Loading...
HomeMy WebLinkAboutEAST RIDGE - PDP - 33-98D - CORRESPONDENCE - FIRE AUTHORITY REQUIREMENTSI The new temporary access should tie into the existing Timberline Road, approximately 1500-feet to the north of the most southerly residential street located on the East Ridge project. This will meet the PFA distance requirements for two distinct points of access that were discussed in the aforementioned meeting. This temporary emergency access shall be" required and available so long as is necessary until another permanent access is provided which connects with any of the adjoining properties. It was recognized this new access could be a potential conflict with the realignment of the TimberlineNine intersection. Should this realignment occur prior to the east phase being developed, it shall be necessary and required to provide another solution for the required second point of access meeting the fire department requirements. If you have any questions, please feel free to contact me. Sincerely, JL Ron Gonzales Assistant Fire Marshal Poudre Fire Authority Cc: Sherri Wamhoff Development Review Manager TST Consulting Engineers Keith G. Sheaffer, PE 748 Whalers Way Bldg. D Fort Collins, CO 80525 970.226.0557(p) 970.226.0204(f) PA Fire Prevention Bureau 102 Remington Street Fort Collins, CO 80524 January 25, 2005 Ms. Susan Joy City of Fort Collins Engineering Department 281 North College Fort Collins, CO 80521 Re: East Ridge PDP — Access issues Project No.: 0983.0006.00 Susan, Phone: 970-221-6570 Fax: 970-221-6635 Intemet: vm wpoudre-fire.org This letter is in regards to the East Ridge project emergency access issues, specifically the need for two points of access.. The East Ridge project's only vehicular access comes from existing Timberline Road on the west. The remaining three (3) sides are land locked due to: 1. an existing gravel mining operation to the South, 2. vacant agricultural land to the West (Whitham property) and 3. existing railroad tracks to the North. I had a meeting with TST Engineering, January 19, 2005, and stated the Poudre Fire Authority (PFA) could approve the proposed street configuration as shown on the Concept submittal documents. However, two points of access will be required that meet the distance requirements of the PFA, since all access is from one side (Timberline Road). I anticipate this project will be submitted in phases. The existing points of access will allow the PFA to approve some portion of the project depending on the diagonal distance of the phased portion of this submittal. At the time of Final Development Plan submittal of the most easterly portion of the site, PFA will require a twenty (20') foot wide, all weather (some kind of chip/base course material) temporary access to be located across from the most northerly Collins Aire Park access (access is directly north of Skymaster Drive located on the East Ridge PDP site).