%-25%
DOUGLAS RD.. — CO. RD. 54
Ln
.tpo. N
U�
Ln
Ln
SITE j
m
o.
m
m
a
NOTE: IN THE LONG RANGE, A SIGNIFICANT
PORTION OF THESE TRIPS ARE EXPECTED TO
USE THE RICHARD LAKE ROAD STREET SYSTEM
p TO COUNTY ROAD 11.
Q
.. Qcc
c9F
co
�0
0
COUNTY CLUB RD.
TRIP DISTRIBUTION
Figure 6
Land Use
Single Family - 148 DU
TABLE 2
Trip Generation
Daily. A.M. Peak P.M. Peak
Trips Trips Trips Trips Trips
in out in out
1415 28. 81 98 52
1 Trip Generation
LL
Trip generation is important in considering the impact of a
development such as this upon the existing and proposed street
system. A compilation of trip generation information was.prepared
by the Institute of Transportation Engineers and is presented in
Trip Generation, 5th Edition. This document was used to estimate
�Y the daily and peak hour vehicle trips generated by Hearthfire. The
:land use code from Trip Generation, 5th Edition was Single -Family
i Detached Housing .(210).. Table 2 shows the daily and peak hour
J` traffic from Hearthfire. A vehicle trip is defined as a one-way
vehicle movement from a point of origin to a point of destination.
Trip Distribution
Directional distributions were determined for the land uses
considered in this study. This distribution considered trip
attractions in the Fort Collins area, and existing travel patterns
in the area. The trip distribution used in subsequent analyses is
shown in Figure 6.
Background Traffic
Background traffic is defined as the traffic that is and/or
will be on the area streets that is not related to the proposed
development. Future analysis years were 2000 (short range) and
2015 (long range). This is a developing area of Fort Collins and,
as such, the traffic increases are largely dependent upon land
development. Background traffic was increased. incrementally by 1.5
percent per year to estimate short and long range background
traffic. This growth rate is consistent with the CDOT 20 year
L factor for SH 1 and the estimated increases in housing and
employment for traffic zones in this area as noted in the "North
Front Range Regional Transportation Plan." In order to present a
1. conservative analysis, site related traffic was considered
supplemental to the increase in background traffic.
Trip Assignment
Trip assignment is how the generated and distributed trips
are expected to be loaded on the street system. The assigned trips
are the resultant of the trip distribution process. Figures 7 and
8 show the assignment of the generated trips from the residential
land use considered in this study. The Figure 7 assignment assumes
the existing street system. Figure 8 assumes implementation of -the
Richard Lake development and additional access to Hearthfire.
through this adjacent development. This will allow site traffic
to not be required to use Douglas Road to travel south.
Additionally, some of the site traffic turning south onto Terry
( 3
N
II N0 §CALE
DOUGLAS ROAD
SCHEMATIC SITE PLAN
Figure 5
TABLE 1
1996 Peak Hour
Operation
Level
of Service
Intersection
AM
PM
Terry Lake/Douglas
(stop sign)
EB LT/T/RT
B
B
WB LT/T/RT
B
B
NB LT
A
A
SB LT
A
A
CR 13/Douglas (stop
sign)
NB LT/T/RT
A
A
SB LT/T/RT
A
A
EB LT
A
A
WB LT
A.
A
Abbotsford/Gregory
(stop sign)
SB LT/T/RT
A
A
EB LT
A
A
Country Club/Lemay
(all way stop)
EB
A
A
WB
A
A
NB
A
B
SB
A
A
9
� N
I, 52
1996 DAILY TRAFFIC (ADT) Figure 4
0
m
cNv
O
°i
�• —15/37
33/16
�N � 26545
DOUGLAS RD.s�
21 /48 —1
I
4/12
33/18 —
40/26
tc
\
38/42
0/3
r, N
c.4
N
t0
�aT� 9
co
0.
a
1-u
90
�o
v
3/17
+
— 39/51
97/67
COUNTY CLUB RD.
%
4X 4
� t
39 65 —
72/41--�
N
i L
L M
W
a
a
W
J
CO.
r—
G
cc
O
U
AM / PM
4.
N
54
RECENT PEAK HOUR TRAFFIC
Figure 3
cl
A
U
DOUGLAS ROAD
(CO. RD, 54)
PM
INVERNESS
(CO.RD.52E)rj
RICHARDS
LAKE
'
ROAD
'Pry,
y9�
d
<9
W
CIF
RICF
w
r
S�,05
MCA
ti W
COUNTRY CLUB ROAD
(CO. RD. 50E)
WILLOX LANE
w
D
z
w
a
r
w
I
ARD��I c❑. RD. �5 Z
ROAD �—
AREA STREETS
1
Figure 2
on the Fort Collins Master Street Plan. Its existing cross
section, in this area, has one 12 foot lane in each direction.
Douglas Road extends to and beyond Terry Lake Road (SH 1) to the
J west and covers significant distances to the east beyond I-25.
The posted speed limit is 45 mph adjacent to the site.
County Road 13 (CR 13) is a north -south roadway extending
north and south of Douglas Road. To the south it is somewhat
discontinuous due to Richard Lake. The current road system south
of Douglas Road include CR 13, CR 11, Inverness Road, Abbotsford
t Road, Gregory Road, Lemay Avenue, and Country Club Road. CR 13,
Inverness Road, and part of Abbotsford Road are unpaved.two lane
roadways. The area streets are shown on Figure 2.
i_
Existing Traffic
Morning and afternoon peak hour traffic data were obtained as
part of this study or obtained from recent traffic studies in the
area. This information is presented in Figure 3. As shown peak
hour traffic volumes are presented at the Douglas Road
intersections with Terry Lake Road and CR 13, the Abbotsford/
Gregory intersection and the Lemay/Country Club intersection. Raw
traffic data is presented in Appendix A. Figure 4 shows recent
daily traffic volumes on area streets.
Existing Operation
Using the traffic volumes shown in Figure 3 and the existing
control, the key intersections operate at indicated in Table 1.
Calculation forms for these analyses. are provided in Appendix B.
J As shown on Table 1 all intersections currently operate acceptably.
For evaluation purposes, acceptable level of service is defined as
L level of service.D or better during peak hour conditions. Current
levels of service in the area of the site typically are B or
better.
III. PROPOSED DEVELOPMENT
Hearthfire is a residential development proposed south of
Douglas Road and east of CR 13 in Fort Collins. As currently
planned, it will have 148 single family residential units which
are expected to be completed over the next 3-4 years.. Figure 5
shows a schematic of the site plan of Hearthfire. Site access is
planned via a single access to Douglas Road. This access will be
a public roadway which will extend to the south and connect
to/through the Richard Lake development in the future. The access
9 to Douglas Road will be located about 650 feet east of CR 13.
2
y
1'
(
q
COUNTY ROAD 58
N
WINDSOR
RESERVOIR
tt
b
COUNTY
ROAD 96
ANNEX
NO.B ELDOR
-
RESERVDi
A
d
AK E �J �M H ARTHFIRE
LAKE Y ,1 rc R D �p PUD
J
ROAD
P�
COUNTRY CLUB ROAD
.` WILLO3' LANE
N
DOWNTOWN
� FORT COLLINS
NO SCALE
SITE LOCATION
N
Figure 1
I. INTRODUCTION
This traffic impact study addresses the capacity, geometric,
and control requirements at and near a proposed residential
development known hereinafter as Hearthfire PUD. It is proposed
to be located east: of County Road 13 and south of Douglas Road in
Fort Collins, Colorado.
.During the course of the analysis, numerous contacts were
made, with the project planning consultant (Jim Sell Design), the
Fort Collins Planning Department, and the Fort Collins
Transportation Division. This study conforms with typical traffic.
impact study guidelines. The study involved the following steps:
- Collect physical, traffic, and development data.
- Perform trip generation, trip distribution, and trip
assignment.
Determine peak hour traffic volumes.
Conduct capacity and operational level of service
analyses on key intersections.
- Determine roadway improvements as deemed appropriate.
Traffic studies and current planning efforts for a previous
development proposal on the site, the Richard Lake development,
the Terry. Shores development, and the "North Front Range Regional
Transportation Plan" were reviewed as part of the analysis.
II. EXISTING CONDITIONS
The location of the Hearthfire site is shown in Figure 1.
Since the impact in the short range, as well as, the long range is.
of concern, it is important that a thorough understanding of the
existing conditions be presented.
Land Use
The Hearthfire site is located on the far north side of Fort
Collins. The area surrounding the site is primarily undeveloped
with some residential developments lying primarily to the west and
east of the site. Richard Lake is south of the site.
' Roads
The primary streets. near Hearthfire are Douglas Road and
County Road 13. Douglas Road is adjacent to Hearthfire on the
north. It is an east -west street designated as a minor arterial
1
HEARTHFIRE PUD
SITE ACCESS STUDY
FORT COLLINS, COLORADO
JULY 1996
Prepared for:
Richards Lake Development Co.
Fort Collins, COlorado
Prepared by:
MATTHEW J. DELICH, P.E.
2272 Olen Haven Drive
Loveland, CO 8053E
Phone: 970-669-2061
FAX: 970-669-5634
HCS: Unsignalized Intersections
Release
2.1c
Page
.... ....... ...... .................. vu.................................
Center For Microcomputers In Transportation
University of Florida
512 Weil Rall
Gainesville, FL 32611-2083
Ph: (904) 392-0378
.......................................................................
Streets: (N-S) SITE ROAD (H-W) DOUGLAS
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... MD
Date of Analysis.......... 7 96
Other Information........ 000 2015 AM
Two -Dray Stop -controlled Intersection
.......................................................................
Eastbound Weatbound Northbound Soutbbound
L T R L T R L T R L T R
---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ----
No. Lanes 0 1 1 0 > 1 0 1 0 1 0 0 0
Stop/Yield 4 N
Volumes 55 72 21 58 39 11
PEF .95 .95 .95 .95 .95 .95
Grade 0 0 0
MC'e ($)
SU/RV's ($)
CV's ($)
PCE's 1.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Maneuver
------------------------------
Left Turn Major Road
Right Turn Minor Road
Through Traffic Minor Road
Left Turn Minor Road
Critical
Follow-up
Gap (tg)
Time (tf)
------------------------------
5.00
2.10
5.50
2.60
6.00
3.30
6.50
3.40
RCS: Unsignalized Intersections Release 2.1c
Page 2
.......................................................................
Worksheet for TWSC Intersection
' --------------------------------------------------------
Stop 1: RT from Minor Street
NS
SB
--------------------------------------------------------
Conflicting Flows: (vph)
58
Potential Capacity: (pcph)
1294
Movement Capacity: (pcph)
1294
Prob. of Queue -Free State:
0.99
-------------
Step 2: IT from Major StreetWB-----------BB
--------------------------------------------------------
Conflicting Flows: (vph)
5e
Potential Capacity: (pcph)
1609
Movement Capacity: (pcph)
1609
Prob. of Queue -Free State:
i
0.99
TH Saturation Flow Rate: (pcphpl)
1700
Major LT Shared Lane Prob.
of Queue -Free State:
0.98
--------------------------------------------------------
Stop 4: LT from Minor Street
NB
SB
-------- ------------------------------------------------
Conflicting Flows: (vph)
141
Potential Capacity: (pcph)
877
Major IT, Minor TH
- Impedance Factor:
0.98
Adjusted Impedance Factor:
0.98
Capacity Adjustment Factor
due to Impeding Movements
0.98
Movement Capacity: (pcph)
--------------------------------------------------------
863
Intersection Performance Summary
Avg.
95%
iFlow Move Shared Total
Queue
Approach
Rate Cap Cap Delay
Length LOS
Delay
j Movement (pcph) (pcph) (peph)(sec/veh) (veh)
'
(sec/veh)
-------- ------ ------ -------------
NB L 45 863 4.4
------- -----
0.0 A
---------
4.1
NB R 13 1294 2.8
0.0 A
WB L 24 1609 2.3
0.0 A
0.6
Intersection Delay .
1.0 sec/veh
HCS: Dnsignalized Intersections Release 2.1c Page
vvavvvvvaavvv v vavvaavvvvavvavvvvaavv vaavav v vvvvavvv v vvvavvvavevavavva
Center For Microcomputers In Transportation
University of Florida
512 Weil Ball
Gainesville, FL 32611-2083
Ph: (904) 392-0378
vvvvavvvevvvvaavvavvvvavvvvavavavvevaavvvv vav maaaamaaaaaavavvvvvvaa.
Streets: (N-S) ABBOTSFORD (E-W) GREGORY titer
Major Street Direction.... RW
Length of Time Analyzed... 60 (min)
Analyst ................... NO
Date of Analysis.......... 7/4/96
Other Information......... 1996 2000 201 AM PM
Two-way Stop -controlled Intersection
vavvvaava vvmav v mnvav v vvaavvv vv mmva v umavavuaavvvvvvvvvv vvvvvvvmaav
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
____ ____ ____ ____ ____ ____ __-- ---- ---- -___ ___- ----
No. Lanes 0 > 1 0 0 1 < 0 0 0 0 0 > 1 < 0
Stop/Yield N N
Volumes 1 59 114 12 13 0 1
PHF .95 .95 .95 .95 .95 .95 .95
Grade 0 0 0
MC's (%)
SU/RV's M
CV's M
PCE's 1.10 1.10 1.10 1.10
-----------------------------------------------------------------------
Adjustment Factors
Vehicle
Maneuver
----------------------------
Left Turn Major Road
Right Turn Minor Road
Through Traffic Minor Road
Left Turn Minor Road
Critical
Follow-up
Gap (tg)
Time (tf)
--"'-------------------------
5.00
2.10
5.50
2.60
6.00
3.30
6.50
3.40
HC3: unsignalized Intersections Release 2.1c Page 2
vvvvmvvvvvvvvvvvav avavavvvvvvv vavavvvaavvavvavv msavmav mvavveaavavaama
Workshest for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor StreetNB
__--__-_---- ""-""'---
SB
____________ _'
Conflicting Flows: (vph)
1 26
119955
Potential Capacity: (pcph)
1195
movement Capacity: (pcph)
1.00
Prob. of Queue -Free State:
__•-------------------------------------"'
Step 2: IT from Major Street
_____-___-_- -"'----""_
--
_ _ ____
Conflicting Flows: (vph)
133
1482
Potential Capacity: (pcph)
1482
Movement Capacity: (pcph)
1.00
Prob. of Queue -Free State:
Rate: (pcphpl)
1700
TH Saturation Flow
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue-Pree State:
1.00
--------------------------------------------------------
Step 3: TH from Minor Street NB
SB
______________________'__'______'__'-___'_'_'-__----
Conflicting Flows: (vph)
190
867
Potential Capacity: (pcph)
Capacity Adjustment Factor
1.00
due to Impeding Movements
866
66
Movement Capacity: (pcph)
1
Prob. of Queue -Free State:
.00
--------------------------------------------------------
Step 4: LT from Minor StreetNB
________________________
SB
_
________________________
Conflicting Flows: (vph)
190
190
822
Potential Capacity: (pcph)
Major LT, Minor TH
1.00
Impedance Factor:
1.00
Adjusted Impedance Factor:
Capacity Adjustment Factor
1.00
due to Impeding Movements
821
Movement Capacity: (Pcph)
-------------"'----------------------------------------
Intersection Performance Summary
Avg. 95%
Flow Move Shared Total Queue
Approach
Rate Cap Cap Delay Length
LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh)
------ ------- -------
(sec/veh)
----- ---------
-------- ------ ------
SB L 15 821 >
SB T 0 866 > 837 4.4 0.0
A 4.4
SB R 1 1195 >
EB L 1 1482 2.4 0.0
A 0.0
Intersection Delay a 0.3 sec/veh