HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - CORRESPONDENCE -Revisions Rout*n'
g Sheet
Item: r •--��-rl' ...ice► .� .....
911 Wei
ENGINEERING:
�-....----.a-
•
MwwMM
BUILDING I .
---LIGHT
-..----.--
& POWER
'7NU�PINGJ DRAFTING
•
•
ADVANCE PLANNING
• , PLANNING
•
•.
WATER CONSERVATION
.
_.._
.
S
• • •
•
.MM
•
1 •
_._
.._
HIGHWAYSTATE ••
DEPARTMENT
.
RAILROAD: UP or BN/CS
iiii��������s
Sincerely,
9
S eve Olt
Project Planner
xc: Engineering
Stormwater Utility
Transportation Planning
Traffic Operations
Natural Resources
Dalco Land, LLC
Northern Engineering Services, Inc.
Landstar Surveying, Inc.
Project File #32-95E
Y
Stormwater Utility (Basil Harridan)
7. The applicant has addressed City Staffs comments and concerns. This
development request is set to go to the Planning and Zoning Board for a
decision.
Planning
8. The necessary annexation (Trilby Heights Sixth) for the 35' to 40' wide
strip along the west line of this property has been approved by City
Council and is now complete. Therefore, this development request for
Final PUD approval is ready to go to the Planning and Zoning Board for a
decision.
This completes the staff comments at this time. Additional comments could be
forthcoming as they are received from City departments and outside reviewing
agencies.
City staff has determined that this development request is ready to be
scheduled for a Planning and Zoning Board hearing date for a decision. It is
being put on the October 19th Board agenda. However, the Fort Collins -
Loveland, Water and South Fort Collins Sanitation Districts comments are
significant enough to possibly warrant additional review. Please contact Terry
Farrill directly to discuss his concerns. Terry must contact me no later than
Wednesday, September 271h and inform me that it is acceptable to keep
this item on the October 19th Board agenda. The dates to submit necessary
items to Current Planning for the agenda are as follows:
• PMT's and Renderings due October 3rd
• 8 sets of full size plans (folded) due October 6th
If this item requires another round of review then it is subject to the 90 day
plan revision submittal time -frame mandated by the City. The 90 day
turnaround period begins on the date of the comment letter (September
20, 2000) prepared by the project planner in the Current Planning
Department.
Please contact me at 221-6341 if you have questions or concerns related to
these comments. I would like to schedule a meeting with you as soon as
possible, if necessary, to discuss these comments.
r
C. The sewer joint encasement detail is to be identified for the storm
water pipe.
d. The standard thrust block typical is to be corrected to indicate a
test pressure of 150 psi.
e. Pipe casing is required when the water line crosses under a facility
or structure that exceeds 36".
f. The District's details and typicals are required, all other water and
sanitary sewer typicals are to be deleted.
Please do not hesitate to contact Terry, at 226-3104 - ext. 14, if you have.
any questions or require additional information.
4. The following comments were received from Technical Services
(Mapping/ Drafting):
a. The annexation plat (Trilby Heights Sixth Annexation) for the
westerly 39'+/- of this subdivision plat needs to be filed before this
plat is recorded.
b. Street names need to be OK'd by E-911.
C. Original mylars to be filed must be of a good reproducible quality.
d. The subdivision plat and legal description do close.
Please contact Technical Services, at 221-6588, if you have questions
about these comments.
The following comments and concerns were expressed at the weekly Staff
Review meeting on September 13, 2000:
Engineering (Marc Virata)
5. Apparently no off -site easements for grading into the City -owned Natural
Area to the west will be needed.
6. The applicant has addressed City Staff's comments and concerns. The
engineering looks OK and this development request is set to go to the
Planning and Zoning Board for a decision.
.,
City of Fort Collins
Commun Planning and Environmental S ices
Current Planning
September 20, 2000
VF Ripley Associates, Inc.
c/o Cathy Mathis
401 West Mountain Avenue
Fort Collins, CO. 80521-5828
Dear Cathy,
Staff has reviewed your revisions for the Registry Ridge PUD, Third Filing -
Final that were submitted to the City on August 24, 2000, and would like to
offer the following comments:
1. A copy of the comments received from Marc Virata of the Engineering
Department is attached to this comment letter. Additional comments
may be found on red -lined plans that are being forwarded to the
applicant. Please contact Marc, at 221-6750, if you have questions about
his comments.
2. A copy of the comments received from Donald Dustin of the Stormwater
Utility is attached to this comment letter. Additional comments may be
found on red -lined plans and reports that are being forwarded to the
applicant. Please contact Donald, at 416-2053, if you have questions
about his comments.
3. Terry Farrill of the Fort Collins -Loveland Water District and the South
Fort Collins Sanitation District offered the following comments:
a. All facilities that are not located within public rights -of -way will
require easements on the District's standard easement form. The
District easements on the construction drawings do not correlate
with the subdivision plat for the property.
b. Water services are not allowed between the fire hydrant and the
valve on the main. Adequate thrust restraint is to be identified for
removal of the fire hydrant without a disruption of service.
281 North College Avenue • PO. Box 380 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020