HomeMy WebLinkAboutHEARTHFIRE PUD, 2ND FILING - FINAL - 31-95E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject:
Planner:
Engineer:
5 U`e� c) ► 1ra>�c Operations: -
Date: L�r
Items Requested
Site I land Plat Utility Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
��
k
tormwater
X
Water/Wastewater
Traffic Operations
Trans. Planning
x
Transfort
flatural Resources
Park Planning
Totals
r
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
M
Revisions Routing Sheet A
Item:
i
I
II i
Date: ► qq
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
•
�--��..-.----
BUILDING INSPECTION
•
MV1W�FAVA.
MMOMMMM
MAPPING DRAFFING
MMOOMMMMMMMM
OMMMOMMMMMMM
R.O.W. PLANNING
WATER CONSERVATION
.• lal
MENMMMWWMNMM0
WOMMMMMMMMMM
STATE HIGHWAY DEPARTMENT
MMMMOMMM
mmo
IA
iiiiiiiiiiiim
Rev. 5.07-97