Thanks for the heads up. Steve and I have already talked about the wetlands. Their Wetlands Mitigation
Map address the condition. They are creating 2.22 acres of wetland as mitigation, their requirement was
for 2.10 acres.
Thanks,
Doug
>>> Basil Hamdan 9/3/02 11:28:57 AM >>>
Steve,
After reviewing the plans for the Hearthfire 2nd Filing, it is determined that water quality extenede
detention was provided by the 2nd Ring, thus meeting the preliminary condition of approval, in our
determination.
Basil
>>> Glen Schlueter 09/03/02 11:10AM >>>
I think Doug needs to confirm this from the wetland point of view. Basil or I will get back to you on the
water quality issue.
>>> Steve Olt 09/03/02 08:55AM >>>
Basil and Glen,
Attached is the staff report for the Hearthfire PUD, Second Filing that is going to the P&Z Board on
September 19th. On page 5 there is a condition of preliminary approval regarding storm drainage that may
or may not have been satisfied. I need to know ASAP so that I can finalize the report.
Thanks, Steve