HomeMy WebLinkAboutEAST RIDGE - PDP - 33-98D - CORRESPONDENCE - (10)Advanced Planning:
1. The proposed development includes buildings which may be eligible for local
landmark designation. Any alteration, demolition, or addition to the structure
must first be reviewed by the Landmark Preservation Commission.
4
r 1 -
Storm Drainage:
1. This site is in the Boxelder/Cooper Slough drainage basin where there are
presently no new development fees. This may change as City Council is
considering a new city wide drainage fee instead of the present fee which is
based on a specific drainage basin.
2. A drainage and erosion control report and construction plans are required and
they must be prepared by a Professional Engineer registered in Colorado.
3. Onsite detention is required with a 2 year historic release rate for water quantity
and extended detention is required for water quality treatment.
4. Looking at the layout there are several blocks of houses that could be prime areas
for rear lot swales which is not allowed. Only three lots can drain to a common
swale unless it is in a separate tract that is HOA maintained.
5. The applicants engineer indicated he had been working with Stormwater staff.
The site does have an old agreement with the Lake Canal that allows the site to
drain into their ditch. That is the controlling release rate. The plan is to have
detention on top of the existing sump/wetland.
Transportation Planning:
1. Alternative modes, including pedestrian, bicycle and transit, need to be included
in the transportation impact study.
2. Timberline Road is a 6-lne arterial, with a 7 foot detached sidewalk. Vine Drive
is a 4-lane arterial
3. Bicycle parking will need to be provided in a convenient location adjacent to the
41 multi -family residential units and commercial buildings.
4. A pedestrian connection will need to made through multi -family tract west of the
neighborhood park.
Natural Resources:
1. Any existing trees that are proposed to be removed will need to be reviewed by
the City Forester (Tim Buchanan — (970) 221-6361). Significant trees that must
be removed will need to mitigated.
2. A temporary limit of development zone of 450 feet will need to be provided
around the existing hawk's nest site..
3. A Fugitive Dust Control Permit will need to be filed with Larimer County.
4. The Natural Resources Department requests that the applicant pursues and uses
native plants and grasses as much as possible within the project.
Parks and Recreation:
1. Parkland Development Fees for each unit will be assessed at the time of building
permit. This fee is based on the area of each dwelling.
Current Planning:
1. The property will be subject to the design and land use standards within the
LMN zoning district.
2. The project will be subject to the design standards in Section 3.5.1 and 3.5.2 of
the Land Use Code.
3
Poudre Fire Authority:
1. Fire hydrants must be located within 300 feet of all buildings capable of
delivering water flows of 1,500 gal/min at 20 psi.
2. Address for the buildings will need to visible from the street, with a minimum of
6 inch letters on a contrasting background
3. Buildings may need to be fire sprinklered, based on size and use.
Water/Wastewater:
1. The site is served by ELCO and Boxelder Districts.
2. A 24" water line is located in Timberline Road.
3. The existing 16" water line will need to be relocated to the south.
Engineering:
1. Street Oversizing Fee for Fort Collins of $1,624/unit for single family and
$1,120/unit for multi -family will apply. The applicant may contact Matt Baker at
(970) 224-6108 for an estimate of the fees.
2. Larimer County Street oversizing fees will apply as well.
3. Additional right-of-way for adjacent streets will need to be dedicated if the
existing right-of-way is less than required pursuant to the Larimer County Urban
Area Street Standards.
4. A revised Traffic Impact Study will need to be submitted for this project. The
applicant will need to contact Eric Bracke at (970) 224-6062 for a scoping
meeting.
5. Adjacent street frontages and any internal streets will need to be improved or
built to the Latimer County Urban Area Street Standards.
6. Utility plans, development agreement and a development construction permit
will need to be prepared for this project.
7. A second point of access will need to be provided for the first phase. This access
point will need to be determined by PFA. -
8. There may not be an interviewing strip of land between the East Ridge Property
and International Boulevard where it is located adjacent to the site.
9. Preliminary design for the Timberline/Vine overpass and interchange will need
to be completed.
10. Final design for Vine, Timberline and International will need to be completed
(adjacent to the site).
11. 1,000 feet of off -site preliminary road design will need to be completed for all
arterial streets, and 500 feet of off site design for all others.
12. Pedestrian connections will need to be provided through all Blocks greater than
600 feet in length.
13. Site distance will need to be calculated at all intersections and drive curves.
14. A 100' diameter turn -around will need to be provided at the end of all street that
are not through streets (may be temporary).
15. Off -site pedestrian connections will need to be coordinated on all adjacent
properties.
E
MEETING DATE: January 10, 2005
ITEM: East Ridge Project Development Plan
APPLICANT: Kent Bruxvort
Jim Sell Design
153 West Mountain Avenue
Fort Collins, CO 80524
LAND USE DATA: A request to develop Phase one of the East Ridge Overall
Development Plan, generally consisting of 400 single family lots. The property is within
the City of Fort Collins and is currently zoned LMN — Low Density Residential Mixed
Use Neighborhood District. The following departmental agencies have offered
comments for this proposal.
COMMENTS:
Zoning:
1. The land uses within the project are permitted in the zoning district as a Type I
(Administrative) Review.
2. The maximum density permitted within the LMN zone district is 8 units/acre, 12
units/acre for affordable housing projects as defined by the City.
3. The number of off-street parking spaces will be subject to the uses proposed
within the project. Residential uses will have a minimum number of off-street
parking spaces, subject to the standards Section 3.2.2(K)(1) of the Land Use
Code. All parking lots will be subject to the design standards in Section 3.2.2(C)
of the Land Use Code.
4. Site landscaping will be subject to the landscaping and tree protection standards
in Section 3.2.1 of the Land Use Code.
5. The height limit for buildings within the LMN zone district is 2'/z stories.
6. A minimum of three housing types will need to be included within the PDP.
Light and Power:
1. Normal development fees will apply to the project.
2. The applicant will need to show the location of utility boxes, meters and service
lines on the utility drawings and site plan.
3. Three-phase power is located and available in Timberline Road. This will need
to be looped through the site.
4. The proposed park will need to be served by three-phase power.