Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. )�44g e Planner: Engineer: Traf operations: E—c c �L Date: $ f z 5/T7- Items Requested Site Land Plat I Utility I Drainage Rpt Other Items Required Redlined Items Being Returned Site land Plat Utility Drainage Rpt Other Items Being Returned Engineering t vo c2e pest - X x Stormwater Traffic Operations I Trans. Planning TranOrt Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ revisions. Ilx fwo,as Project Routing Sheet Item: i A-) — tFitAtA zp' Date Received: y /-t V APOs Received: FILE: PROTECT PLANNERZ. — — — — ENGINEERING: PAVEMENT A/Z ENGINEERING -- — — 2 --- ZONING BUILDING INSPECTION" — — — LIGHT & POWER — MAPPING / DRAFTING A PARK PLANNING FORESTRY _} STORMWATER UTILITY WATER & WASTEWATER/FCLWD Y 4`F y TRAFFIC OPERATIONS — — — Ila TRANSPORTATION PLANNING —Il }` NATURAL RESOURCES FIRE POLICE - LORI DIGLIANI ADVANCE PLANNING` STREETS R.O.W. PLANNING t t ^µ. TRANSFORT WATER CONSERVATION POST OFFICE — US WEST PUBLIC SERVICE — SCHOOLS: POUDRE / THOMPSON CABLE TV STTR,RE,.,.E..,,T OVERSIZING 3Y��a��YCl'�LY4Atr�ir�e� i S PRPA au 19 19 l0 iI