HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUNDS 7, 8 & 9 STAFF COMMENTS - 31-95E - CORRESPONDENCE -n Department: Stormwater Utility Issue Contact: Wes Lamarque
1
1 lease remember that the pending easements included with this submittal must be in
final form and signed before a final hearing on this project can be given.
%Department: Transportation Planning Issue Contact: Mark Jackson
No furt r comments
Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this project,
please feel free to call me at (970) 221-6750.
Yours Truly,
STEVE OLT
City Planner
Page 3
26
Water Supply and Storage Property south of Tract C. An agreement can provide permission to enter
the property and do grading. The agreement needs to have language as being worked our by the City
and applicants attorneys.
27
The drainage easement on lot 47 that has been recorded - The assignment for this easement can
occur at any time since this was tied to the V tiling it can be processed once I receive it. The
only thing that needs to be added to the draft is the Grantors address. This is now being
required by the County. It can be provided under the grantors signature block.
28
All off site easements and /or row are needed signed and in the final format ready for filing are
needed prior to scheduling this project for hearing. Please note the dedication document needs
to include the grantees name and address.
29
This project will also not be taken to hearing until the plans for Douglas Road are completed
and approved.
31
Need to update sheet 22 - county rd 13 and Douglas road intersection construction needs to
reflect the pavement limits, which are the changes that need to be made on sheet 15.
32
Sheet 15 - Pavement patching to be in accordance with the changes shown. -These
changes have not been made yet.
Department: PFA Issue Contact: Michael Chavez
34
Water Supply - Fire hydrants are required with a maximum spacing of 800 on center along an approved roadway. Each
hydrant must be capable of delivering 1000 gallons of water per minute at a residual pressure of 20psi. In residential
applications no building can be greater then 400 feet from a fire hydrant. 97 UFC 901.2.2.2
35
Street Names - Street names shall be verified and reviewed by LETA and the City Planning Dept. prior to being put into
service. 97 UFC 901.4.5
37
Address Numerals - Address numerals shall be visible from the street fronting the property, and poster with a minimum
of 6-inch numerals on a contrasting background. 97 UFC 901.4.4
Page 2
r
STAFF PROJECT REVIEW
Citv of Fort Collin
Pinecrest Planning & Design Date: 6/19/2002
c/o Tom Duggan
4225 Westshore Way
FORT COLLINS CO 80525
Staff has reviewed your submittal for HEARTHFIRE PLID, 2ND FILING #31-95E, and we
offer the following comments:
.ISSUES: ;
Department: Engineering Issue Contact: Sheri Wamhoff
jv(8
Plat
Provide reception #'s for existing/off site easements that do not have them listed yet
Jwhen these are obtained.
24
• All off site easements and/or row are needed prior to scheduling of this project for a final hearing.
EASEMENTS and ROW needed - All drainage easements need to be dedicated to the City it
is not acceptable for these to be dedicated to Hearthfire as we have no control over the
easements or guarantee that they will be permanently retained.
I ) row for CR13 - to be dedicated to the county - done
2) Utility easement adjacent to CR13 - to be dedicated to the county. - done
2A) Slope and drainage easement at comer of CR13 and Douglas Road - draft provided, language
as proposed acceptable to the City, this easement needs to be recorded with the County. Please
provide a recorded copy upon recordation.
3) Grading easement east of tract E and north of Hearthfire Drive. Even if this property owner of
this tract is Hearthfire Inc we still need a grading easement as they could sell the property
tomorrow and the new property owner could not allow the grading. - Draft provided. This
easement needs to be dedicated to the City of Fort Collins to guarantee that the easement
will exist for who ever will do the grading. See comments on Draft language, also will need
to provide attorney certification on this document.
4) Grading easement as well as drainage easement on the Water Supply and Storage Property south
of the southwest corner of the site. This is being worked out with the attorneys' office. - Need to
see this and it be acceptable prior to scheduling a hearing.
5) Construction easement for construction of the retaining wall on Tract K. - All construction
easements need to be dedicated to the City of Fort Collins. See comments on Draft
language, also will need to provide attorney certification on this document.
Maintenance Easement for retaining wall on Lot 48 - This easement looks fine. It needs to be
recorded by the applicant with the County. Please provide a copy of the recorded document.
Since it is not an easement being accepted by the City the City does not process it.
25
Easements being dedicated to the county need to be submitted to the county for acceptance. I will
need indication from the county that they have been received prior to scheduling a hearing. - -