Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, PHASE I - PRELIMINARY - 32-95A - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSJ as some issues with the site layout are resolved with the School District and the Parks Department. Stormwater indicated to us that they would like to have the revised report prior to the Hearing date. All other comments regarding onsite flows can be accommodated in final design. We also discussed with Kerrie Ashbeck the extent of the revisions to be resubmitted. She indicated that the revised site plans from Jim Sell would address the majority of Engineerings' concerns. She said that we will not need to resubmit a revised copy of the Preliminary Plat, or revised Preliminary Utility plans, other than those required to be resubmitted by Stormwater. Kerrie also indicated that a meeting should be set up with City Engineering regarding the proposed street rotaries. This will be set as soon as a revised site plan is developed. Other than that, all engineering issues can be addressed at time of Final Design. This should address all of the engineering related comments and concerns regarding the Registry Ridge ODP and Preliminary PUD. Response to other comments will be addressed and resubmitted by Northern Engineering or by others at a later date to insure a September hearing date. Please call if you have any questions regarding this letter. Sincerely, Roger'A. Curtiss P.E. cc: Jim McCory, Colorado Land Source Jim Sell, Jim Sell Design Kerrie Ashbeck, City of Fort Collins Basil Hamdan, City of Fort Collins Mike Bryant, Larimer County Terry Ferrill, Ft. Collins/Loveland Water District Lucia Liley, March and Myatt Northern Engineering Services, Inc. July 31, 1995 Mr. Michael Ludwig Community Planning and Environmental Services City of Fort Collins PO Box 580 281 North College Avenue Fort Collins, Colorado 80522-0580 RE: Registry Ridge Preliminary Response to City Comments Dear Michael, This letter is in response to the comments regarding engineering issues Northern Engineering Services Inc. (NES) received regarding the Registry Ridge CDP and Preliminary PUD. The applicant has requested to postpone the Planning and Zoning Board hearing on Registry Ridge from August 21, 1995 to the September meeting of the Board (letter Dated July 28, 1995 from Lucia Liley). I have reviewed comments regarding the onsite and off site utilities with Terry Ferrill from Fort Collins/Loveland Water and Sewer District. All of the comments and concerns that the District expressed with the preliminary submittal can be addressed at the time of final design. The off site sewer is currently being prepared and will be submitted to the District as a separate project. A copy of the letter from Elaine Spencer at Larimer County concerning Traffic issues has been forwarded to Matt Delich. Matt should respond to all of Elaine's concerns. NES is currently working on the arterial designs of South Shields Street and Trilby Road. These arterial roadway plans will be submitted to the City as a separate project, and at that time the plans will also be submitted to Larimer County for their review and approval. I met with City of Fort Collins Stormwater Utility to review their comments, and to determine the extent of our resubmittal package. Stormwater indicated that they would like us to resubmit our Preliminary Drainage and Erosion Control Study, as this will serve as a Master Plan for the Registry Ridge ODP. NES is prepared to revise this study, along with the Drainage and Erosion Control Plan (sheets 2 and 3 of 13) as soon 420 S. Howes, Suite 202 • Fort Collins, Colorado 80521 • (970) 221-4158 • Fax (970) 221-4159