HomeMy WebLinkAboutHEARTHFIRE PUD, 1ST FILING - FINAL - 31-95D - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPLEMENTAL INFORMATIONPoudre School Distric`'10-17-96 ; 8:57
30349V9244 9704823038;i 2
•
n
POUDRE
SCHOOL
DISTRICT
October 17, 1996
March & Myatt PC
Attn: Lucia Lilley
110 East Oak
Fort Collins, CO 80524
1• ON•' of 1'
EXHIBIT
C
As you requested, I have enclosed the estimated student population that this subdivision
will generate. Also enclosed is the estimated cost to transport these children to different
locations. There are several factors that may change the schools that these children will
attend:
1). The year and density of the subdivision
2). The enrollment of Tavelli Elementary at any given time
3). The enrollment of surrounding elementary schools
4). Possible boundary changes of attendance areas
At this time the figures that I have provided are only estimates. If I can be of further help
please contact me at 490-3509.
Sincerely,
OMgenanager
FAX No.
{�• ,5-96 HE 12:53 PM JIM SFI•L DESIGN INC. 3o3aso3 970 484 24433 3
SENT By:P �dr Shoot Distri110- EXHIBIT
J
B
Moadlj, October 14.1996
devdopmenr at Rictaid81 aloe iload' � CR 11. At this [hoe the
fin' tion coat osdwatc fog the DmW� the etdatM9 routoa. M
Below is tho tgag+" gale to aE *the sow ta,d U at the accondary level � Thu admaod COW ate:
nnmbore look good d be wooded in order to sm'ce any of rho proposed pletnealarY
additional [Dote wool
If rho when ary School is Irish.
23 I WN/dW 0 SO.SOhntla'
I hourlday S11 S0&w
If the Elementary School is Moots:
25 MilwDay @ SO-sollilo -
1,05houtsldsy® S11.50/mllc-
If the Eteawntary Schtal is Laurel:
25 Miles/dW ® SO.SOim7o
1.03 honnlday ® 511.50lmiie =
If the ElcmentUY School is Dessert:
S11.501day
$11.50/dsy . g4140.00/year
523.001day X 180 days
$12.50/day
$12.08/daY s24.stlldAl X 190 days w s54
$12.50lday
S11.W.day s 94469. w
S24.831day X IN dar
31.5 Milrslday ® So"'/rAile = 515.751d4y
1.32 Houtslday ® S11.50/n ilc' SI5.18/day
530.971da7 X 180 Jaya " SSS6T.40h'a*
If the Junior High is Caehe Lapoudrs: ould add approxumately 6 minutes a day to the t ws Cast vtotdd be:
Add Vero b 2 °1iUs a daY to an etdstiU tome, wS1.001dsY
2.0 udles/daY ® $0.50/tniln •
0.1 houttldsy @ SI1.50/hotue= S1.13/day
S2.151day X 180 data' 5387.00lYea
If the Junior High is Liaeolu: :dtnssclY 3 minutes a day to the ma- Coo would bc:
Add aS Pmximateiy 1 miles a day to an existing route, would add spPro
1.0 mi]ee/day ® 30.50/mne = $0.50ldaY
0,05 hoars/daY @ Sil3ohnilc- S0.53/dw S189.0o/yar
S1.Og/dg1' R 180 days =
T40 Mgb School would be poudrC
Add gox
apptmatib 1 miles a day to tm exiling rout= would add approximately 3 mbTAw a Ito the tnn Cartwouldbe:
1.0 miladday ® gp solmile - SO.SO/day 1.1.
0.05 houWday ® 311.50/mile - 30.55/day . SIE9.001Yar
SL05ldow X 'so days
It you have any
QueW
cns. gjw mo a call--490-3576
ac: Richard King, Ron Spies.
.K34993524
-----�
0"1-1 F- 96
No Text
11
M
�4
7
SCHOOL BUSSING INFORMATION/COSTS
Ron Daggett, Property Manager for PR-1, was contacted to
determine the number of students generated from the development and
potential cost impact related to bussing.
Exhibit A is Mr. Daggett's summary of. students from this
development. This shows a total of 88 students for all three
,levels (elementary, junior high and high school) at full build out.
Exhibit B shows the bussing cost per student at each level
based upon the different schools which might be attended. This
table shows very minimal bussing costs at the junior high and high
school levels since routes already exist with capacity to service
the development. An additional bus route would be needed at the
elementary level which, depending on the particular school, would
cost between $4,140 and $5,567 per year.
In conversations with Mr. Daggett, he stressed that it is not
certain that any of the students from this development will be
bussed or, if they are bussed, for what period of time. Since
boundary changes occur annually, it may be decided that these
students, along with students from Richards Lake PUD will be sent
to Tavelli Elementary while students from some areas who currently
attend Tavelli may be sent to the new Harris/Laurel Elementary or
elsewhere within PR-1. Numerous factors affect this decision on
bussing. See letter from Mr. Daggett dated October 17, 1996
(Exhibit C).
SCHOOL PROJECTIONS
Proposal: #31-95D Hearthfire PUD, 1st Filing - Final
Description: 91 single family residential lots on 66.15 acres.
Density: 1.37 du/ac (gross)
General Population:
91 (single-family units) x 3.2*(persons/unit) = 291
School Age Population:
Elementary: 91 (units) x .396 (pupils/unit) = 36
Junior High: 91 (units) x .185 (pupils/unit) = 17
Senior High: 91 (units) x .166 (pupils/unit) = 15
TOTAL = 68
*Figures assume a mixture of 2 and 3 bedroom single family residential units.