HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUTING SHEET ROUND 11 - 31-95E - CORRESPONDENCE - ROUTING SHEET.�
Project:-�ecLk4tI U „ti, _ L..%
Planner: `c �o nL4—
Inginetr: J .
00
Trams[ Operations:
Bate:
Items Requested
Site I [and Plat UtIllty I Drainage Rpt Other lttms Required
Redlined items Being Returned
Site I land I Plat I Utility Drainage R t Other Items Being Returned
4ntering
x
x Ie�sR
�
X.
itormwater
x
x
Water/Wastewate
—
—
—
Trafi[ Operations
Trans. Planning
Natural Room
—
—
—
Park Planning
TOM
Z
Other:
Note: All rtdlined items should be returned with the resub _ Ittal/ revislons.
t'leO� max- &yAe, t aim
May-20-02 01:30P
P_O1
r-�,�c I 2210 • tl� f� � rl
Revisions Routing Sheet - j2voLA
Item:
[# ]
2� _ nja,44,
y
Date:
}�.} a a C •. v o o �. `c
c as ti
�q�
f 4�Q cv` ti 4)L°4`
FILE: PROJECT PLANNER
F-NGINEERING: PAVEMENT
ZONING
BUILDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
X
FORESTRY
FCLSVD/ELCOBOXELDER
FIRE
POLICE
ADVANCE PLANNING
STREETS
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
US WEST
PUBLIC SERVICE
SCHOOLS: POUDRE /THOMPSON
CABLE TV
`/
STATE HIGHWAY DEPARTMENT
N
&
DITCH COMPANYG
oa
J
RAILROAD: UP or BN/CS
C
REA/DOE/PAPA
v
E
p
o
x
n
li
d
O
Z
x
LL
I
}I d 4
"1n OTAL
G)
4
Rev. 5-07-97