Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProjert: PlI Date: D /4 Planner: Traffic Operations: ST�� Engineer: Items Re uested 4 Redlined Items Being returned Site Land Plat Utility I Drainage Rpt Other Items Required Site I land I Plat Utility Drainage R t Other Items Being returned Engineering X x L!J x itormwater x k x x X A- Water/Wastewate — Tralic Operations Trans. Planning js k Trantfort Natural Resources — ParkPlanning PA/ totals 5 3 .3 z l Z z Other: t Note: all WNW items should be returned with the resubmittal/revisions. No Text