HomeMy WebLinkAboutHEARTHFIRE (HOFFMAN) - OVERALL DEVELOPMENT PLAN - 31-95 - CORRESPONDENCE - REVISIONS (3)Please do not hesitate to contact me with any questions or comments regarding this
correspondence.
Sincerely,
TNA.
CO ANY
, P.E.
Sell, Jim Sell Design
Mr. Bill Yunker
Mr. Craig Hash.. .
Preliminary P.U.D.:
2. This has been addressed on the Preliminary Plat.
5. Engineering Comments
1. We do not know at this point in time if subdrains will be used. If so, a hydrologic
study will be performed.
2.. Updated soils report has been included in this submittal.
4. Entrances to Tract D will be private and will be located at a later date.
5. This entrance will also be private.
10. Addressed.
11. Addressed.
12. Addressed.
13. Addressed.
...14. Addressed.
15. Addressed.
16. Addressed.
18. Addressed.
19. Addressed.
6. Noted.
7. Noted.
8. Noted.
9. We are continuing to work with the Natural Resources Division regarding proposed wetland
impacts.
12. The emergency access is shown on the Preliminary Plat.
July 1.7,1995 Letter
Overall. Development Plan:
1. Noted.
Preliminary P.U.D.:
1. PSCo Comments
a. Addressed on the Preliminary Plat.
b. Addressed.
c. Noted.
2. Easement concerns raised by Columbine CableVision have been addressed on the
Preliminary Plat
6. As stated previously, research regarding the wetlands and associated hydrology is continuing.
Please be assured that all final design elements will consider subsurface conditions on the site.
Water Supply and Storage Co. has been contacted regarding this project.
1:180 MERRICK
❑❑❑ Engineers 6 Architects
Merrick & Company
Mail: PO Box 22026 / Denver, CO / B0222 / USA
Delivery: 2450 S. Petrie St. / Aurora, CO / BOO14
..................
303/751-0741 / Fax 303f751-2581
September 6, 1995
The City of Ft. Collins
Community Planning and Environmental Services
281 N. College Ave.
Ft. Collins, CO 80522-0580
Attn: Mr. Steve Olt, Project Planner
SUBJECT: _. HOFFMAN P.U.D. PRELIMINARY PLAN
Mr. Olt:
The following is a list of responses to comments received from your office subsequent to the
first submittal for the subject project. We have addressed all comments relative to the
engineering design of the project. Comments related to other aspects of the project will be
addressed by Jim Sell Design in a separate document.
July 12,1995 Letter
Overall Development Plan:
1. ELCO Water District Comments
1. Easement is shown as part of Tract T. This will be used as landscape buffer and tank
access.
2. This extension will be incorporated in the final engineering plans for the project.
3. This problem has been addressed in the Preliminary Drainage Report.
4. This has been addressed on the Overall Utility Plan.
2. Light and Power Department Comments
5. Noted.
6. All lot dimensions and curve data will be detailed on the Final Plat.
4. Larimer County Engineering Continents
1. Noted.
2. We believe that the traffic impact study does address the impact of traffic on the
intersection noted in this comment.
With regard to suggested site distance and inadequate infrastructure, the developer
has agreed to make the necessary improvements to the
Inverness/Abbotsford/Gregory corridor.
5. Yes, County road right of way was included in the annexation.
............................................
An Employee -Owned Company