Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - SUBMITTAL DOCUMENTS - ROUND 4 - ROUTING SHEETI Project: Date: �z 5/9 9 Planner: Tragic Operations: .Engineer: Items Requested Site land Plat Utility Drainage Rpt Other Items Required Engineering os (7s 2 Redlined Items Being Returned Site land Plat Utility Drainage Rpt Other Items Being Returned IX Stormwater -Aa Traffic Operations Trans. Planning CA �«)n�{� 6/�— Transfort Natural Resources y� Park Planning Totals �j r Other: Note: All redlined items should be returnel with the resubmittal/ revisions. Revisions Routin Item: g Sheet--f�� 4.,. ,. r'W l/�!!l1AS •� o �, BAge, po� yC a o~r f� )o 4; pi 'C4 0 Z FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRAFTING FORESTRY " FIRE POLICE ADVANCE PLANNIN STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE/THOMPSON CABLE TV STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS R�jE.A�/DOE/PRPA �. Kl1JA 11 f) TOTAL r _ 1 Rex 5-07.97 NUu�X+C $6 C6 Gu Wk4,,, I -� 1