Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - SUBMITTAL DOCUMENTS - ROUND 5 - ROUTING SHEETProject: Planner: 57-25-vE OLT Engineer: /,Ucr r /L/ TnMc Operations: Date: 612 Items Requested Redlined Items Being Returned Site I land I Plat Utility Drainage R t Other Items Required Site land I Plat Utility Drainage fl t Other items Being Returned Engineering X X Stormwaterx, x X Water/Wastewate 1 Traffic Operations Trans. Planning Transfort Natural Resources Park Planning s Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions. n Revisions , 1 ' r Sheet - � mom Nm0��������e� . , mBUILDING ��������s��� INSPECTION IN IN LIGHT & POWER IN m IN IN IN mom m mom ADVANCE PLANNING N mm��� R-O.W. PLANNING -�VATER m IN CONSERVATION WIN 0 IN IN mm STATE HIGHWAY DEPARTMF24T MIN m ON IN RAILROAD: UP or BN/ss-- �IN mm�®�iiiiii�