HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUND OF REVIEW 9 - 31-95E - CORRESPONDENCE - CITY STAFFJ - - 18- 12 08: 11A
REVISION ROUTING SHEET
1 EM: -1 3!•
N
zw
wZ
�w
Zz
o
"..
LrE RE avED:
<
x c
z o
in
z�
CA
W o
F a
Qw�f
E_: PR: )ECT PLANNER
2 NING
B ILDIN: INSPECTION
F ;.ESTF: j
P _ICE _ORI DIGLIANI
A ti'ANCI: PLANNING
S IEETS
R ).W. PI_ MING
Vl _'ER C NSERVATION
����P :T OF: CE
'NEST_
P1 3LIC s RVICE
IS JOW': POUDRE THOMPSON
A' EL T D _ ;ITAL CABLE
C _,T
D c:H Ct: PANY 1
n at _� {�`�n e w- I P B*&F t- l /—
n 1/V
R + TOE, 'RPA
N. _JRAL 'ESOURCES
P/ . < PLA NING
I <�*
26. An agreement between the Developer and Water Supply and Storage for the area
by Tract C was prepared and signed with the First Filing. A copy of this document is
included in this submittal and all grading work in this area was completed with the
construction of the First Filing.
27. March, Liley & Olive has prepared an assignment of this easement to the City
and a copy is included in this submittal.
28. Item noted.
29. Item noted.
30. Item noted.
4. Stormwater Utility
1. Item noted.
Hopefully this addresses all of the outstanding issues related to the submittal. Please review the
enclosed information and should you have any questions, feel free to give me a call.
Sincerely,
PineCr lanning and Design LLC
J
t
J� gan
j ana er
Enclosures
Cc: Tom Kennedy, Bill Yunker, Lucia Liley, Brian Shear, Hearthfire 2 Submittal
21. (1) - March, Liley & Olive is addressing all of the easements issues and copies of
most of these documents are included in this Resubmittal.
(2) - Item noted.
(3) - I believe that the "stuff' on Lot 48 refers to the retaining wall and grading to
the west of this lot. The engineering plans have been revised to show the design of
this wall and a grading and maintenance easement is being submitted by March,
Liley & Olive for Lot 48 and Tract K.
(4) - Item noted and once all approvals are granted, we will have the oil
company sign all needed plans.
(5) - March, Liley & Olive is addressing all of the easements issues and copies
of most of these documents are included in this Resubmittal.
2. Natural Resources
1. 1 have contacted Doug Moore and he stated that he has no outstanding issues.
3. Technical Services
22. (b) — Note that this item was resolved with the last submittal as follows: Town
Center Way has been changed to Turnstone Lane and this was approved by Current
Planning on July 26, 2001.
22. (c) - The North County Road 13 annexation request was submitted to the City by
March, Liley & Olive, P.C. on December 12, 2001 for the City's action and approval
of the annexation. With the submittal of the annexation request, this relieves the
developer from any further obligations related to the annexation of CR 13. Also, all
notations on the related to this annexation have been removed from the Site and
Landscape Plan.
22. (d) Again, this item was addressed with our last submittal as follows: Lot 1 has a
restriction that any home must be a minimum of 150' from any existing oil well. The
setbacks shown for this lot conform to this 150' requirement.
3. Engineering
8. Item noted.
24. Item noted and drafts and/or final signed easements have been provided to the
City by March, Liley & Olive for all outstanding easements.
24. (1) The ROW dedication for CR 13 has been dedicated to the County by the
Developer. Copies were sent to the City by March, Liley & Olive on November 8,
2001 and recorded by the County on December 28, 2001. (Copies are included with
this submittal).
24. (2) The utility easement for CR 13 has been dedicated to the County by the
Developer. Copies were sent to the City by March, Liley & Olive on November 8,
2001 and recorded by the County on December 28, 2001. (Copies are included with
this submittal).
24. (4) Item noted.
24. (5) The engineering plans have been revised to show the design of this wall and a
access and maintenance easement is being submitted by March, Liley & Olive for
Lot 48.
25. As stated above, the utility easement for CR 13 has been dedicated to the County
by the Developer. Copies were sent to the City by March, Liley & Olive on
November 8, 2001 and recorded by the County on December 28, 2001.
Ir14EC1tEsT
January 18, 2002
Mr. Steve Olt
City of Fort Collins Planning Department
P.O. Box 580
281 N. College Ave
Fort Collins, Colorado 80522-0580
RE: Hearthfire P.U.D., 2nd Filing, Final, #31-95E
Resubmittal - Response Letter
Dear Steve:
Enclosed please find nine (9) copies of the revised Final Site and Landscape Plan as well as five
(5) copies of the revised Final Utility Plans as prepared by Shear Engineering Corporation, one
(1) copy of the revised Drainage Report, and seven (7) copies of the revised Final Plat as
prepared by Fredrick Land Surveying for the Hearthfire P.U.D., Second Filing, Final. (As well as
any redlined prints from your last set of referral comments.) Note: also attached is one (1) copy
of the Revisions Routing Sheet from Current Planning.
This is a response to the most recent review comments concerning the Final Site and Landscape
Plan, Final Utility Plans and Final Plat for the Hearthfire P.U.D., Second Filing. This response
will address some of the comments from the Current Planning, Natural Resources, Technical
Services, and Engineering, as noted in your letter and the Project Comment Sheets dated October
26, 2001. Also, for your information, Lucia Liley has been working directly with Bill Fischer and
Paul Eckman on the preparation of the required offsite drainage easements from the Water
Supply and Storage Company (see attached letter from Lucia Liley addressing all of the
outstanding easements issues and the annexation of the CR 13 ROW). We understand that these
offsite easements must be completed and signed prior to the Planning and Zoning Board hearing
as well as the issues regarding the final design of Douglas Road.
Current Planning
16. The note regarding this fence has been removed from the Site and Landscape
Plan.
18. The North County Road 13 annexation request was submitted to the City by
March, Liley & Olive, P.C. on December 12, 2001 for the City's action and approval
of the annexation. (A copy is included in this resubmittal.) With the submittal of the
annexation request, this relieves the developer from any further obligations related to
the annexation of CR 13. Also, all notations related to this annexation have been
removed from the Site and Landscape Plan.