Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUND OF REVIEW 11 - 31-95E - CORRESPONDENCE - (5)CIS teve Olt ire Fwd Basil and Glen Page I From: Doug Moore To: Basil Harridan; Glen Schlueter Date: 9/3/02 11:44AM Subject: Re: Fwd: Basil and Glen, Thanks for the heads up. Steve and I have already talked about the wetlands. Their Wetlands Mitigation Map address the condition. They are creating 2.22 acres of wetland as mitigation, their requirement was for 2.10 acres. Thanks, Doug >>> Basil Hamdan 9/3/02 11:28:57 AM >>> Steve, After reviewing the plans for the Hearthfire 2nd Filing, it is determined that water quality extenede detention was provided by the 2nd Ring, thus meeting the preliminary condition of approval, in our determination. Basil >>> Glen Schlueter 09/03/02 11:10AM >>> I think Doug needs to confirm this from the wetland point of view. Basil or I will get back to you on the water quality issue. >>> Steve Olt 09/03/02 08:55AM >>> Basil and Glen, Attached is the staff report for the Hearthfire PUD, Second Filing that is going to the P&Z Board on September 19th. On page 5 there is a condition of preliminary approval regarding storm drainage that may or may not have been satisfied. I need to know ASAP so that I can finalize the report. Thanks, Steve CC: Steve Olt