Loading...
HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: Planner: Engineer: 5 U`e� c) ► 1ra>�c Operations: - Date: L�r Items Requested Site I land Plat Utility Drainage Rpt Other Items Required Redlined Items Being Returned Site land Plat Utility Drainage Rpt Other Items Being Returned Engineering �� k tormwater X Water/Wastewater Traffic Operations Trans. Planning x Transfort flatural Resources Park Planning Totals r Other: Note: All redlined items should be returned with the resubmittal/ revisions. M Revisions Routing Sheet A Item: i I II i Date: ► qq FILE: PROJECT PLANNER ENGINEERING: PAVEMENT • �--��..-.---- BUILDING INSPECTION • MV1W�FAVA. MMOMMMM MAPPING DRAFFING MMOOMMMMMMMM OMMMOMMMMMMM R.O.W. PLANNING WATER CONSERVATION .• lal MENMMMWWMNMM0 WOMMMMMMMMMM STATE HIGHWAY DEPARTMENT MMMMOMMM mmo IA iiiiiiiiiiiim Rev. 5.07-97