HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProjert: PlI
Date: D /4
Planner:
Traffic Operations:
ST��
Engineer:
Items Re uested
4
Redlined Items Being returned
Site Land Plat Utility I Drainage Rpt
Other Items Required
Site I land I Plat Utility Drainage R t Other Items Being returned
Engineering X x
L!J
x
itormwater
x
k
x
x
X
A-
Water/Wastewate
—
Tralic Operations
Trans. Planning
js
k
Trantfort
Natural Resources
—
ParkPlanning
PA/
totals
5
3
.3
z
l
Z
z
Other:
t
Note: all WNW items should be returned with the resubmittal/revisions.
No Text