HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUND OF REVIEW 9 - 31-95E - CORRESPONDENCE - CITY STAFF (3)Project No: 1552-02-97 January 18, 2001
Re: Hearthtire P.U.D., Second Filing; Ft. Collins, Colorado
Responses to Comments Dated October 26, 2002
STORMWATER UTILITY
1. Please remember that the pending easements included with this submittal must be in final
form and signed before a final hearing on this project can be given.
R Acknowledged.
We trust that this response has addressed a majority of staffs most recent specific comments and
concerns. If you have any further questions, please call at (970) 226-5334.
Sincerely,
Michael Rohlfs
Shear Engineering Corporation
cc: Tom Kennedy; Hearthfire, Inc.
Tom Dugan; PineCrest Planning and Design
Sheri Wamhoff, City of Fort Collins Engineering
City of Fort Collins Technical Services
Ward Stanford; City of Fort Collins Traffic
Wes Lamarque; City of Fort Collins Stormwater Utility
Lucia Liley, March, Liley & Olive, P.C.
Page 3
Project No: 1552-02-97 January 18, 2001
Re: Hearthfire P.U.D., Second Filing; Ft. Collins, Colorado
Responses to Comments Dated October 26, 2002
STORMWATER
2. The affected ditch company's approval and signature block must be provided on the
applicable plans.
R A signature block has been added to all applicable sheets as requested.
TECHNICAL SERVICES (MAPPING) DEPARTMENT
5. On the Final Plat, please remove all of the Revision Notes.
R Acknowledged.
6. The Vested Rights Statement in not needed
R Acknowledged.
NEW COMMENTS
ENGINEERING
25. This project will also not be taken to hearing until the plans for Douglas Road are completed
and approved.
R See response regarding this item above.
26. Need to have whiting petroleum signature on this sheet and all other applicable sheets —
wherever work is shown within their easements.
R See response regarding this item above.
27. Need to update sheet 22 — County Rd 13 on what proposed construction and what is existing
road. Show the portion that is designed, but is not being constructed as being future.
R Existing conditions and proposed construction improvements have been corrected and
clarified. Future construction, and limits of proposed construction have been clarified.
28. Sheet 15 — Pavement patching to be in accordance with the changes shown.
R The detail has been modified as per the redlines. A legend has also been added as requested.
Page 2
January 18, 2002 rENGINEERING
11
Project No: 1552-02-97
City of Fort Collins Planning Department
P.O. Box 580
Ft. Collins, Colorado 80524
Attn: Steve Olt
Re: Hearthfire P.U.D., Second Filing; Ft. Collins, Colorado
Responses to Comments Dated October 26, 2001
Dear Mr. Olt:
This is a response to staff s most recent review comments concerning the Final Utility Plans and
Final Plat for Hearthfire P.U.D., Second Filing, dated 10/26/01.
COMMENTS FROM JUNE 27TH
ENGINEERING
1. The big thing is still the required easements.
easements.
The City has not yet received the final, signed
R Easement preparation is being coordinated with the developer's attorney, Lucia A. Liley of
March, Liley & Olive, P.C. Please refer to Ms. Liley's response to this comment. Updated
easement packages are being provided with this re -submittal. Additionally, please refer to
responses provided PineCrest Planning and Design, LLC for all plat related comments.
2. The required Douglas Road improvements plans are not complete enough to schedule this
item for public hearing. Some easements are still needed
R The utility plans now include required easements. Please refer to comment response above.
3. There is "stuff" on Lot 48 of Filing One that affects this filing.
R A 5-foot Permanent Access and Maintenance Easement will be dedicated by separate
document on Lot 48 of the First Filing, and is noted on the plans to this effect. A 15-foot
Temporary Construction Easement will be dedicated by separate document on the adjacent
Tract K. This is also noted on the plans to this effect.
4. Whiting Petroleum must sign these development plans.
R A signature block had previously been provided for Whiting Petroleum approval on the
cover sheet on the utility plans. A signature block has been added to other applicable sheets.
4836 S. College, Suite 12 Ft. Collins, CO 80525 (970) 226-5334 Fax (970) 282-0311 www.shearengineering.com