Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, SECOND FILING - PRELIMINARY / FINAL - 32-95F - CORRESPONDENCE - REVISIONS (3),! Nuff 45600ATL6. INC. ELECTRICAL ENGINEERS August 11, 2000 Louise Herbert VF Ripley 401 W. Mountain Avenue Suite 201 Ft. Collins, CO 80521 RE:, RegistryRidge 2nd,Filing Job No. #0007 ZONAALP J McNuTT = P.E. Dear Ms. Herbert: Please see the following comments in reference to,y6ur,8/9/00 fax regarding the responses of the planning department. Lighting photometric calculations were not included under the gasoline canopy. of the proposed development area as'ihis area.shall be considered'fhe future"tenants responsibility. Calculations were completed for this filing as atypical ,coffimerci al area. Future tenants shall provide, additional lighting under canopy maccordance with the City's standards, and include lighting contributions from the current proposed filing. The City of Ft. Collins requires that lighting levels shall not exceed 10 foot candles at any point. Typically, gas stations propose 70 - 80 footcandles of light under their canopy for security reasons and to make reading of pump instructions clear.: Special exceptions,,for items such as this shall be requested by future tenant to the planning department. `Respectfully, Kate Hodgson KH/slw 00071i.x-i i-ou.wlxl C,2EELEY (970) 330-5266 5587 V. 19th STP-LLT "' •, DENVER (303) 654-1441 ,CREELEY. COLORADO 80634 ` ` = FAX (970) 330-3667 e-mail: rjmcnutt@concentHc.net '"� FT. COLLIN-5 (970) 686-5678 Lighting Plan redlines: a) Sheet 2 of 2 — C-store light levels under the pump canopy. Please see attached letter from RJ McNutt and Associates, Inc. Please call if you have any questions regarding the above. Thank you for your consideration and we look forward to working with you during the development review process. Sincerely VF Ripley Associates TST, Inc. Consulting Engineers Louise Herbert Sharlene A. Shadowen, P.E. ` Eneineerine• 9) The circles at the end of the enhanced drives north and south of the recreational open space area are pedestrian areas. 10) Emergency access drives removed 11) Parking to the c-store / retail area has been revised to accommodate the required 50' setback for parking spaces from streets. 12) See revised plat. 13) Coordinate with Fire and Engineering has resolved this issue. 14) See engineering response above under site plan item 6). Stormwater Utility: 15) See revised plat. 16) A note has been added that all existing easements will be vacated with the plat. 17) Storm sewers have been revised too minimize conflicts with buildings and clearances. 18) Developer is responsible for storm sewers within tracts. See note 2 on plat. 19) Point noted; however, we believe it would not be the best alternative for this site. Natural Resources: 20) Grading plan does show drainage improvements (swales, pipes, inlets, etc.) Plannine' 21) The emergency access drives north and south of the open space area will be scored concrete. The pedestrian circles at the ends will be stamped tan colored concrete. 22) The residential units will have some variation in materials and colors. 23) Additional red -line comments: Site Plan redlines: a) The `loading / parking areas' are for emergency vehicular maneuvering. See engineering response above. Plat: 1) Sight distance notes have been added to the sight plan. 2) Done 3) A note on the plat cover states that all existing easements are to be vacated with this plat. 4) See #3 5) See #3 6) We have provided a blanket easement and have coordinated with utilities to address all issues. 7) Building envelopes have been revised. 8) Have provided a blanket emergency access easement. This has been accepted by the Fire Department and Engineering Department. Site Plan: 1) The `loading zone' is an emergency access vehicle maneuvering area. All emergency access areas will have painted curb and posted signs. (see emergency access plan). 2) Drain water to driveways is shown as per the utility plans. 3) See comment #5 under utility plans above. 4) See comment #9 under utility plan above. 5) Revised. Site plan updated. 6) Plan labeling has been enlarged to make the plan more legible. 7) Storm water (separate comment sheet): 1) The overlap was corrected. The vacated easements were not shown per Sheri (Engineering) and John VonNieda (TST). A note was added to the plat indicating any easements not shown or specifically mentioned were vacated with this plat. 2) Done. 3) Added discussion. 4) Same as A -A. 5) Detail was provided on Sheet 12. 8) Technical Services ( Mapping / Drafting Department): a) Storm Water Department requesting specific easement for Storm Drainage purposes. b) Noted. 5) Zoning Department: a) Handicapped ramps are shown where sidewalks meet the enhanced crosswalk b) Residential trash enclosures 10' x 12' are sized to accommodate 2 dumpsters ( for trash and recyclables). c) Plant note # 4 wording has been changed to read " value of landscaping and installation". d) Acknowledged. Note # 14 has been adjusted. The site plan note on trash enclosure gates has been changed to say "all trash enclosures will be gated'. e) Elevation sheets have been identified as residential elevation on sheet 4 of 8. 6) Engineering (separate comment sheet): 11 Utility Plans: 1) Done 2) Done 3) All utility stubs shown as existing are being installed as part of phase 1 & 3, prior to final lift of paving being laid. A revised utility plan is being coordinated with the FCLWD & SFCSD. 4) Done 5) Parking to the c-store / retail area has been revised to the required 50' setback for parking spaces from streets. 6) Done 7) Done 8) Done 9) Removed driveway cuts at emergency access drives. 10) Done 11) Driveway Revised. 12) Done 13) Done 14) Done - .G September 5, 2000 Steve Olt Fort Collins Planning Department 281 North College Avenue Fort Collins, CO 80524 Be: Response to staff letter Registry Ridge PUD, Second Filing — Preliminary and Final Dear Steve: We have reviewed the staff letter dated July 10,2000 and have the following comments: 1) Public Service Company (New Century Energies): a) See revised utility plan regarding revised utility layouts including shallow utilities. b) All trees have been checked with utilities. See revised landscape plan. c) See revised utility plan. d) See revised utility plan. e) The water meter pits are located with a min 4' clearance from gas lines. See revised utility plan. 2) Fort Collins- Loveland Water District and South Fort Collins Sanitation District: See separate response letter. 3) Thompson School District R2-J: Acknowledged. 4) Traffic Operations: All crosswalks are shown as painted, striped crosswalks.