HomeMy WebLinkAboutBOARDWALK OFFICE BUILDING - PDP - PDP170032 - CORRESPONDENCE - (3)09/13/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 2
10/30/2017: Ready for hearing.
Department: Zoning
Contact: Missy Nelson,
Topic: Site Plan
, mnelson@fcgov.com
Comment Number: 2
Comment Originated: 10/30/2017
Comment Originated: 09/13/2017
10/31 /17: Still missing pedestrian access for trash enclosure. LUC 3.2.4(C)(4)
Include pedestrian access area of trash enclosure on elevation.
Comment Number: 4
Comment Originated: 09/13/2017
10/31 /17: The units located on the south side of the building may still be too
exposed.
Please locate mechanical equipment (BTUs, meter, vents, conduits, vents,
boxes, etc.) on site plan and elevations and provide information on screening.
Comment Number: 7 Comment Originated:
10/30/2017
10/30/2017: The storm pipe outfall is called out as an 18-inch size on the Utility
Plan and a 12-inch on the Drainage Plan. Please make consistent. (final)
Comment Number: 8 Comment Originated:
10/30/2017
10/30/2017: Please provide a cross-section detail of the retaining wall and roof
drain piping. (final)
Comment Number: 9 Comment Originated:
10/30/2017
10/30/2017: Please tuck the FES into the bank more —it looks like it might be
sticking out too far. (final)
Comment Number: 10 Comment Originated:
10/30/2017
10/30/2017: Please note that since your proposed basin D basically matches
the previously approved basin (from Landings Office Park PUD) that drains
directly to JFK and Boardwalk, I won't require a variance for this. Please
remove any references to requesting a variance to our criteria for this. Just
make sure that its clear in the report that you are matching a previously
approved condition. (final)
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Lighting Plan
Comment Number: 8 Comment Originated: 10/30/2017
10/30/2017: There are line over text issues. See redlines.
Topic: Site Plan
Comment Number: 1 Comment Originated: 09/12/2017
10/30/2017: There are line over text issues. See redlines.
09/12/2017: There are line over text issues. See redlines.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 10/30/2017
10/30/2017: 1 believe you'll need truncated domes in the sidewalk in the
porkchop, much like a refuge island for a roundabout? This could be added at
final.
Comment Number: 3 Comment Originated: 10/30/2017
10/30/2017: We'll need signing and striping plans at final. - mostly signage in
the porkchop.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 09/13/2017
10/29/2017: ADDRESS POSTING - M-F -LOCAL AMENDMENT
The building address will need to be posted on east, west, and south of the
building. Depending on the address assigned by GIS, posting of the street
name on some sides of the building may be required. Code language provided
below.
> IFC 505.1.7: Buildings, either individually or part of a multi -building complex,
that have fire lanes on sides other than the addressed street side, shall have the
address numbers and street name on each side that fronts the fire lane.
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Landscape Plans
Comment Number: 10
Comment Originated: 10/31/2017
10/31/2017: As shown, the proposed street trees along Boardwalk are not in
compliance with the spacing standards in 3.2.1(D)(2). It looks like you could
slide the easternmost Linden over about 3' and place another tree along
Boardwalk while retaining at least a 40' separation from the street light and
having 30' spacing between each tree. Please add adjust the landscape plan to
meet this code requirement.
Topic: Site Plan
Comment Number: 5
Comment Originated: 09/11/2017
10/25/2017: Thanks for adding the bike rack detail to the site plan. To clarify,
will you be using the same bike rack for both the enclosed spaces and the fixed
rack spaces?
09/11 /2017: Please provide a detail of the proposed bike racks to be used.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-60359 bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 09/12/2017
10/27/2017: OK for FDP submittal of Erosion Control materials, previous
comments will apply at that stage.
09/12/2017: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; an Erosion Control Plan,
an Erosion Control Report, and an Escrow / Security Calculation. If you need
clarification concerning the erosion control section, or if there are any questions
please contact Basil Hamdan 970-224-6035 or email @ bhamdan@fcgov.com
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 10/30/2017
10/30/2017: Ready for hearing.
trees and fifteen feet by ornamental trees.
Comment Number: 5
Comment Originated: 09/08/2017
Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 6 Comment Originated: 09/08/2017
You may contact FCU Light & Power, project engineering if you have questions.
(970) 221-6700. You may reference Light & Powers Electric Service
Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FI NAL_18November2016_Amendment. pdf
You may reference our policies, development charge processes, and use our
fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees/electric-development-fee-estimator
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, IlynxwilerC poudre-fire.org
Topic: General
Comment Number: 7 Comment Originated: 10/29/2017
10/29/2017: WATER SUPPLY
> The fire marshal has determined that the existing utility infrastructure available
in the area supports minimum hydrant access. The hydrant immediately east of
the proposed building will be satisfactory, assuming it meets minimum
standards for pressure and volume.
> There will be no requirement to add another hydrant along JFK Parkway as
previously detailed in the last submittal round.
Comment Number: 8 Comment Originated: 10/29/2017
10/29/2017: FIRE LANE
The limits of the fire lane have not been fully defined as including all of the
available drive aisle connecting to the property line on the north and east of the
site. The fire lane shall be dedicated as an EAE by separate document.
Comment Number: 9
10/29/2017: AUTOTURN
Comment Originated: 10/29/2017
Please provide an AutoTurn exhibit to verify fire apparatus turning movements.
Comment Number: 10 Comment Originated: 10/29/2017
10/29/2017: FIRE LANE SIGNS
The limits of the fire lane shall be fully defined. Fire lane sign locations should be
indicated on future plan sets. Refer to LUCASS detail #1418 & #1419 for sign
type, placement, and spacing. Appropriate directional arrows required on all
signs. Posting of additional fire lane signage may be determined at time of fire
inspection.
Comment Number: 11 Comment Originated: 10/29/2017
08/25/2017: Comment from Neighborhood Services -Can you provided the
dimensions of the trash/recycling enclosure? The community recycling
ordinance which was passed last year requires all businesses and multi -family
complexes have recycling service that is equal to at least 1/3 of their service
volume (bin capacity x service frequency) by 2020. Consider building a larger
enclosure that will allow for adequate space to meet the requirements of this
ordinance.
Contact: Sarah Carter, 970416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 2
Comment Originated: 09/19/2017
09/13/2017: Construction shall comply with adopted codes as amended.
Current adopted codes are:
2015 International Building Code (IBC)
2015 International Residential Code (IRC)
2015 International Energy Conservation Code (IECC)
2015 International Mechanical Code (IMC)
2015 International Fuel Gas Code (IFGC)
2015 International Plumbing Code (IPC) as amended by the State of Colorado
2017 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI Al17.1-2017.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 129vult or 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Commercial: 2015 IECC commercial chapter.
Department: Light And Power
Contact: Clint Reetz, 970-221-6326, creetz@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 09/08/2017
L&P understands that three phase power will be needed for the property. Three
phase is in the area on the west side of JFK parkway and the south side of
Boardwalk drive.
Comment Number: 2
Comment Originated: 09/08/2017
Development charges, electric Capacity Fee, Building Site charges and any
system modification charges necessary will apply to this development.
Comment Number: 3 Comment Originated: 09/08/2017
As your project begins to move forward please contact Light and Power
Engineering to coordinate the transformer and electric meter locations, please
show the locations on the utility plans.
Comment Number: 4
Comment Originated: 09/08/2017
Street trees will need to be adjusted based on the location of the streetlights.
Forty feet of clearance to the streetlight will need to be maintained by shade
Contact: Stephanie Blochowiak, 970-416-4290,
sblochowiak@fcgov.com
Topic: General
Comment Number: 3
Comment Originated: 10/30/2017
10/30/2017: It appears non irrigated native seeding no longer included on
landscape plan. If this is the case please also remove native seed mix and
notes (LP sheet 3 in this submittal).
Department: Forestry
Contact: Molly Roche, mroche@fcqov.com
Topic: Landscape Plans
Comment Number: 1
10/30/2017:
Are there existing trees on -site?
Comment Originated: 09/14/2017
09/14/2017:
If there are any existing trees on -site, please contact City Forestry (Molly Roche
i mroche@fcgov.com) to schedule an on -site meeting to obtain tree inventory
and mitigation information.
Comment Number: 7
Comment Originated: 09/14/2017
10/30/2017:
Thank you for using a shade tree in place of the Chanticleer Pears in the
parking lot. Please use one of the previously suggested species in the parking
lot — Catalpa or Kentucky Coffeetree.
09/14/2017:
According to Land Use Code (LUC) 3.2.1 Section E.5, canopy shade trees
must be used in parking lot islands. In place of the Chanticleer Pears, please
use a suitable canopy shade tree in the parking lot, such as Catalpa or
Kentucky Coffeetree.
Comment Number: 9
Comment Originated: 10/30/2017
10/30/2017:
According to Land Use Code 3.2.1 D (3) Minimum Species Diversity, 33%
maximum percentage of any one species if there are between 20 and 39 trees
on -site. There are 25 trees proposed on this plan and it appears as though Sky
Rocket Juniper exceeds the 33% maximum percentage at 44%. City Forestry
suggests incorporating one or two additional evergreen species on the plan.
Comment Number: 10
Comment Originated: 10/30/2017
10/30/2017:
Typically Lindens do not survive or thrive well along roads treated with deicing
salts. Please evaluate changing the two Lindens along Boardwalk Drive for
another species from the City of Fort Collins Street Tree List, such as Bur Oak,
Kentucky Coffeetree, or Catalpa.
Department: Internal Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 08/25/2017
Fort Collins
./1"�
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/developmentreview
November 03, 2017
Cathy Mathis
TB Group
444 Mountain Avenue
Berthoud, CO 80513
RE: Boardwalk Office Building, PDP170032, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
Comment Number: 7 Comment Originated: 10/31/2017
10/31/2017: Previous comments addressed. OK to proceed to public hearing.
Comment Number: 8
Comment Originated: 11/03/2017
11/03/2017: Following up from staff review, please ensure the drawings reflect
the extent of the existing access, drainage, and utility easement that was
established with the original plat for the project. As there appears to have been
a blanket utility easement that accommodates the equivalent 15' utility
easement from the back of walk, we may not need additional utility easement
dedication, pending this information. In addition, I would be OK with not
dedicating an additional 1 foot of right-of-way under the premise that the
proposed sidewalk would still be partially covered with an existing access
easement.
Comment Number: 9 Comment Originated: 11/03/2017
11/03/2017: At time of final, please have the civil drawings provide construction
detail for the hardscape median (concrete pattern and color, etc.)
Department: Environmental Planning