HomeMy WebLinkAboutREGISTRY RIDGE PUD, 3RD FILING - FINAL - 32-95E - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject. )�44g e
Planner:
Engineer:
Traf operations: E—c c �L
Date: $ f z 5/T7-
Items Requested
Site Land Plat I Utility I Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage Rpt Other Items Being Returned
Engineering
t
vo c2e pest
-
X
x
Stormwater
Traffic Operations
I
Trans. Planning
TranOrt
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Ilx
fwo,as Project Routing Sheet
Item: i A-) — tFitAtA
zp'
Date Received: y /-t V
APOs Received:
FILE: PROTECT PLANNERZ.
— —
—
—
ENGINEERING: PAVEMENT
A/Z
ENGINEERING
--
—
—
2
---
ZONING
BUILDING INSPECTION"
—
—
—
LIGHT & POWER
—
MAPPING / DRAFTING
A
PARK PLANNING
FORESTRY
_}
STORMWATER UTILITY
WATER & WASTEWATER/FCLWD
Y 4`F
y
TRAFFIC OPERATIONS
— —
—
Ila
TRANSPORTATION PLANNING
—Il
}`
NATURAL RESOURCES
FIRE
POLICE - LORI DIGLIANI
ADVANCE PLANNING`
STREETS
R.O.W. PLANNING
t
t
^µ.
TRANSFORT
WATER CONSERVATION
POST OFFICE
—
US WEST
PUBLIC SERVICE
—
SCHOOLS: POUDRE / THOMPSON
CABLE TV
STTR,RE,.,.E..,,T OVERSIZING
3Y��a��YCl'�LY4Atr�ir�e� i
S
PRPA
au 19 19 l0 iI