Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD - RESUBMITTED PRELIMINARY (REMAND FROM CITY COUNCIL) - 31-95C - CORRESPONDENCE -development relative to current City policies, and the relationship of some lots to the existing, operating oil well. Project Notes 8 and 9 on the Site& Landscape.Plan would indicate that Lots 73, 107, 108, and 110.have areas outside of the minimum 150, separation distance that are.buildable and that a building permit can be issued. on Lot 109 when the "150' setback restriction is removed". The buildable areas are questionable and what all triggers the setback restriction to be removed? At this point in time Larimer County has concerns about a single point of access into. this development. Both the City. and County want information on how many lots can be built and occupied before a second point of: access is provided. This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the August 26, 1996 Planning and Zoning Board hearing: Plan revisions are due no later than the end of the day of Wednesday, August 7, 1996. Please contact me for the number of folded revisions required for each document. PMT's. (photo reduction of site Plan, Landscape Plan, Building Elevations to 8.5" x 11"), rendering (one each colored full-size Site or Landscape Plan and Building Elevations), and 8 folded copies of the final full-size Site Plan, Landscape Plan,. and Building elevations revisions ( for the Planning.and Zoning Board members packets) are due on August 19, 1996. Please contact me at 221-6750 if you have questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Si cerely, *tv lt Project Planner xc: Kerrie Ashbeck Stormwater Utility .Transportation Natural Resources Project File Comm ity Planning and Environmenta ervices Current Planning August 5, 1996 Jim Sell Jim Sell Design 117 East Mountain Avenue Fort Collins, CO. 80524 Dear Jim, Copies of comments on the revised Hearthfire PUD, Preliminary documents that were submitted to the City on July 19, 1996, have been received from the following City departments and outside reviewing agencies and are being. forwarded to you under this letter: Boxelder Sanitation District East Larimer County Water District - with attached copy of a recorded Deed with attached redlined utility plans Natural Resources Division Water Conservation (Water Department) - with attached information sheet Public Service Company These comments are in addition to comments forwarded to you on Friday, August 2, 1996, from the following City department and outside reviewing agencies: Engineering - Pavement Zoning Department Building Inspection Department Police Department Poudre Fire Authority Environmental Planner (Brian Woodruff) Light & Power Department ". Post. Office Park Planner " Streets Department There are still unanswered concerns about the off -site street improvements (possibly necessitating variances) associated with.this development, the overall density of this 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 FAX (970) 221-6378 • TDD (970) 224-6002