Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL ..... ROUTING SHEET ROUND 7 - 31-95E - CORRESPONDENCE - ROUTING SHEETProject: ,-1�-c��� e, ?L-� C) Planner: Engineer: Traffic Operations: iPr- ., Date: ''/ I -4-/cam Items Requested Site land Plat Utility I Drainage Rpt Other Items Required Engineering x x Redlined Items Being Returned Site land Plat I Utili Drainage R t Other Items Being Returned Stormwrater Water/Wastewrate x x x Traffic Operations Trans. Planning X X Transfort Natural Resources Park Planning I Jill Totals Gj � Other: Note: All rediined items should be returned with the resubmittai/ revisions. r r j t Revisions Routing Sheet, FvovA 07 1 . r FILE: PROJECT PLANNER ' • 1 -..-...-.-..- •, WIN IN WIN MAPPING/ DRAFrING IN • mm�� �WmADVANCE PLANNING m m WATER CONSERVATION m WIN m IN IN PUBLIC SERVICE m m WIN STATE HIGHWAY DEPARTMENT Nomm DITCH COMPANY No 0 REA/DOE/PRPA WON m mom ON mmmm No� mmmmmm� ®® mom IN