HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - SUBMITTAL DOCUMENTS - ROUND 5 - ROUTING SHEETProject:
Planner: 57-25-vE OLT
Engineer: /,Ucr
r
/L/
TnMc Operations:
Date: 612
Items Requested
Redlined Items Being Returned
Site I land I Plat Utility Drainage R t Other Items Required
Site land I Plat Utility Drainage fl t Other items Being Returned
Engineering X
X
Stormwaterx,
x
X
Water/Wastewate
1
Traffic Operations
Trans. Planning
Transfort
Natural Resources
Park Planning
s
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
n
Revisions , 1 ' r Sheet - �
mom
Nm0��������e�
. ,
mBUILDING
��������s���
INSPECTION IN
IN
LIGHT & POWER
IN
m
IN
IN
IN
mom
m
mom
ADVANCE PLANNING
N
mm���
R-O.W. PLANNING
-�VATER
m
IN
CONSERVATION
WIN
0
IN IN
mm
STATE HIGHWAY DEPARTMF24T
MIN m
ON IN
RAILROAD: UP or BN/ss--
�IN
mm�®�iiiiii�