Loading...
HomeMy WebLinkAboutREGISTRY RIDGE PUD, PHASE I - FINAL - 32-95B - CORRESPONDENCE -r 35. Pond 603 must be within a drainage easement. Tract D is shown as future medium density, but is not dedicated as.a drainage easement. 36. The construction phasing plan should consider the drainage for each phase. Please show the phase lines on the drainage plan. 37. Please show further details of the grading along lots 62-65 and Trilby. The proposed grading of this area does not tie into the street grades. 38. The spillway from pond 601 must spill into the street, rather than off -site to the north. 39.Overflow swales are needed for all sump inlets. Please size these swales, provide cross -sections, and provide easements. 40. Inlet 48 should be labeled as a 10' inlet. 41. Please provide calculations for the design flows for swales 3 and 10. 42. Please show all crossing utilities on the storm sewer and other utility profiles. Please call out clearances between crossing utilities. 43. Please provide rip -rap sizing calculations for all storm sewer outfalls, and show rip -rap protection for all needed locations. 44. Please label on the utility plans the type and size of all storm sewers. 45. Please provide cross -sections for all swales. 46. An erosion control plan and report is needed for the on -site and off -site construction. Specific measures should be taken to protect Lang Gulch from sediment deposition. Please refer to the redlined plans and report for additional review comments. Other comments that can be addressed after P&Z 24. The program used for the storm sewer analyses is not the typical program used and accepted by the City. Please provide further information on the assumptions and calculations used in the program. The output provided does not give any indication of loss coefficients. UDSewer is the conventional program accepted by the City and the UDFCD. The results presented with this program should be verified with UDSewer. 25. All open swales must be within tracts dedicated as drainage easements. The tracts will be owned and maintained by the homeowner's association. Please see the plat for further details. Some of the swales are in tracts, but the tracts need to be dedicated as drainage easements. 26. Storm sewer 7 is shown within the lot lines of lots 13, 14, 15, 20, 21, and 22. All storm sewers must be within a minimum 20' wide easement, with sufficient room for maintenance. 27. The water surface of the channel downstream of culvert 39 must be calculated to show that no flow will be on proposed lots. 28. The drainage report should consider, for the ultimate condition, the street flows on the east side of Shields and the north side of Trilby. Additional inlets, storm sewers, and swales will need to be installed to handle the gutter drainage. Street capacity should be checked for the minor and major storms. 29. The swale on the east side of Shields, near Station 17+00, is shown to discharge across the bike path. How will this flow cross the path? 30. Proposed grading of Shields is shown over an existing irrigation structure at Station 17+00. What will happen to the irrigation line? Do the owners approve? 31. The grading at the south end of the Shields improvements must tie in with the existing topography of the area. 32. The interim grading of Trilby does not match the proposed grading shown on the utility plans. Please show the street grading tying with the proposed overlot grading of the development. 33. Please show further details of the sub -station along Trilby. Please label all electric Poles. Will any thing need to be removed for the construction of the outfall pipe and swale7 34. Please label on the grading plans the cross -sections and water surface elevations of Lang Gulch as shown on the master plan. 18. Detailed calculations must be provided for the detention pond stage -discharge curves. The analysis provided does not give the needed information to verify the results. The calculations should consider inlet and outlet control conditions. RESPONSE: 19. The existing pipe under Trilby, serving as the pond 601 outlet, is shown on the plans as a 48" RCP. However, field visits reveal this existing pipe is a 36". Please show the correct size of the pipe. The pond rating will need to be revised to reflect the 36' pipe. RESPONSE: 20. Please supply rating curves and supporting calculations for ponds 602, 303, and 603. The calculations should reflect the pond conditions shown on the plans. RESPONSE: 21. The areas for basins 402 and 403 are larger than the areas used in the model. Please revise these basin areas to reflect the areas shown on the plans. The basin widths will also need to be revised. RESPONSE: 22. The reach of Lang Gulch (conveyance elements 504 and 524) is modeled as a trapezoidal channel with 20:1 side slopes and a 50' bottom. This type of channel section does not reflect the master plan modeling for the gulch or the existing topography shown on the plans. Please revise these conveyance elements to reflect the conditions of the gulch. RESPONSE: 23. Conveyance element 515 is shown connected to a grass lined channel (element 505). The drainage plan shows basin 405 draining directly from the street to the pond 605. It does not appear that a grass channel is part of the basin conveyance and is not needed for routing. RESPONSE: path to the existing ground surface. These slopes should be revised to 4:1, and will increase the amount of easement needed. RESPONSE: 13. Pond 303 and the pond 601 outfall pipe and Swale must be within a drainage easement. RESPONSE: SWMM Comments 14. More information is needed regarding the master plan developed conditions and how Registry Ridge is a part of that model. A comparison between the master plan model and the Registry Ridge model is needed to verify downstream impacts, due to development. Peak discharges and volumes at downstream elements for both models should be clearly noted. Any modifications to the master plan model should be noted in this final report. The master plan assumed a portion of the Registry Ridge property to be undeveloped (basins 155 and 156). There must be no increase over the developed conditions master plan to downstream flows or floodplain elevations, due to the development of Registry Ridge. RESPONSE: 15. Please document all basin and conveyance element changes to the master plan, due to the Registry Ridge revisions. Please also note all off -site basin and conveyance element revisions. RESPONSE: 16. The method used to develop the pond rating curves does not reflect the proposed conditions shown on the plans. The pond contour areas have been over estimated compared to what is shown on the grading plan. Please revise the pond stage -storage calculations and verify the calculations with the grading shown on the plans. RESPONSE: 17. The model submitted used a 2 minute integration period with a 5 minute hyetograph time increment. The hyetograph time increment must be equal to or evenly divisible by the integration period. Please revise the model to use a 5 minute time step. RESPONSE: r 6. A grading plan was not provided for the most southern portion of the development. Please provide a grading plan for this area. RESPONSE: 7. Please show off -site basins and contours. The master plan shows large basins contributing to the on -site basins. Please indicate off -site flows and show how the off --site flows will be directed away from the lots. The drainage from basin 149 is shown draining across the lots of basin 403. RESPONSE: 8. Please delineate and show on the grading plan all existing wetland areas. RESPONSE: 9. Basins 404P and 404T are shown draining off -site to the east. Please provide details on where these lots will drain. Downstream easements may be needed to drain off -site. RESPONSE: 10. Please provide further details of where the discharge from pond 603 will drain. If there is not an existing drainage easement, then a drainage easement will be needed. Please show any downstream improvements needed for this outfall. RESPONSE: 11. Further details of Fossil Creek should be shown on the off -site sanitary sewer plans. The 100-year floodplain and the top of the creek bank should be shown on all applicable sheets. The most downstream crossing of the creek is not acceptable. The pipe must have at least 2' of cover from the flowline of the creek. Manholes should not be placed within the floodplain. The sewer alignment must be at least 30' from the top of the creek bank, accept at the crossings. Please show all crossings and water surface elevations. RESPONSE: 12. The off -site arterial street improvements show several locations where proposed grading will take place outside of the right-of-way. Grading easements will be needed from adjacent property owners for off -site grading. Please.clearly label the right-of-way limits on the street grading plans. Several cross -sections show 3:1 slopes from the bike 1. Proposed grading is shown within the floodplain of Lang Gulch (pond 603, Ranger Drive). The floodplain analysis for Lang Gulch must be revised to reflect the new channel cross -sections. Please plot the master plan and the revised floodplain for the gulch. If there is any rise to the water surface elevation for off -site properties, easements will be needed from the off -site property owners. Please see the SWMM comments regarding the hydrology of the development. The peak flow at the Shields crossing may change due to the detention upstream. RESPONSE: 2. Pond 601 is shown to discharge under Trilby and across the property north of Trilby. A drainage easement is needed for this off -site drainage. The easement is needed for the project to be considered for the Planning and Zoning Agenda. Downstream improvements for this outfall must be designed and shown on the utility plans. RESPONSE: 3. Please provide an overall drainage plan on one sheet. The plan should show proposed grading, drainage basins, off -site areas, floodplains, etc. The plan will help to review the drainage patterns for the entire development. RESPONSE: 4. There is an existing water pipeline along the south side of Trilby. A valve for this line is situated directly south of the existing culvert under Trilby. Please show this water line and valve on the utility plans. The detention pond and culvert extension is in direct conflict with the existing pipeline and valve. Please check with the Fort Collins - Loveland Water District for acceptable options for the conflict. RESPONSE: 5. Basin 406C is shown draining to the south off -site. Please show off -site contours to verify off -site drainage patterns. Off -site drainage easements will be needed to drain across private property. If an easement is not dedicated, then the drainage from this basin must be directed to the street. This basin is included in the 406 SWMM basin, but does not drain in the direction assumed in the model. RESPONSE: PROJECT CONPAENT SHEET City of Fort Collins Current Planning DATE: June 25, 1996 DEPT: Stormwater PROJECT: #32-95B Registry Ridge PUD, Phase I -.Final PLANNER: Mike Ludwig All comments must be received by: July 5, 1996 A written response for each of the following comments must be submitted, with the redlined plans and report, at time of project resubmittal. The responses must note any revisions or clarifications completed in result of these comments. If responses are not submitted with the resubmittal, the project will be returned to the applicant without further review. This procedure will help the review process become more efficient and effective. Thank you. Note: Comments 1-23 are issues that need to be addressed by revision date. These revisions will then be reviewed, and a staff recommendation to the Planning and Zoning Board will be made at Final Review. The revision date is 8/12/96 for the September P&Z and 9/4/96 for the October P&Z. r CHECK IF YOU WISH TO RECEIVE ❑ PLAT COPIES OF REVISIONS ❑ SITE i3.% e Lvdwjy ❑ LANDSCAPE ❑ UTILITY STREETS WITH HIGHBACK CURB MIN.. c c . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I 4' IN. . . . . . . . . . . . ....................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .............................. ... COLORED LOPE I -/Fr ...CONCRETE;,.' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................................... . . . . . . . . . . . . . . . . . . . . . . . ....................... . . . . . . . . . . . . . . . . . . . . ... .................................. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .... . . . . . . . . . . . . X2- M IGHBACK CURB LLI t--�OWUNE PLAN VIEW P OF GUTTER 0 * cTOOL JOINT E CURB Mr COLD= 1:12 Stope kAx 1 40 mAx FL up . . . . . . . . . . . .... ... . .......... 6. .. RAMP WITH PAMI&LY COLORED CONCRETE SECTION A -A N.T.S. I. KW UNM SML BE COND:IE MM VM 4 LOS/ CM VM Mg ND. 1117 ME KM POW OR MMM MX ING CLDR SD W OR M"M MML SNI SIM K Wn oil ALL 01M omm MIFMM 1: COIOREO PORIDN 0F?KRAP SIKLKFMMS0MWAMoMMI IMMADAMIff MMM VffH A WMNM OF 8 MUW W= is NM J4 DUWjIM M W40 a MM mom I MWM AM 10 BE =0 MMUMA 70 VAM O6ECIIO1611H SK 1/4 10 DIV TO am 6 om ON cow AS UK 4- M "M AM ALOVID IN lK R=X SK IMM VK CLO OR 'UAW AW W K MM NO am Twx 6 mm FROM FIX LK AS sm Imam cxwm mm a I mm AW MM 10 K AMMO 10 WU4MM WM DEW OM 0-16 wd II-177 OR a M301011) N lK Cfff DOW 7. MM MM FIW FM a 2MX8 M WK SO AM OF RW M MMM &AGNM MXMMWBEPMOATTHE BCC OrTHE RWXSMFMMMFUMS tM ff MU 9001 THE CM MD GM VlE OF AUWff CLFS n OAM PEDESTRIAN RAMP DETAIL FOR NEW CONSTRUCTION STANDARD DETAM AND ALTERATIONS I D-12.7 CITY OF FORT COLLINS, COLORADO RYWSNNS ENGINEERING DEPARTMENT - I APPROVED 'Icaaem oow = i----6' MIN—•� �i TOP OF CURB-\ U!!7� I---4' MINI • • •a PER FT. UPS EXISnNG BACK OF WALK TOP OF C' 2. SIDEWALK MI cntcaclE MI 8, 1PER SIDEWALK v CURB AS REQUIRED FOR LANDSCAPING IN 2' TRANSITION TO FULL WIDTH TYPIC HOLLYWOOD CURB (D-11—A) AS REQUIRIED FOR LANDSCAPING DRNE—OVER CURB (D-11) URB AS REQUIRIED FOR LANDSCAPING ES 6" VERTICAL CURB ' (D-11) UP 1--4' MIN-.4 ___�—FL I. NAP MACRO 9Wl K COI ' r WAD ■R14 LOS/ OX = oft in 1117 (RE so FORM OR APPIGtm ED AL 006 CLEAR XXW OR APPDOtm UK 9AIl MU K PRO ON C. W JOMIS AK AIM M IK R=X MI RAM I71E aMB OR VIWT A11R' W K lOOlm ALL Cmm LOIILKE SWACEi ND CLUR IN { NM FROM F10R IIE AS sm aADAm FOIAAa THE NOWLL RE F sEFrR AID ooa M1D ADWr;!!f aMau 1RM A W YAAYAI a e [awlT 9Wi0 g to I1Cx /4 oEFOIOm g{6 oR1tFM { MA1S i WRY CONai1C AY70ea a { ma: L A W FAM II ID RE AOCal01C 101mASE m Cum DELL' 9a all) OR a 0-1I .A (DE WRr. mume IT 1K an DOGI a WAG= ARE 10 RE I ' R FEIVOCC111Nt 10 VACL oREC1o1 IM 9C 1/4 NOR W =M 7' MM I000 RW FNW 6 RIVAR D 00 WIRE SAM Or FW* AND 1Rvsms Ja16 I Rim ON Como a 90111 t A I MA1 INCE CUR{ YAP K FWAm Q TAE FWX a IW NAP a SM F ROMUL F Ca1I 6 t m F mu WOR DE Cm MC am vu a ADMC9F an A16 on v IES 1/r PER Fr. MA1( 1/4• MAX n LIP {• CURB As NIMM Ir I. IN 1ANDSCopW TYPICAL RAMP CROSS—SECTION N.T.S. MID -BLOCK PEDESTRIAN RAMP DETAILS STUMARI) MAM FOR NEW CONSTRUCTION AND ALTERATIONS I D-12.6 I CITY OF FORT COLLINSo COLORADO 1APPROVED ENGINEERING DEPARTMENT z—'96 ARTERIAL / COLLECTOR WITH 6" VERTICAL CURB (D-11) 4' C NT LERSJOINi 6' w WcOI_'P.C. OLLIW PLAN VIEW FL / 2 + + + + 1/4' + t�jGRADE BREAK 4na >woFc rS L KW IA"X 9KI 6E MICRIlE c== NM 4 LOS/ aRC 511RO OW RM m7 (RE RD) FQW OR AFPIi G OAWL NO WA SFANR Ot A� IVO MA SKU M BE *R D OR AIL OMAN D ONXIE 9AFICIL i CMM PORIpN OF DE RAP 9MLL RE PORED g7FAf1W NO OORFIIEO sm A]MCDM O N= Will A Ml4AM OF R EDUW ot% II NMIµ DI WAG eves Ma R NM MAIAAL x DwIMIX ARE TO RE 9>MFE FOWDIMAM TO DWEL OItEMpR IDII 9R I/4 NM MEP mace imm 6 um am cow AS SIM 4.RDMIS IREMOM III 1ERMUESIX 10ADEWeORWwmrwREWDM0 CI 0 Ift I I M FROM R D# LRE AS SIM L MUN OOIICREIE DIM M 6 A LUM L JOIrt FIOM TO RE ILOOPo C 101REAS m artOL DEW pK D-II wd 0-17) OR AS SEUM D RY DE OW OCKOt 7. MM NO FLW RM 0 RMIX8 M an SLWn OF Rw AIO 1RN6RIM6. LAINM WOE CUM WCREMMQDE90OFDERYPM9MFRFCI MFORD 9 tW R 9MLL Mla1 DE C= AO Q MR SME OF /a = o="Q= MIN. 4' O 1/40/Fr 1 * 1 4' MAX. FL UP 6' SECTION A -A N.T.S. PEDESTRIAN RAMP DETAIL FOR NEW CONSTRUCTION I S7Ai1DAW DIMAM AND ALTERATIONS D-12.5 I CITY OF FORT COLLINS, COLORADO JAPPROVED ENGINEERING DEPARTMENT 2-'96 RESIDENTIAL STREET WITH DRIVEOVER CURB (D-1 1) 61 -\ DETACHED WALK MAX FL- Up 1/4- i PC -1 CURB AS REQUIRED FOR LANDSCAPING CONCRETE --Lrnuw POLE I. RW IN S"L K MOM MM WIN 4 UIS/ V= US Oft N1 III? (ItE ;a POW OR MM MX 8" WM SKM OR APM9 WA SKALL SUL K APFLIM ON ALL Mm MN= mm mm wo w lw aw SNFLL K mm somm w Dow= Km Amm caNUf W A WKW OF 8 UUW W= 13 mW J4 KMW BVZ Wja a ISM MNIKK I MW= At 10 K == MMWAAR TO TA n I Er m l WIN SK 1/4 SIM KEP =2 ism 6 ISM CN mm Is sm 4. ND MM AK XM N X RWJL SK ISM VW CM Olt IXAW AW W BE 1=9 10 OM Ift I SIM FF4M FLM ISE AS UK & MOAN C=M DO= 6 6 Wa L A99 WM ID BE XMVw 10 UMMMM a= DEW pM ),_IS OW 0_17) OR AS K1008 Of THE Crrf DOM I SWD V= RW FNSN 5 MUD OOIR WK MACE Or Ur NO IRVWM &A610 VKCMWKPARED ATIKBaWTHE RGrMSMFIMMMFOMS USM ff 9ft NM THE CIN MD Q= VU OF MJKDff OM NID QM PLAN VIEW 1:24 MAX IES 1/40 MAX. FL Up 60 60 CURB AS NEEDED S. FOR LANDSCAPING SECTION A —A N.T.S. PEDESTRIAN RAMP DETAIL FOR NEW CONSTRUCTION STANDARD DBTAM AND ALTERATIONS I D-12.4 CITY OF FORT COLLINSm COLORADO ENGINEERING DEPARTMENT IAPPROVED z. 3 0 U L,.I J J O U 60 RESIDENTIAL STREET WITH DRIVEOVER CURB (D-11) TRANSITION CUTTER PAN FROM 2' TO 1.16' (147 EVENLY FROM RAMP M PC MAX FL_ UP 1/4- PC./ CURB AS REQUIRED FOR LANDSCAPING CONCRETE /40 P TOOL JOINT ��� POLE ON 6 CENTERS �� 6'_MN. N0TFS 1.14' I. NYP IAIOIIC ZU ff CWaaIE oaM 1014 LOS/ aUac = OW No.1117(ME RM POW OR APIM9 Law. MI6 abW SFAW OR APHOND MAAL SILL SNNL BE IeRO ON ALL Mtm cowc m SWFm L MM PWIDI OF M WN SNwI. BE FWD SErMMY MD Cana M ,iavm ca CAM NIIN A WMAi OF a Eaw1Y s VC% II Natµ of me sa Wag a Naas NNm s DwaIIW NE 10 BE WM RMDOMM TO MU WMION ■M Six 1/4 NW oat IOaeD mmINaasONcow ASsm 4. NO MIS ARE ALMID N 11E MOVIE. SIX NW VADE CLFS OR tIIYNT Mr MC N 10MM No d= IN I NM FROM ROE IIE AS 9 ML S MN1AN a1Naa1E BMW 6 I NWIS a rc6rt NM TO BE /cca1 C 10 t1I1>WIDN ama DMC (om 0-16 ad a11) OR a oEM00 er DE MY DIGEFD. 7. mm w= MIT FN5116 MUD M DAME SW= OF RW AND 1Ma' M a A I NW 10E aAR6 W1' N PWO AT DE BCK OF DE RNP AS SMaM F WAMM F IM 6 USED a MUWIN 1EOWS MID iUI1ERSUaAM=OM6NOCM DETACHED WALK • PLAN VIEW • .r 160 VARIES VARIES , 1 24 MAX ,;. V IES ," � 1/4' MAX FL UP 6' CURB AS NEEDED FOR LANDSCAPING SECTION A —A N.T.S. PEDESTRIAN RAMP DETAIL FOR NEW CONSTRUCTION I ST&WAIM DS7AIL AND ALTERATIONS D-12.3 CITY OF FORT COLLINS, COLORADO GIs ENGINEERING DEPARTMENT APPROVED z-196 i 4' MIN. 4' T17P DF CURD MIN. 2' TRANS GRADE BREAK ' TO FULL MM PLAN VIEW RESIDENTIAL STREET WITH DRIVEOVER CURB (D-11) 1.1r 6' CURB AS REQUIRED FOR LANDSCAPING CONCRETE L RNP U6DNC S U 6E OCNCREIE aaa S MN 4 US/ CM Va We m 1117 (ME 10 FOW OR AWP00 MX ING CLEM ZVW OR APP &M WA 9RL STILL /E MM ON Au 01M COC EE 9J*XM s MWIM PWMN 6F THE RW ZU BE PWO SErxw W AHD ODWM Eno AMM CN= MN A NIMN 6F 6 MKU W= 16 NCRµ CDCRIED So Wo 6 NM La" I TRNISI= AK M 6E scaam WDOMM 101RAVM oNEC = Va SCI 1/4 NM KM Mn AM 6 NM 01 CDRER ASS = 4. NO MM NE N1M N nE RMX Sa go WK CURB oR blAlur Air BAY BE IWO N1 00 nM 6 NM rimy RON LK AS UK i mm" C1K71E1E ncom 6 6 mcHm 6. =ff PATIDN 10 BE MMU C A WDISIMMN W= DEW ML 0n -f6 wd D-17) oR AS OEIF MG BY 1HE C1n' DOM 7. SMW V= FLW r1NW 6 R:rA O IMR OOK RWACE /F RNP AND iRNOM LA6NCI IDECUD11t1fBEPaMQTHESnCFKXWXg M1FNGIMFCUD6 USM R SH161 W= THE VM AID WIM 5111E OF AWACDR CUD ND 9M 6• 124 MAX V ES 1/4' NN FL UP I � :K`.,'},'y'w.��. 6' CURB AS NEED FOR LANDSCAPING 6' SECTION A -A PEDESTRIAN RAMP DETAIL FOR NEW CONSTRUCTION AND ALTERATIONS STANDARD MAM D-12.2 CITY OF FORT COLLINS, COLORADO 1APPROVED ENGINEERING DEPARTMENT 6 e 4' MR 4' UWDING YO GRADE BREAK OF CURB MIN. 2' TRANSITION TO RILL WIDTH 4.43'--4 PLAN VIEW RESIDENTIAL STREET WITH DRIVEOVER CURB (D-11) I.,r 6' CURB AS REQUIRED FOR LANDSCAPING CONCRETE I. KW L"M S U BE Oa67tElE WIND WN 4 LBS/ MOC VX NO Na 1117 ME PE) PO Nr OR NPNM caw. MG aW SEA W OR NPR O mint ZU sRa N: Mno OR ALL oa = caO m SBRmm t MM PW OF of RAIP Swot BE PWO SEPAO W AND DXIM KM AQ = MKFVE wN A WUN OF a MW Seem, a Halµ ac MG Outs MMX a Naas PuaOt a M VWX ARE m BE SC G P[APE OMM M MU o6aMM MOB Sa 1/4 NM W Mara AOS 6 Naas Oa mm a sm 4. ND JWM ARE MOM N X R M W SIX NM WE CURS OR bWPf Air WY K Mon NO Q= IM a NM FROM FLN LK AS SROMR a mmu caN m D60 m a a Naas a AF mAmPN io K ACCN = M taRac m wrn oEDr; (MDL 0-16 WA at» OR AS oEMUG Of OE arc OCKI . 7. WM MOO RK FWW 5 NWW 00 D06E SWACE OF RW AND aZYL9 M d A 6 Hai VK CLO WY K PMM a DE BO CF DE RW a Sw1Mi F RMOM F CM a USED F MU Wai DE aRa AND Q= SME W ADM a6N = amot a' V ES I :� ' 1:2'� 1/4' MAX FL UP :.).... R:. avx�t.xx«�.;.,(��+� 6' CURB AS NEED Y-6- FOR LANDSCAPING SECTION A -A PEDESTRIAN RAMP DETAIL FOR NEW CONSTRUCTION AND ALTERATIONS STANDARD DETAD. D-12.1 CITY OF FORT COLLINS, COLORADO IMPROVED I96mmloNBILNGINEERING DEPARTMENT. . 2-' The City of Fort Collins Design Criteria and Standards For Streets, dated July 1986, is revised as follows: 1. Section 1.02.03.09. Curb and Gutter. , part a. shall be deleted and replace with the following: 1.02.03.09 Curb and Gutter. a. Access ramps in accordance with these standards and standard details D-12.1 through D-12.7 shall be provided at all intersections and pedestrian crossings. Whenever construction, alteration, or repair on an existing street affects any part of the apron, radius, ramp area, or pedestrian crossing area, the entire apron, radius, ramp area, or pedestrian crossing area shall be removed and replaced with a pedestrian ramp in accordance with these standards, as shown on Details D-12.1 through D-12.7, and as required by the Americans With Disabilities Act Guidelines, Section 14, Public Rights of Way, as amended. These Standards shall include, without limitation, the following: (1) Minimum ramp width shall be four feet, or the same as the widest adjacent sidewalk, whichever is greater, up to a maximum width of 8 feet. (2) Maximum longitudinal slope on ramp transitions shall be 1:12 (1 inch per foot). (3) Maximum transverse slope on ramps and/or ramp transitions shall be 1:24 (1/2 inch per foot). (4) Minimum transverse slope on all ramp, sidewalk, transition and landing surfaces shall be 1:48 (1/4 inch per foot). (5) A colored concrete ramp shall be provided as shown on Pedestrian Ramp Details D-12.1 through D-12.7 and according to one of the following methods: (i) The colored portion of the ramp shall be poured separately from the adjacent concrete, and dowelled into it with a minimum of 8 equally spaced, 18 inch long #4 deformed bars driven a minimum of 8 inches into the existing concrete; or (ii) The colored portion of the ramp shall be poured monolithically and colored with an approved shake - on pigment product following submission of a sample showing a minimum penetration of the Pigment of 1/8 inch, and with written approval of the City Engineer. (6) No joints are allowed in the flowline. A "dummy" joint or curb may be tooled no closer than 6 inches from the flowline as shown on Details D-12.1 through D-12.7. 2. Added as attachments are Details D-12.1 through D-12.7, copies of which are attached hereto. o�. 2-12 G rA t+F A parabolic curve is used. Figure 202-4 gives matical relations for computing a vertical curve, sags. the necessary mathe- either at -crests or Minimum lengths of crest vertical curves are controlled by stopping sight distance requirements (see 203.2 and Figure 203-2A). Minimum lengths of sag vertical curves are controlled by headlight sight distance and should be nearly the same as stopping sight distance. Minimum and desirable lengths of vertical curves may be determined from Table 202.4. Desirable lengths should be used where feasible. TABLE 202.4 Design Controls for Vertical Curves K DESIGN STOPPING LENGTH = .. K" TIMES ALGEBRAIC DIFFSRBNCS IN GRADES SPEED SIGHT DISTANCE, SAG MPH MINIMUM DESIRABLE CREST (FT.) (FT.) }MNIMUM DESIRABLE MINIMUM DESIRABLE 20 125 125 10 10 20 30 20 30 25 150 150 20 20 40 40 30 200' 200 30 30 50 50 35 225, 250 A4 L 50 60 70 40 ('275i 325 60 80 70" 90 45 `325 400 80 120 90 110 50 400 475 110 160 100 130 55 450 550 150 220 120 160 60 525 650 190 310 130 180 65 550 725 230 400 150 220 70 625 850 290 540 Vertical curves are not required where algebraic difference is less than 0.20%. In rural applications, the minimum length of vertical curves on main roadway, both crest and sag, should be 300 feet. For other applications, the minimum length should be about 3 times the design speed. Vertical curves that have a level point and flat sections near their crest or sag should be evaluated for drainage where .curbed. pavements are used. Values of K 167 or greater should be' checked for drainage. •' Also vertical curves that are long and flat may develop poor drainage at the level section. This difficulty may be overcome` by adjusting the flow line -of the ditch section. When the lengthof a vertical curve at the crest of a hill gives a stopping sight distance, of 600 feet or less, the roadway section shall be widened as shown on the Division "M" Standard. Registry Ridge - Final plan review (sheet 12 of 12) August 2, 1996 *** How does the design tie into the existing grades? A off -site design needs to be shown for an adequate distance to show that it works. As mention in previous comments per 1.02.03.06 `The grade and ground lines of all Arterials shall be designed to continue a 1000 feet beyond the end of proposed construction'. Shield Street Arterial Cross Sections • Basically see previous comments on cross sections Shields Street Arterial Striping plan • Show designated right turn lanes. Trilby Road Arterial Plan and Profile *** How does the design tie into the existing grades? A off -site design needs to be shown for an adequate distance to show that it works. As mention in previous comments per 1.02.03.06 `The grade and ground lines of all Arterials shall be designed to continue a 1000 feet beyond the end of proposed construction'. *** Trilby Road Cross section- Both bike lanes need to remain on the roadway per the latest discussions with transportation and that cross section will not work within the 100 of Row. Trilby Road is currently proposed to be a minor arterial with the new street standards. This has yet to get through City Council. It is scheduled to go in late August. If it become a minor aterial this will solve your problems as far as fitting the cross section into the ROW without requiring additional ROW to the north, but we have to ao with the current master street plan until a change is approved. If you want to wait and see if it is approved that is an option; otherwise you need to look at othe: options as mentioned in prior comments. Any ideas should be discussed with Eric Bracke and myself. We can certainly try and meet to discuss this prior to any submittal. Trilby Road Arterial Cross Sections • Basically see previous comments on cross sections Details • Provide Detail D-20 additions to existing walk. • The sidewalk ramp details need to be the new approved ones - see details attached. Registry Ridge - Final plan review (sheet 11 of 12) August 2, 1996 • The south edge needs to be the flowline profile as the curb and gutter will be built on the south side with this project. • Will the design of Trilby Road east of Shields Street work with the preliminary design that RBD did for the future overpass? (Part of the Ridgewood Hills 1 st filing plans) *** On the cross sections - A 6 foot bike lane needs to be provided on both side of the road. It is not acceptable to provide a combined bike path/walk. Therefore a 5 foot walk only need to be provided. The curb and gutter needs to .be built on the south side. Trilby road interim Grading Plan *** No swale shall exist between the curb and the walk. *** Provide any necessary off site easements Trilby Road intern cross sections *** Indicate what the slope of the road is at each cross section. If it is always 2.0% indicate that and call it out as typical. Want to know if the slope varies and how it varies. • Is this all new construction? Does any milling need to be done? Are portions an overlay? Need to indicate what is to be done and how this is to be constructed. • Make sure the cross sections accurately show what is to occur and that the sections that go through where the roads intersect reflect that. *** Show the curb and gutter in the cross sections. *** Along the off -site work you are still showing a Row width of 80 feet. Does the 50 feet of Row on the south side exist or is it being dedicated with this project? If it doesn't exist the Row will need to be dedicated and deeds of dedication provided. This will need to be dona prior to the property being given or purchased by the City. Slope easements will also be needed for the slope of the road that extends past the Row. *** Showing a side slope of 3:1 is this stable? Typical require a slope of 4:1 or flatter. Is this the only location that this occurs? Need to provide us with enough information to clearly indicate that this is a stable slope and can support the roadway. Trilby Road interim striping plan • Need to show how the striping connects with the existing striping and how the center turn lane transitions out (at the west end). • Indicate the location of the transition beginnings and the transition lengths. • Show the Railroad crossing location - I don't imagine the striping will be carried over the tracks. • Contact the Transportation Department for questions regarding striping. Shields Street Arterial plan And Profile *** Need dedicated right turn lanes designed southbound oi.to Truxtun Drive and Bon Homme Richard Drive. (Continued on next page) Registry Ridge - Final plan review (sheet 10 of 12) August 2, 1996 Shields Street Cross -Sections • Label the edge of ROW, and indicate easement locations. *** Indicate what the slope of the road is at each cross section. If it is always 2.0% indicate that and call it out as typical. Want to kno v if the slope varies and how it varies. • Is this all new construction? Does any milling need to be done? Are portions an overlay? Need to indicate what is to be done and how this is to be constructed. • Make sure the cross sections accurately show what is to occur and that the sections that go through where the roads intersect reflect that. *** Need to show how the pavement widens out for the right turn lanes and how the sidewalk moves over. *** Along the property you are showing a Row width of 100 feet. Does the 50 feet of Row on the east side exist or is it being dedicated'with this project? If it doesn't exist the Row will need to be dedicated and deeds of dedication provided. This will need to be done prior to the property being given or purchased by the City. Slope easements will also be needed for the slope of the road that extends past the Row. Shields Street Interim Stripping Plan • Need to show the intersection with Fossil Creek Drive and how the s`riping ties into the existing striping. Don't appear to show the transition that occurs at this intersection. • Need to indicate the width and the colors to be used for the striping. • Show where the roads intersect Shields Street. • Indicate where the tapers begin and the taper length. • Need to show the right turn lane and how the striping will need to be done for that. It should probably be a different detail since it will be done with a later phase. • How the striping should be done for the phase 1 work should be shown and, then for how it should be done for the phase 4 work. This again may need to be done with separate details/plans. • Need to show how the striping ties and transitions into the existing striping. Trilby Road Existing Conditions • Label the existing Row and the street intersecting the road. • The overhead power line is shown just ending. Does it do that/ • Is the line that is shown running down the middle of the road existing? (I think it is the sewer line) If it is not existing it really shouldn't be shown on the sheets that say existing conditions. Trilby Road Interim Plan and Profiles • What is the slope of the road at the point you are tying in? Is a transition needed to get back to the existing width. • Label the ROW line. (Continued on next page) Registry Ridge - Final plan review (sheet 9 of 12) August 2, 1996 • On the street intersection approach details indicate what the transition length for crown removal is based on your design. • If traffic circles (medians) are used the detail for outfall curb and gutter is needed. • Provide detail D-25 Asphalt paving at crosspans. Off -site Arterial Street Improvements Cover sheet • Correct mistakes in the General notes and add note regarding stripping. See above for wording of note. Shields Street Existing Conditions • Label the existing edge of ROW. • Label all items going under the roadway. Shields Street Plan and Profile • Indicate what, grade you are tying into. • There are some irrigations structures and other items being shown in the path of the detached bike/ped path. How does this interact with the path, are modifications needed? *** The design of the vertical curves need to meet the requirements for the stopping sight distance. If there is some reason why you are unable to do so please.discuss this with me. Arterials should be designed for a 50 mph speed. (This applies to the design of both Arterials.) *** The curb return at the corner of Shields Street and Trilby Road needs to be built with this project. *** A right turn lane at Truxton Drive will need to be built with phase 10. This needs to be shown and designed. *** The sidewalk needs to be moved 12 feet to the west to accommodate the future right turn lanes at Truxtun Drive and Bon Homme Richard Drive. • Need to show how the pavement will transition off the curb returns at each access point. • Need to show limits of construction for phase 1 and how the road wi.l be transitioned back to the existing width. The left into Truxtun will need to be provided with the first phase improvements. *** Need to show how the limits of construction tie into the existing pavement section at the south end of the property. *** What are the existing grades that are being tied into. *** Provide a cross section detail that shows the right turn lane. Shields Street Grading Plan ' *** The Row line needs to be labeled. *** Easements are needed for all work outside of the row. This may just involve construction easements or permanent slope easements. *** Need to show now the grading ties into existing contours at the south end of the project. (Continued on next page) . r Registry Ridge - Final plan review (sheet 8 of 12) August 2, 1996 • Bon Homme Richard Drive and 7ruxtun Drive need to be built to the curb returns on Shields Street. *** The centerline on Bon Homme Richard Drive west ofNimitz does not meet the collector standard minimum. A variance would need to be requested for this if it is not changed. • In many of the cul-de-sacs the high point needs to be moved so that the cross slopes in the cul-de-sacs are reduced or increased to meet minimums as the case would be. The minimum cross slope in a cul-de-sac is 1.0% and would like to see th : slopes minimized where at all possible. • The approach grades of a street intersecting another street shall not exceed a slope of 2.0% for 50 feet from the Row of the intersected street. It is currently exceeding it on Trout Court and Scamp Court. • In Kearsarge Court (south end) there is two low spots. This needs to be modified or another inlet provided. • See plans for additional comments. Grading Plans, Sheets 63 -71 *** Curb and gutter should be provided along Trilby Road and no swale should exist between !he curb and walk. • Is the grading to be done in phases or all at once? Erosion control estimates should reflect any phasing so that an amount for the entire site doesn't need to be deposited. • Lot lines in certain areas don't necessarily reflect what is shown on the other plans. *** The sidewalk on Shields Street north of both entrances needs to be moved over to accommodate the future right turn lanes. • Some of the path locations differ from what is shown on the landscape plan. In particular the path near the corner of Trilby and Shields. * * * Off site easements will be needed for the grading work on the east side of Shields Street. • Sheet 71 has the wrong area shown on it. Drainage Plan, Sheets 72 - 80 • Easements are needed for all the swales shown. Not all have easements shown for them now. • some of the sidewalk locations are shown sitting on top of the swales. • Swale section AA - where does the sidewalk go as in swale 9. Culverts, plans and profiles, sheets 81 - 82 • Culvert 19 will need to go to the curb and gutter. *** Can culvert 51 be built without getting onto the property to the east? Storm Sewer lines, Plan and Profiles, sheet 85 • Don't need interim storm sewer line 1 as curb and gutter should be put in with this prof ect. General Details, sheet 92 • The new sidewalk ramp details need to be used, see attached for new details. (Continued on next page) Registry Ridge - Final plan review (sheet 7 of.12) August 2, 1996 • The curb, gutter and sidewalk needs to be shown on Trilby. The sidewalk needs to be shown along Shields Street. All internal paths need to be shown. • Show the sidewalk ramps as indicated on the plans. • Lot lines and easement lines don't necessarily agree with the plat. • Make sure manholes stay out of the curb and gutter. • It is recommended that the paths connect into the sidewalk at a ramp location if this is possible. • Show curb stops in Legend. Plan and Profile sheets • Label the flowlines on profile - east, west, north, south • The cross slopes on the streets all appear to be less than 2.0%. Need to remember that this is calculated from the lip of gutter to the crown, see 1.02.03.14 of the street standards. • Show the curb returns and slope for the intersecting streets on the profiles. • Show the location of the sidewalk ramps. • The street intersections where a cross pan is not used need to be designed in accordance with detail D-18 with a transition.to start the crown line instead of taking the crown into the intersecting road. The through road needs to keel. its 2.0% slope through the intersection with other streets. • The vertical curves need to be designed to meet the proper design requirements, crest vertical curves are controlled by stopping sight distance and sag vertical curves are controlled by headlight sight distance. See the attached sheet for these minimums. Many of the vertical curves provided do not meet the minimums. Local streets have a design speed of 30 mph.and the collectors have a design speed of 40 mph. • In several intersections with out cross pans the elevation at a point along the flowline of the through street is too close to the elevation in the flowline. From the flowline to the lip of gutter a rise of. 115 occurs for rollover curb and gutter and is even greater for vertical curb and gutter. With these elevations being too close together this will not allow for the pavement to be straight graded out to the centerline, but instead to fall from the lip of gutter down to the point indicated and this rise up to the centerline. These elevations need to be modified so that a straight grade from the lip of gutter to the centerline can be achieved. • Provide more detail and elevations in the intersection of Ranger Drivn and Trilby Road, Truxtun Drive and Shields Street, and Bon Homme Richard Drive. • Ranger Drive at Trilby Road, showing a sump condition without provisions for drainage, while other plans show Ranger Draining onto Trilby. • The flowlines at the traffic circles don't appear to correspond with what is shown on the plan view. • The curb returns at Bon Homme Richard Drive and Truxtun Drive need to be designed to accommodate the future right turn lanes. That is a right turn lane in addition to the ultimate arterial cross section. (Continued on next page) Registry Ridge - Final plan review (sheet 6 of 12) August 2, 199E *** Coral Sea Court, Shark Court, Wasp Court, Sea Wolf Court, Trout Court, Scamp Court and Tang Court are shown with the ROW in the cul-de-sacs having square corners. The Row needs to have rounded corners and extend 9 feet beyond the flowline in the cul-de-sac. We do not want all the additional ROW shown. These type of cul-de-sac were provided in Fairbrooke Tract A that was done by Northern - that is a good example of what is acceptrble. Some of the lot lines will have to be extended or redrawn as they won't appear to have frontage with the reduction of ROW. In addition some of the bulb cul-de-sacs appear to have excess row - these should also only have row that extends 9 feet beyond the flowline of the cul-de-sac. *** A nine foot easement shall be provided along all local and collector streets ROW. *** Tract Q provides for no access for maintenance, how is this tract going to be maintained. *** An off site utility easement is needed at the South end of Kearsarge Ct. Utility Plans Cover sheet • Corrections on the general notes should be made. • The following note shall be added to the General Notes: The developer is responsible for all costs for the initial installation of traffic signing and striping for this development related to the development local street operations. In addition the developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the development (e.g. All signing and striping for a right turn lane into the development site). Construction Phasing Plan, sheet ??? • With the current phasing a temporary turnaround will be required with phase 3 and phase 10 as shown. These don't necessarily need to be shown on this plan. • At the beginning of Phase 5 Ranger Drive will need to be completed from Reeves Drive to Truxton Drive. At the beginning of Phase 8 Bon Homme Richards Drive and Ranger Drive From Bon Homme Richards Drive to Reeves Drive will need to be completed with Road base to meet emergency access requirements. This needs to be shown or indicated somehow. • The right turn lane southbound on Shields Street onto Truxtun Drive will need to be built with Phase 10. This needs to be shown. Overall Utility (in general), sheets 2 - 10 • The phasing needs to be shown and need to indicate how the utilities will be phased and the limits of construction for each phase. Need to show the barriers indicated necessary for each phase and the temporary turnarounds. (Continued on next page) Registry Ridge - Final plan review(sheet 5 of 12) August 2, 1996 • Label the easements on the plans. • Additional easements for drainage and utilities need to be provided as indicated on the plans. *** Add the Sight Distance Easement Restrictions to the plat: SIGHT DISTANCE EASEMENT RESTRICTIONS THE AREA WITHIN SIGHT DISTANCE EASEMENTS IS RESTRICTED TO THE FOLLOWING: FENCES SHALL NOT EXCEED 42" IN HEIGHT AND SHALL BE OF OPEN DESIGN. IF FENCES EXCEED 32" IN HEIGHT, THEY SHALL BE CONSTRUCTED OF SPLIT RAIL WITH A MINIMUM DIMENSION OF 1 2° BETWEEN HORIZONTAL MEMBERS. 2. BERMS, HEDGES, AND SHRUBS SHALL NOT EXCEED 32" IN HEIGHT. 3. TREE PLANTING SHALL BE RESTRICTED TO DECIDUOUS TREES ONLY. THE LOWEST BRANCH OF ANY TREE SHALL BE NO LESS THAN 42" FROM GRADE. *** You have two Tract G's shown and no Tract F. Tract G is dedicated as utility, access, :andscape and drainage easement per notes on page 1. I don't think you want the multifamily area defined as that. *** Provide additional Row along Shields Street for future right turn lane. *** The intersections of Row should be provided with radii. 1E. Corner of Shields and Trilby, Ranger and Trilby, Truxtun and Shields and Bon Homme Richard and Shields. • Need to define where the utility and drainage easements end. Do these back lot easements go all the way to the street or do they end earlier. (See between lots 47 and 48) *** A 15 foot utility easement shall be provided along Trilby Road and Shields Street. *** General locations of sight distance easements are shown. Lots 89 and 94 have a good portion of the lots taken up with sight distance easements, this will be reduced some with the elimination of the traffic circle. *** Lots 108 thru 112 will need a common drive with access easements covering that area, unless a 50 foot street section is used. *** Should the strip of land between lots 424 and 425 be its own tract? Does the park want to own and maintain this piece? • Tristate Electric needs to sign the plans for the easement dedicated to them. (Continued on next page) Registry Ridge - Final plan review (sheet 4 of 12) August 2, 1996 **" Lots 108 thru 112 need to have a common drive provided for them since Ranger Drive is being proposed as a 36 foot collector. Any other lots fronting on a collector street would be required to have common drives unless a 50 foot flowline to flowline width is provided. *"* Twelve feet of additional ROW needs to be provided along Shields Street prior to each access point to provide for a dedicated right turn lanes. The curb returns off of Truxtun and Bon Homme Richard Drive need to be put in at the ultimate flowline location. The sidewalk along Shields Street needs to be placed where it will exist ultimately. • A striping plan for the collectors needs to be provided. Plat • Note 6 shall be modified to read as follows: 6. Tract B is to be used as shown on the Plat and is to be owned and maintained by Peace with Christ Lutheran Church, a Colorado non -Profit Corporation, heirs, successors, grantees or assigns. • If the Church does own Tract B and it is being plated they will need to sign the plat as a owner and interest. If they don't own it yet it may be better to address this as note 7 does. What happens if they don't buy it or they eventually sell it. Add the following note: 9. Lots 62, 87, 88, 89, 94, 95, 100, 1011 107, 32, 61 and 416 shall not have access off of Ranger Drive. Access shall be taken off of the local street adjacent to the lot. Add the following note: 10. All lots within this development have frontage on a public street and in accordance with the City Code property owner(s) are responsible for maintaining the Right-of-way exclusive of the public street. Lots 70-88, 90-92, and 103-107 have multiple street frontages adjacent to each of said lots and, as a result and in accordance with City Code, the owners of said lots are responsible for the maintenance of all street frontage(s) adjacent to each of said lots. • Notes regarding easements- need to make sure these are clearly shown on the drawings. • Note 4 under the easements states that the 9 foot utility easements adjoining Ranger and Reeves Drives are also to be used for landscape purposes. - So are you stating that these are to be utility and landscape easements? These need to be clearly defined on the plans to indicate where the landscape easement ends. (Continued on next page) Registry Ridge - Final plan review (sheet 3 of 12) August 2, 1996 *** With the current phasing a temporary turnaround will be required with phase 3 and phase 10 as shown. At the beginning of Phase 5 Ranger Drive will need to be completed from Reeves Drive to Truxton Drive. At the beginning of Phase 8 Bon Homme Richards Drive and Ranger Drive From Bon Homme Richards Drive to Reeves Drive will need to be completed with Road base to meet emergency access requirements. • A suggestion -Why not in phases 9 and 10 bring the green space path up to the sidewalk (along the street) .where a ramp is required. Indicate what type of barrier is to be used to limit vehicular traffic on the emergency access road at King Court and Kearsarge Court. **" The paths are shown in different locations on the utility plans. The following note needs to be added to the plans(if traffic circles are used): Landscaping in all traffic circles shall conform to sight distance restrictions as provided on the plat. • The Blue Spruce will not be allowed in the traffic circle turn around. In General The following roads will function as collectors and should be designed as such: Ranger Drive from Trilby Road south to Reeves Drive, Reeves Drive from the west property line to Hancock Drive, Hancock Drive from Reeves Drive to Bon Homme Richard Drive, and Bon Homme Richard Drive from Shields Street to Hancock Drive. **" We are in,the process of developing criteria for traffic circles - (roundabouts). Until that criteria is developed traffic circles will not be allowed. Based on the vehicle size that will need to pass through the circles they may need to be about twice the size that has been shown on this project. Ranger Drive and Bon Homme Richard Drive need to be widened out at the intersection with the Arterials to a 50 foot flowline width to accommodate a dedicated right turn and left turn lane. The roads need to be widened out for a distance necessary to accommodate the stacking and vehicle volumes and provide for a proper taper. Additional ROW would need to be provided if the same width of parkway is desired as is shown now or if the road is widened to one side. Due to the volumes and striping on Ranger Drive access to Wainwright Court may end up being somewhat limited. (Continued on next page) Registry Ridge - Final plan review (sheet 2 of 12) August 2, 1996 The remaining items can be addressed at the time a full submittal is made. Traffic study The traffic study needs to be updated to address the following items: 1)There is now only one road intersecting Trilby out of this development. 2)The traffic study states that all four roads (now only three exist) that connect out to the arterials are collectors. The current plans show only two of the three roads being collectors, how does that effect things. 4)The traffic study addendum states that shields will have a five lane cross section and as such the auxiliary lanes will be provided/required as a part of that ultimate cross section. Yes a left will be provided, but this does not address if a dedicated right turn lane would be needed at these access points when a 5 lane cross section occurs. ( I talked To Matt about this and he said that yes dedicated right turn lanes would be needed with the ultimate x- section) Site plan Sight distance easements should be provided as shown. Sight distance easements appear to be needed across lots 3, 447, 416, 89, 94, 1301 131, 344, 206, 333, 327, 297, 510, and Tract G. **" Indicate what type of barrier is to be used to limit vehicular traffic on the emergency access road at King Court and Kearsarge Court. Note 5 states that 'Landscaping of common open space areas shall be included with this phase'. There are thirteen phases to this project, which one are you referring to. **" The following note needs to be added to the plans (if traffic circles are to be used): Landscaping in all traffic circles shall conform to night distance restrictions as provided on the plat. Landscape plans The phase lines need to be modified to show the entire street width that is to be included in that phase. This should also indicate if planting are to be done on both sides of the road in that phase. (Half roads are not built) **" Indicate all the sidewalk ramp locations as indicated on the plans. "** Phase 5 has been mislabeled phase 1. (Continued on next page) PROJECT COMMENT SHEET City of Fort Collins Current Planning DATE: June 25, 1996 DEPT: Engineering - Ping PROJECT: #32-95B Registry Ridge PUD, Phase I - Final PLANNER: Mike Ludwig All comments must be received by: July 5, 1996 Registry Ridge - Final plan review August 2, 1996 A full resubmittal of all utility plans in not necessary on revision date (unless it is required to address issues brought up by a department by revision date). Provide information to address the indicated concerns that are marked with three asterisks by revision date and a full submittal addressing the rest of the comments noted can be submitted at a later date. This is an effort to clearly identify those items and issues that need to be addressed by revision date and yet allow more time for the Engineers to address the more minor comments. As was discussed in a prior meeting Revisions need to be submitted on: August 21 for review to be considered for the September P&Z meeting. September 4 for review to be considered for the October P&Z meeting. (Continued on next page) CHECK IF YOU WISH TO RE E U PLAT COPIES OF REVISIONS ❑ SITE ❑ LANDSCAPE 0 UTILITY This completes the review comments at this time. Additional comments may be forthcoming as the various departments and reviewing agencies continue to review this request. Please be aware of the following dates and deadlines to assure your ability to stay on schedule for the September 23, 1996 Planning and Zoning Board hearing: Plan revisions are due by 12:00 noon on August 21,1996. Please contact me.for the number of folded revisions required for each document. Revisions and supporting documentation submitted after this deadline will not be reviewed for the September 23, 1996 Planning and Zoning Board hearing. PMT's, renderings, and 8 folded copies of final revisions are due by 12:00 noon on September 16, 1996. **i*A##AAA*iNiiiiiiii##AR###AAAA#AA#A#AA*A#*iiiiiiiiii*iA*iiAAAi**i**i*iA**iii#ii*A**i*Aii*i*iiiiiiiiA Please contact me at 221-6206 if you have any questions or concerns related to these comments. I would like to schedule a meeting with you as soon as possible, if necessary, to discuss these comments. Sincerely, Michael Ludwig Project Planner xc: Sherri Wamhoff Stormwater Utility file/Project Planner u • between lots 272 and 273 connecting Worden Court to the future medium density residential on Tract D. • between lots 264 and 265 connecting Wahoo Court to the future medium density residential on Tract D. b. Please indicate potential future access / connections from Preble Drive, Dewey Drive, and Reeves Drive; across Tract G (future multi -family) to Tract B (future day care) and Tract C (future commercial/office). C. Please show improvements to Trilby Road and Shields Street on the Site Plan. d. Please provide updated calculations for open space which meets the definition of "recreational open space' as defined on pages 117-118 of the LDGS. e. Please add a note to the Final Site Plan which states: "The Registry Ridge P.U.D., Phase 1, Preliminary, #32-95A was awarded five points for base criterion "g° of the Residential Uses Point Chart - being located within 1,000 feet of a child care center. A future child care center is proposed for Tract B. No other uses shall be allowed on Tract B unless an Amendment to the Registry Ridge Overall Development Plan, and applicable Preliminary and Final PUD approvals are approved by the City of Fort Collins.° f. The Registry Ridge P.U.D., Phase 1, Preliminary, #32-95A was awarded 11 points for bonus criterion up" of the Residential Uses Point Chart - total development budget spent on neighborhood facilities ($625,000) on Tract J. Tract J should be included with this Final PUD request. Please submit a site plan, landscape plan, elevations, etc. for facilities to be built on Tract J. g. Section 29-526 H(3) "Effective Period of a Planned Unit Development - time limit for validity of the final plan" requires the applicant to undertake and complete the development of an approved final plan within (3) three years from the time of final approval. It is staffs opinion that public improvements for all 510 lots must be completed within three years for the PUD to be considered substantially complete as defined in the above referenced section of the LDGS. h. Utility easements must be continued around the cul-de-sac bulb on Kearsarge Court. I. Please provide plans for the off -site bike path/pedestrian connection which was required by the Planning and Zoning Board as a condition of Preliminary PUD approval. u 14. The Mapping Department offers the following comments: a. Please show right-of-way widths of streets on all sheets. b. If additional right-of-way is being dedicated for Trilby Road, please state. C. The legal description does not match the plat (1314.10' versus 1294.10'). 15. Comments from the Engineering Department are attached. 16. Comments from the Stormwater Utility are attached. 17. The Current Planning Department offers the following comments: a. Pedestrian path connections are needed at the following locations: • between lots 79 and 80 to connect Wainwright Court to Permit Drive. • between lots 39 and 40; and 53 and 54 to connect Forestal Drive and Truxton Drive. • in the open space between lots 443 and 444; lots 438 and 439; lots 411 and 412; and lots 433 and 434. • between lots 387 and 388 connecting Coral Sea Court to the internal bike/pedestrian path. • between lots 304 and 305 connecting Snook Court to the internal bike/pedestrian path. • between lots 363 and 364 connecting Wasp Court to the internal bike/pedestrian path. • between lots 319 and 320 connecting Wahoo Court to the internal bike/pedestrian path. • between either lots 350 and 351; or lots 352 and 353 connecting Sea Wolf Court to the internal bike/pedestrian path. • between lots 330 and 331 connecting King Court to the internal bike/pedestrian path. • between lots 287 and 288 connecting Gridley Court to the public sidewalk along Bon Homme Richard Drive and/or the future medium density residential on Tract D. u e. The square footage of lots should be shown on each individual lot, rather than in a table on the last sheet. 9. The Poudre Fire Authority offers the following comments: a. Please provide a fire hydrant around lot 48/49 at the intersection of Truxtun Drive and Nimitz Drive. b. Please provide a fire hydrant around lot 433. C. The proposed fire lane road must meet the following: All access roadways must be an all-weather driving surface capable of supporting fire apparatus. Surfaces may be asphalt, concrete, or compacted road base. Surface criteria may be obtained from City or County engineering department respectively. Width is 20 feet reduced 12 feet at gates or other limiting features. 10. TO of Fort Collins offers the following comments: a. TCI of Fort Collins would like to see the utility easements marked on the plat maps. b. It appears that there are two Tract G's. c. The areas between the following lots needs to be a utility easement: lots 402 and 403; lots 411 and 412; lots 424 and 425; lots 433 and 434. d. Lot 353 needs a side easement on the west property line. e. The following lots need rear utility easements on the following lots: 167 to 179, 182, and 183. Also, lots 405 to 415 need rear utility easements or Tract J needs to be a utility easement. 11. The Transportation Department stated that auxiliary lanes are needed on South Shields Street and Trilby Road. Signage and striping plans must be included. 12. The Parks Department stated that the park site needs to be staked out on the ground to check slopes, drainage, etc. 13. The Advance Planning Department asked whether the landscaping at the northeast corner of the site should be a rural looking landscape (i.e. significant thickets of cottonwoods, sumac or plum, etc.) or a "hedgerows of cotton woods? Also, street trees are provided between the back of the curb and detached sidewalk along Trilby Road but none are proposed along Shields Street? Please explain. u. e. Water services are shown on the lot lines. Coordination is needed with the Fort Collins - Loveland Water District regarding water service locations relative to Light and Power facilities. f. Is Reeves Drive really a part of Phase 1? g. Street trees need to be coordinated with street light locations. 6. U S WEST offers the following comments: a. Review of these plans should not be construed as a commitment that telephone facilities sufficient to service this project are presently available. U S WEST will provide telephone service in accordance with the rates and tariffs on file with the Colorado public Utilities Commission. b. The developer is responsible for provision of all trench for telephone facilities, including street crossings and ditch crossings, within the project, and the developer contracts with U S WEST for facilities within the development. The developer provides reusable conduit from the telephone pedestal at the property line to the location on the building where inside wiring is stubbed out. C. Telephone facilities generally occupy rear lot utility easements, which must be located on terrain which permits trenching operations. d. Any relocation of existing telephone facilities required by these plans will be paid for by the developer. 7. The Pavement Management Division of the Engineering Department states that final testing of "rough cut° streets must confirm the original R-value of 11. 8. The Zoning Department offers the following comments: a. Please combine Site Plan Notes #1 and #10 (Setbacks for lots 448-510 ...... Remaining lots.........). b. Please indicate easement dimensions throughout as the scale is too small to measure accurately. C. Site Plan note #7 will not be enforced by the City of Fort Collins. d. Please revise the parking data on the Site Plan to indicate: °Driveways 510 units x 2 spaces per unit = 1020 parking spaces.' <: C. "Trilby Road existing conditions" (Sheets 23/50 and 24/50) fail to show existing gas lines west and east of Shields on the north side of Trilby. Conflicts with the gas line west of Shields appear to be minor. The line east of Shields is in an easement, and there is concern about the deep fills on the north side of Trilby in the vicinity of stations 61+50 to 62+50. d. The proposed shallow depths of many of the storm drainage culverts internal to this development will require proposed gas lines to cross underneath these culverts at additional expense to the developer. 4. The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District offer the following comments: a. All facilities that are not located within the public R.O.W. will require easements, submitted on the District's standard easement form. b. All utility crossings are to be identified on the sanitary sewer profile sheets. C. Easements, on the District's standard easement form, are to be provided for all facilities that are not located in the public R.O.W. Drainage swales are not to be located within District easements. d. Landscaping, trees, bushes, etc. are not to be located within 30 feet of District facilities. e. The District is currently working with the Engineer regarding the design of the proposed water and sanitary sewer facilities. f. The District will require another review of the revised plans due to the nature and number of the above comments. 5. The Light and Power Utility offers the following comments: a. Please indicate the square footage of each lot on the Final Plat. b. Light and Power will be installing a duct bank down the east side of South Shields and the north side of Trilby Road. C. Light and Power will need a permit from Burlington Northern to cross under the the railroad tracks (this can be a lengthy processl) Can this permit process be coordinated with the sanitary sewer providers request? d. Light and Power will need advance notification of locations requiring 3-phase power (school, neighborhood commercial, pool, etc.). CommujL.ity Planning and Environmental services Current Planning City of Fort Collins August 2, 1996 Frank Vaught Vaught -Frye Architects 1113 Stoney Hill Drive Fort Collins, CO 80525 Dear Frank, Staff has reviewed your documents for the Registry Ridge P.U.D., Phase 1, Final that were submitted on June 24, 1996, and would like to offer the following comments: 1. The Water Conservation Specialist requests that a note be added to the Landscape Plan which calls for the review and approval by the City of Fort Collins of any required landscape irrigation system, prior to the issuance of a building permit. 2. The Poudre Emergency Communication Center requests that the following streets be renamed, as they are sound -alike of pre-existing streets: Preble Drive - sounds like Pebble Shark Court - sounds like Sharps Worden Court - sounds like Warren Gridley Court - sounds like Grizzly 3. Public Service Company offers the following comments: a. Easement notes (4) and (5) on Plat Sheet 1 of 5 identify 9' utility easements along Ranger Drive and Reeves Drive for use for landscaping purposes. This represents a potential conflict with use of these easements for utility installation and maintenance. No trees are allowed to be planted within 4' of any natural gas lines. This restriction needs to be observed throughout this development. b. Major grade changes proposed for Shields Street represent serious conflicts with existing gas lines including an 8" high pressure transmission line. Substantial lead time will be required to accomplish relocation of said gas lines. 281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750 FAX (970) 221-6378 - TDD (970) 224-6002