Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 1ST FILING - FINAL - 31-95D - SUBMITTAL DOCUMENTS - ROUND 1 - SUPPLEMENTAL INFORMATIONPoudre School Distric`'10-17-96 ; 8:57 30349V9244 9704823038;i 2 • n POUDRE SCHOOL DISTRICT October 17, 1996 March & Myatt PC Attn: Lucia Lilley 110 East Oak Fort Collins, CO 80524 1• ON•' of 1' EXHIBIT C As you requested, I have enclosed the estimated student population that this subdivision will generate. Also enclosed is the estimated cost to transport these children to different locations. There are several factors that may change the schools that these children will attend: 1). The year and density of the subdivision 2). The enrollment of Tavelli Elementary at any given time 3). The enrollment of surrounding elementary schools 4). Possible boundary changes of attendance areas At this time the figures that I have provided are only estimates. If I can be of further help please contact me at 490-3509. Sincerely, OMgenanager FAX No. {�• ,5-96 HE 12:53 PM JIM SFI•L DESIGN INC. 3o3aso3 970 484 24433 3 SENT By:P �dr Shoot Distri110- EXHIBIT J B Moadlj, October 14.1996 devdopmenr at Rictaid81 aloe iload' � CR 11. At this [hoe the fin' tion coat osdwatc fog the DmW� the etdatM9 routoa. M Below is tho tgag+" gale to aE *the sow ta,d U at the accondary level � Thu admaod COW ate: nnmbore look good d be wooded in order to sm'ce any of rho proposed pletnealarY additional [Dote wool If rho when ary School is Irish. 23 I WN/dW 0 SO.SOhntla' I hourlday S11 S0&w If the Elementary School is Moots: 25 MilwDay @ SO-sollilo - 1,05houtsldsy® S11.50/mllc- If the Eteawntary Schtal is Laurel: 25 Miles/dW ® SO.SOim7o 1.03 honnlday ® 511.50lmiie = If the ElcmentUY School is Dessert: S11.501day $11.50/dsy . g4140.00/year 523.001day X 180 days $12.50/day $12.08/daY s24.stlldAl X 190 days w s54 $12.50lday S11.W.day s 94469. w S24.831day X IN dar 31.5 Milrslday ® So"'/rAile = 515.751d4y 1.32 Houtslday ® S11.50/n ilc' SI5.18/day 530.971da7 X 180 Jaya " SSS6T.40h'a* If the Junior High is Caehe Lapoudrs: ould add approxumately 6 minutes a day to the t ws Cast vtotdd be: Add Vero b 2 °1iUs a daY to an etdstiU tome, wS1.001dsY 2.0 udles/daY ® $0.50/tniln • 0.1 houttldsy @ SI1.50/hotue= S1.13/day S2.151day X 180 data' 5387.00lYea If the Junior High is Liaeolu: :dtnssclY 3 minutes a day to the ma- Coo would bc: Add aS Pmximateiy 1 miles a day to an existing route, would add spPro 1.0 mi]ee/day ® 30.50/mne = $0.50ldaY 0,05 hoars/daY @ Sil3ohnilc- S0.53/dw S189.0o/yar S1.Og/dg1' R 180 days = T40 Mgb School would be poudrC Add gox apptmatib 1 miles a day to tm exiling rout= would add approximately 3 mbTAw a Ito the tnn Cartwouldbe: 1.0 miladday ® gp solmile - SO.SO/day 1.1. 0.05 houWday ® 311.50/mile - 30.55/day . SIE9.001Yar SL05ldow X 'so days It you have any QueW cns. gjw mo a call--490-3576 ac: Richard King, Ron Spies. .K34993524 -----� 0"1-1 F- 96 No Text 11 M �4 7 SCHOOL BUSSING INFORMATION/COSTS Ron Daggett, Property Manager for PR-1, was contacted to determine the number of students generated from the development and potential cost impact related to bussing. Exhibit A is Mr. Daggett's summary of. students from this development. This shows a total of 88 students for all three ,levels (elementary, junior high and high school) at full build out. Exhibit B shows the bussing cost per student at each level based upon the different schools which might be attended. This table shows very minimal bussing costs at the junior high and high school levels since routes already exist with capacity to service the development. An additional bus route would be needed at the elementary level which, depending on the particular school, would cost between $4,140 and $5,567 per year. In conversations with Mr. Daggett, he stressed that it is not certain that any of the students from this development will be bussed or, if they are bussed, for what period of time. Since boundary changes occur annually, it may be decided that these students, along with students from Richards Lake PUD will be sent to Tavelli Elementary while students from some areas who currently attend Tavelli may be sent to the new Harris/Laurel Elementary or elsewhere within PR-1. Numerous factors affect this decision on bussing. See letter from Mr. Daggett dated October 17, 1996 (Exhibit C). SCHOOL PROJECTIONS Proposal: #31-95D Hearthfire PUD, 1st Filing - Final Description: 91 single family residential lots on 66.15 acres. Density: 1.37 du/ac (gross) General Population: 91 (single-family units) x 3.2*(persons/unit) = 291 School Age Population: Elementary: 91 (units) x .396 (pupils/unit) = 36 Junior High: 91 (units) x .185 (pupils/unit) = 17 Senior High: 91 (units) x .166 (pupils/unit) = 15 TOTAL = 68 *Figures assume a mixture of 2 and 3 bedroom single family residential units.