Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - CORRESPONDENCE - CITY STAFFSincerely, and Design LLC Manager cc: Tom Kennedy, Bill Yunker, Lucia Liley, Brian Shear, Hearthfire 2 Submittal tri IECRIEST February 7, 2001 Mr. Steve Olt City of Fort Collins Planning Department P.O. Box 580 281 N. College Ave Fort Collins, Colorado 80522-0580 RE: Hearthfire P.U.D., 2°d Filing, Final, #31-95E Resubmittal - Response Letter Dear Steve: Enclosed please find five (5) copies of the revised Final Site and Landscape Plan as well as seven (7) copies of the revised Final Utility Plans as prepared by Shear Engineering Corporation, one (1) copy of the revised Drainage Report, and five (5) copies of the revised Final Plat as prepared by Fredrick Land Surveying for the Hearthfire P.U.D., Second Filing, Final. (As well as the redlined prints from your last set of referral comments.) Note: also attached is one (1) copy of the engineering response letter from Shear Engineering Corporation and the Revisions Routing Sheet from Current Planning. Based upon your last letter of November 15, 2000, we have tried to resolve most of the outstanding issues with each individual department. Although I have talked to and met with several of the individuals who still had comments related to the last submittal, letters and revised plans were sent directly to each department and individual to address their concerns. I've attached copies of each of these letters for your review and files. Also, for your information, Shear Engineering is working directly with the ELCO Water District on completing their revisions to the water distribution system (part of the Final Utility Plans) and we have been working directly with Bill Fischer, Paul Eckman, Lucia Liley, and Glen Schlutter on the preparation of the required offsite drainage easements. We understand that these offsite easements must be completed and signed prior to the Planning and Zoning Board hearing. One outstanding item was a comment from Sherri Wamhoff in Engineering related to the I' Filing. On her red -lined print she requested that the two retaining walls to the east of lot 33 be shown on the Final Site and Landscape Plan for the 2°d Filing. Her comment also stated that a Minor Amendment to the l91 Filing may be required do to the fact that these walls were not shown on the Final Site and Landscape Plan for the I" Filing. I discussed this item with her and she felt that it was your decision as to if the Minor Amendment would be required. Please review this comment with Sherri and give me a call to let me know the outcome. If the Minor Amendment is required, we will prepare the documents as soon as possible and submit them for your review. Hopefully this addresses all of the outstanding issues related to the submittal. Please review the enclosed information and should you have any questions, feel free to give me a call. Plant"ing S DeMS" LLC 4225 Westshore Way Fort Collins, CO 80525 (970) 226-1655 • (970) 226-1635 tax