HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - CORRESPONDENCE - ROUTING SHEETProject: _P�` �� i �e�-�
% r
Planner: r-) Z vg
I C T Traffic Operations:
Engineer:
Items Requested
Redlined Items Being Returned
Site land
Plat Utility I Drainage Rpt Other Items Required
Site I landI Plat Utility Drainage R t Other Items Being Returned
-
Engineering 'Ah
t
Stormwater
Water/Wastewate
TraflicOperations
.X
=
x
Trans. Planning
x
�.
Tramsfort
Natural Resources
Park Planning
Totals
r2
`
Other:
Note: All redlined items should be returned with the rewbmittal/ revisions.
e;e4—;- mac. d-kP CA& 4q:s 4w4k
Revisions Routing Sheet i
• 11✓i ' ::u
i• ✓
�
M��r��
•
.-....----.--
0
MAPPING/ DRAFTING
1
mm
Mm
•
mm
mm
..--.--------
--.--.----.--
mmmmm
m
m
wiiiii
'C7 y❑6'i