HomeMy WebLinkAboutHEARTHFIRE PUD - RESUBMITTED PRELIMINARY (REMAND FROM CITY COUNCIL) - 31-95C - CORRESPONDENCE -development relative to current City policies, and the relationship of some lots to the
existing, operating oil well. Project Notes 8 and 9 on the Site& Landscape.Plan would
indicate that Lots 73, 107, 108, and 110.have areas outside of the minimum 150,
separation distance that are.buildable and that a building permit can be issued. on Lot
109 when the "150' setback restriction is removed". The buildable areas are
questionable and what all triggers the setback restriction to be removed?
At this point in time Larimer County has concerns about a single point of access into.
this development. Both the City. and County want information on how many lots can be
built and occupied before a second point of: access is provided.
This completes the review comments at this time. Additional comments may be
forthcoming as the various departments and reviewing agencies continue to review this
request. Please be aware of the following dates and deadlines to assure your ability to
stay on schedule for the August 26, 1996 Planning and Zoning Board hearing:
Plan revisions are due no later than the end of the day of Wednesday, August 7,
1996. Please contact me for the number of folded revisions required for each
document.
PMT's. (photo reduction of site Plan, Landscape Plan, Building Elevations to 8.5"
x 11"), rendering (one each colored full-size Site or Landscape Plan and Building
Elevations), and 8 folded copies of the final full-size Site Plan, Landscape Plan,.
and Building elevations revisions ( for the Planning.and Zoning Board members
packets) are due on August 19, 1996.
Please contact me at 221-6750 if you have questions or concerns related to these
comments. I would like to schedule a meeting with you as soon as possible, if
necessary, to discuss these comments.
Si cerely,
*tv lt
Project Planner
xc: Kerrie Ashbeck
Stormwater Utility
.Transportation
Natural Resources
Project File
Comm ity Planning and Environmenta ervices
Current Planning
August 5, 1996
Jim Sell
Jim Sell Design
117 East Mountain Avenue
Fort Collins, CO. 80524
Dear Jim,
Copies of comments on the revised Hearthfire PUD, Preliminary documents that were
submitted to the City on July 19, 1996, have been received from the following City
departments and outside reviewing agencies and are being. forwarded to you under this
letter:
Boxelder Sanitation District
East Larimer County Water District
- with attached copy of a recorded Deed
with attached redlined utility plans
Natural Resources Division
Water Conservation (Water Department)
- with attached information sheet
Public Service Company
These comments are in addition to comments forwarded to you on Friday, August 2,
1996, from the following City department and outside reviewing agencies:
Engineering - Pavement
Zoning Department
Building Inspection Department
Police Department
Poudre Fire Authority
Environmental Planner (Brian Woodruff)
Light & Power Department
". Post. Office
Park Planner
" Streets Department
There are still unanswered concerns about the off -site street improvements (possibly
necessitating variances) associated with.this development, the overall density of this
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 • TDD (970) 224-6002