Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, SECOND FILING - PRELIMINARY / FINAL - 32-95F - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: 1 I I G�� ZVl GI Planner: — Engineer: Trafic Operations: i Date: Itemi Requeited Sits Land Plat Utility I Drainage Rpt Other Items Beg uired Engineering Stormwater x X x x r" 0 o, Sep) Redlined Items Being Returned Site I Land I Plat Utility Drainage R t Other Items Being Returned � �I irafDc Operationt Trani. Planning Natural Rewurcei �G/nn Park Planning Totali A- 3 Other: Note: All redlined items should be returned with the reiubmittal/ reviiioni. tkW� 5e� r Revisions Routing Sheet Item:I ` 1. ��►' � A •1 FTLE: PROJECT PLANNER— WNW Mw 1 1 M-04W MMIM BUILDING . -.--..--�-.-- POWER WIN MMIM ADVANCEIN ��� •��������� iiiWATER ii�������� R.O.W. PLANNING CONSERVATION PUBLIC SERVICE STATE HIGHWAY DEPARTMENT 7 ON MMM M DITCH COMpANy RAILROAD: UP or BN/CS REA/DOE/PRPA No NO ON MMM iiMi ON moms �mumiiiiiiii� �m®mMMMMMMI �O®MM®MMON •TtiY 6'i MMMMMIM