Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - SUBMITTAL DOCUMENTS - ROUND 5 - ROUTING SHEETProject: Planner: Engineer: Datt Tralliic Operations: , '� 1 c Items Requested site land I Plat I Utility Drainage R t Other Items Required Engineering Redlined Items Being Returned Site I land Plat Utility Drainage R t Other Items Being Returned x. stormwater x X Water/Wastewater - Traffic Operations Trans. Planning x Tran*rt Natural Resources Park Planing Totals r j S. r Mote: All redlined items should be returned with the rembmittal/ rehsions. •• Revisions Routing Sheet 11 f • FILE: PROJECT PLANNER off • 1 1 1 .VAA-WON ...----.-- 0 ON ADVANCE PLANNING yet of R.O.W. PLANNING WIN WATER CONSERVATION m 0101.1 WIN -7 PUBLIC SERVICE IN 0 STATE HIGHWAY DEPARTMENT m WIN DITCH COMPANY OWN mmm RAILROAD: UP or BN/Cs OWN m No Now Nommmmmm wommom� iiW1°�mmmmm ii � �mm�iiiiiimmm e�am���mmmmiim I i y7 I'7"16•