HomeMy WebLinkAboutREGISTRY RIDGE PUD, PHASE I - PRELIMINARY ..... MARCH 20, 1995 CONCEPTUAL REVIEW - 32-95A - CORRESPONDENCE -10. A letter of interest from the Thompson Valley School District
should be submitted with the development proposal if a school
site is to be shown as part of this development.
11. The Natural Resources Department has indicated that an Army
Corps. of Engineers 404 permit may be required in conjunction
with the wetland areas on -site. The boundary of the wetlands
area should be surveyed and staked to determine the size of
the area. Adequate transition zones between the wetlands and
proposed developed areas. There is a known prairie dog colony
.located on the property east of Shields Street. A Burrowing
Owl survey will be required.
12. The Planning Department's comments are as follows:
a. Lots which are along arterial streets need to be
buffered.
b. Due to the phasing criteria, it appears that off -site
open space dedication in the only way a minimum of 60
points can be achieved on the residential point chart of
the L.D.G.S.
C. The density calculations which were shown at Conceptual
Review are incorrect. Only commercial/industrial areas
may be subtracted out of the gross acreage.
d. An overall development plan will be required for this
development if it is developed in phases. This O.D.P
would need to reference the removal or amendment of the
property on the east side of Shields Street.from the Del
Webb O.D.P.
13. A neighborhood meeting will be required for this proposal and
must be held prior to a formal submittal of a development
review request to the City. This meeting has been scheduled
for Thursday April 13, 1995 at Werner Elementary School from
7 to 9 p.m. Mike Ludwig will be your City project planner
working with this proposal. .
l
e
C. This development will be responsible for off -site street
improvements (minimum of 36' width) on South Shields
Street and/or Trilby Road to the nearest arterial street
per City Code. The traffic study analysis which is
required by the Transportation Department will determine
the extent of the necessary improvements. Also, your
phasing plan will be a factor in the location and timing
of the improvements.
d. The City's standard local street width is 361; however,
28' wide streets are allowed in certain instances if
approved by Engineering. The street design used in the
Indian Hills P.U.D. would be a reference.
e. Off-street "clustered" parking could be provided in areas
where the narrower, 28' wide streets are proposed. This
parking should be 90 degrees to the street and must be
adequately distributed, not concentrated, to provide
sufficient guest/overflow parking for all lots.
f. This development may not qualify for street oversizing or
off -site improvement due to its "leap -frog" nature,
meaning it is not contiguous to any existing urban
development. Please contact Matt Baker of the
Engineering. Department at 221-6605 if you have any
questions about the status of this concern.
g. There are currently no standards for round-abouts as
proposed in this development. The Engineering and
Transportation Departments would need to evaluate the
design and how it addresses safety for bicyclists.
h. Stamped concrete will not be allowed and drainage must
follow the curb and gutter.
Please contact Mike Herzig or Kerrie Ashbeck if you.have
general engineering questions at 221-6750.
8. A full traffic impact analysis will be required for this
project. Off -site street improvements will be based upon this
report. Future access to surrounding properties to'the west
should be -provided with this development. Please meet with
Tom Vosburg of the Transportation Department to discuss the
design of the street heiracrhy for this development as well'as
pedestrian connections and the use of open ended cul-de-sacs.
9. The Fort Collins -Loveland Corridor Study process has
identified the .5 acre and 1 acre lot area as well as the
property east of Shields Street as open space. Please contact
Clark Mapes of the Planning Department at 221-6376 or Tom
Shoemaker of the Natural Resources Department at 221-6600 to
discuss the status of this plan.
d. Multi -family structures of 15 units or more are required
to be fire sprinklered.
3. There is overhead power along the railroad tracks on the
portion of the property which is east of Shields Street.
Power will be installed underground for new development.
Normal electric development charges will be applicable. An
access system must be designed if the first phase of
development is in an area other than adjacent to the railroad
tracks. Please coordinate your electrical design with the
Water and Sewer Districts before water and sewer facilities
are installed as the Districts due to the sharing of trenches.
4. The Parks Department is in the process of updating its Master
Plan. The south/southwest part of Fort Collins does not have
the needed density to develop a traditional park of 10-15
acres. This area also has significant areas of open space.
If no school site is developed as a part of this project the
Parks Department would most likely only consider creating a
neighborhood playground. The Parkland Development Fee is
currently $779 per dwelling unit. A 3%-5% increase is
proposed in April or May of this year.
5. Water services will be provided by the Fort Collins -Loveland
Water District and sanitary sewer services will be provided by
the South Fort Collins Sanitation District. See Comment 3
regarding electrical service design coordination.
6. This property is in the Fossil Creek Storm Drainage Basin.
The stormwater development fees in this basin are $2,274 per
acre, based on the runoff coefficient for the proposed land
use. The fees can be reduced if on -site detention is provided
and approved by the Stormwater Utility Department. On -site
detention is not required in this case but is encouraged for
water quality issues. It appears that out -fall will be a
major factor in this ,development. Please contact the
Stormwater Utility Department Floodplain Administrator to
discuss the Lang Gulch stability analysis and flood plain use
permits which will be required for this development. An
overall drainage plan is needed with this proposal and it
should refer to the Fossil Creek Overall Drainage Study that
has been done for this basin. The standard drainage report,
grading and drainage plans, and erosion control plans must be
part of your overall development plan and preliminary
submittals. Please contact Glen Schlueter 221-6589 if you
have any questions regarding Stormwater Utility requirements.
7. The Engineering Department's comments are as follows:
a. Standard utility plans are required at the time a
development proposal is submitted.
b. The street oversizing fee is $584 per dwelling unit and
$14,005 per acre for commercial/retail uses.
i
CONCEPTUAL REVIEW STAFF COMMENTS
Citv of Fort Collins
MEETING DATE:
ITEM:
March 20, 1995
DALCO P.U.D.
APPLICANT: Jim Sell
Jim Sell Design
117 East Mountain Avenue
Fort Collins, CO 80524
LAND USE DATA: Request for 751 single family and multi -family
residential units, a church site, school site,
park site, recreational center, naturalized
open space and a commercial site on
approximately 445 acres, located at the
southwest and southeast corners of South
Shields Street and Trilby Road.
COMMENTS:
1. The property is zoned rlp, Low Density Planned Residential
with a P.U.D. condition attached to it. The property is
located within the residential neighborhood sign district.
The portion of the property on the east side of Shields Street
is a part of the Del Webb O.D.P. (see comment 12).
2. The Poudre Fire Authority's comments are as follows:
a. Fire hydrants. are to be no more than 400' from all
structures and be able to deliver fire flows of 1,000
gallons per minute, with 20 pounds per square inch
residual pressure.
b. There is a 150' maximum distance requirement from a -place
where a fire truck can park to the first floor exterior
walls of all structures.
C. There is a 9001 maximum distance requirement from a
single point of access to any building or all buildings
beyond that distance must be provided with an automatic
fire sprinkler system. Another option would be to
provide an all weather secondary point of access for
emergency use only.
COMMUNITY PLANNING &
ENVIRONMENTAL SERVICES 281 NORTH COLLEGE P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
PLANNING DEPARTMENT
March 24, 1995
Jim Sell
Jim Sell Design
117 E. Mountain Avenue
Fort Collins, CO 80524
Dear Jim,
For your information, attached is a copy of the Staff's comments
concerning the request for the development of the DALCO PUD, which
was presented before the Conceptual Review Team on March 20, 1995.
The applicant proposes to develop 751 single family and multi-
family residential units, a church site, school site, park site,
recreational center, naturalized open space and a commercial site
on approximately 445 acres, located at the southwest and southeast
corners of South Shields Street and Trilby Road.
The comments are offered informally by Staff to assist you in
preparing the detailed components of the project application.
Modifications and additions to these comments may be made at the
time of formal review of this project.
If you should have any questions regarding these comments or the
next steps in the review process, please feel free to call me at
221-6206.
Sincerely,
Michael Ludwig
Project Planner
xc.: Stormwater Utility
Project Planner
File
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (303) 221-6750
FAX (303) 221-6378 TDD (303) 224-6002