Loading...
HomeMy WebLinkAboutEAST RIDGE C-STORE - PDP - 33-98G - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSends. Figure 2 shows the assignment of the peak hour site generated traffic at the key intersections (Vine/Lemay, Timberline/Vine, and Timberline/Sykes). The Timberline/Sykes intersection is the same as the Timberline/Access'A intersection in the cited TIS. ,The new land use on Parcel B is a convenience/gas store with eight fueling positions. Site plans of the proposed convenience/gas x. store are provided in AppendiC. Table 2 shows the trip generation using Trip Generation, 7th Edition, ITE, as the reference document. This land use will generate 1220 daily trip ends, 85 morning peak hour trip ends, and 106 afternoon peak hour trip ends. The proposed land use will have.a significant amount (greater than 50 percent) of passby traffic. The passby traffic will come from traffic on Timberline Road and Sykes Drive. Figure 3 shows the assignment of the peak hour site generated traffic at the key intersections. While the turning traffic at the Timberline/Sykes .intersection increases, the site generated traffic at the Vine/Lemay and Timberline/Vine intersections does not change significantly. Figure 4 shows .the change. in traffic volumes between the approved and proposed Parcel B land uses at the key intersections. Figure 5 shows the short range (2010.) peak hour. traffic volumes with the approved projects plus build out of East Ridge as presented in my .March 7, 2006 memorandum requesting the subsequently approved capacity reservation. Table 3 shows the peak .hour operation. Calculation forms are proved in Appendix D. This intersection was shown to operate acceptably. Figure 6 shows the short range (201b) peak hour, traffic volumes with the approved projects plus build out of East Ridge with the convenience/gas store traffic. Since the proposed land use change adds so little traffic to this intersection, only a few turning movements volumes change. Table 4 shows the peak hour operation. Calculation forms are provided in Appendix E. This intersection will continue to operate acceptably. It is concluded that the proposed convenience/gas store on Parcel B will have very little impact at the key intersections.. The Vine/Lemay intersection will continue to operate acceptably, meeting the APF criteria at this intersection. It is respectfully requested that the capacity reservation at the Vine/Lemay intersection be approved with this proposed land use change. Do not hesitate .to contact me if there are questions or more information is required.. N co L C 88/123 C9 LO co �- 159/143 54/37 /�— Vine Drive 8/26 100/167 61 /66 —j� ^ rn v o LO N N N C Q E (D J A N N uO ` `O f 119/146 75/40 20no } 90/168 o 74/61 °' C CAD N m U') co O Q' N C O m E DELICH ASSOCIATES Traffic & Transportation Engineering 2272 Glen Haven Drive Loveland, Colorado 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 TO: FROM: DATE: SUBJECT: George Hart, Matt Blakely, City of Fort Matt Delich MEMORANDUM PLS Homes Jim Sell Design Collins March 16, 2007 is e rC i. j ! L7 East Ridge Development - Transportation Impact Study for Land Use Change (File: 0245ME05) A land use charige,has been proposed on Parcel B in the East Ridge Development. located in the southeast quadrant of the Timberline/Vine intersection in Fort Collins. This development has a capacity reservation at the Vine/Lemay intersection, as documented in Eric Brake's letter. dated March 1, 2007. The, East Ridge Final Project Development Plan has been accepted by the City of Fort Collins (Cameron Glass letter dated March 5, 2007 (signed March 7, 2007)). Per the Eric .Bracke letter, if a change of land use is proposed, a reevaluation of the capacity reservation will occur.' This memorandum provides the information necessary for that reevaluation. Eric Bracke requested a memorandum. showing new counts (within the last year) at the Vine/Lemay and Timberline/Vine intersections and the current operation at these intersections. In addition, the Vine/Lemay intersection should be reevaluated with. regard. to the capacity reservation. Recent peak hour traffic counts were obtained at the Vine/Lemay and Timberline/Vine intersections as shown in Figure 1. The Vine/Lemay counts were obtained in February 2007. The Timberline/Vine counts were obtained in August 2006. These counts are less than one year old. Raw traffic data is provided in Appendix A. Previous traffic counts at these respective intersections were obtained in February 2006 and January 2005. At the Vine/Lemay intersection there has been an increase in traffic in the' past year. At the Timberline/Vine intersection there was a decrease in traffic between the two counts. Table 1 shows the peak hour operation at these intersections using the most recent traffic counts. Calculation forms are provided in Appendix.B. Both intersections operate acceptably. The approved land use on Parcel B is retail. From the trip generation table in the "East Ridge Transportation Impact Study," (TIS) .February 2003, this parcel was shown to. generate 41.0 daily trip ends, 33 morning peak hour trip ends and 26 afternoon peak hour trip EAST RIDGE CSTORE - PROJECT DEVELOPMENT PLAN CONCEPTUAL ARCRITECTURAL ELEVATIONS r�• r �y l011lLfJICN r 1 11 rAY IDUTIDII � ,� >f 0 GSIa.-irml n nle Cer Weel, :Ne !}vellon me -tlJ4]-'1.19V r r ].r�<IlUll i0 O u Y f lr 'w U goal U L.51ere-SYrr [ev.iilrii. nl. LU We.�.Frgl [lrvelbn w 6 u a r U C FWAM SET s NOT Fm CONSTRUCTM cu ro /ufrri.s -- s.r rwa s.r.. Frrw c.r,,,nr .w.r m. OF LANDSCAPE PLAN PLANT UST DESIGN OBJECTNE rz ers NRz uraaML u m w.Hi¢roa A NY....RMa x.... r.a maranRaaLwr�xazve. r�nLuazLecrto Hwr Lar �, rW M rOVaMLCX LrRmRYG.Mvlt C.6YHM VM4iNiLm N/J xepyNLaMW M1mIQHL LUOLL416 IHM.OaO1! up 8¢ECI W y 1HE Aµie v4L oswre sTimG NIEIFsi N uLRanzboa .W nrr oa oqr wr. a L v au Li AIX RirAY�^. 4Y.m�x Y�x..f�n./ yy� 5 1.® im c�.a..ar w... oar LaLx e LANDSCAPE CATEGORIES DECIDUOUS TREE PLANTING aNmw�r.�wzw �NmN i����wa�lomw STEEL EDGING SHRUB PLANTING PLANT NOTES �. .ueuMH.rE1MLBax.LLPFMN'fm041Ce WM4MBVe6i:n11 IW a�W16 1 .LL1R669 LBlp,.6.mfm16 WO WeCOm BrNYVIm eW Y`L m L zzemarawbmmzL.nan Rvxrw®mLamo eBW uamamLeRwz xmeo W mE 1MR vno MRRzroz ,nu MNn.L aNlzm.GQlt zeM RMewwa.z mz rwnm emzzram�awanozwnznawLz va..rertuzi tfY8Mx1W66m L MRW.rbPASeFM1M11r.m60M.W RCiw4xmR[C?9PO aW. ��uwabwsa.zaxowwrtLamAwswrcwoepwo away. ioE mxwmiriw.rmama�euwaaeMuauwmr.w ,. �.wmL,CMe,a,..eW VIOBfI1WMW BYLLZRLiNb NY �, LOMNwNYI.E.da»,® TOM eOR.LMauMCE m6R8fIfMaPPMaRY rrEiTlO aW�EX,YI , a.narwuMz.rmr®bnmazrmLwrwW zwEE 1n��ug Lucm.a e.w. x.m. u�a.. aeRuonoH a r eer.eEx�R.vyaa, .,. La+a.�L muza,zmmw.000LO W�..cxaaewnw. n �m���zmcin.M. u�mue�nz.+ zaiwo Rezaernox.ro w.mv �xL .i WI,MCIm{ISHdiEIW a[11f 6YwT/LIB.wNaW awxmonzLaRmEciNEaarus.R. MavuoM.z LEn aunvo.r+w a.Lme v xoxu. ., RRazmnMaveazwiw.r. ro.mna.m rammv a riuLrow,.w.vLvri.wLrmwauizeowuwiMi co.�.c,®mmrmzxu� .ar.ww. MIb PYImI. t4iW.WDYY1)2®WlaET4LWlYW. WR.RVNIMIF 6Y®WMIMbt1HSIW4 i �.wo�Lw�u..c�rtr ao �w�o?c.ic Nv. .e�xEeweENwn aEmrzmnornie onmarcnn m ax nc w..lEvaiM.ASR® W `x�mi�waucRw,.r...... rNaxauoeR,asazmex �. ux oxazawa.,manrn anwenn. .,...x®r .w.�m�aen rmrnuL..nW zarzzr>�zm .x MEVOCNLE �tTETCF WEM..FRFdLUNCE aCND W EaWOW wiPx CrM �NOYYEmraxlY M0 eLRv.�i.Lw:w,�ac" awc woxrosunHCEW.rwL w uN,n rwo.w mesmam uooaan.,zr zsrr POP SUSMITTN REVIEW SET HOT FOR CONSTRUCTION "/m r LA1- SYe PI ••• I � �i wci, 1 II 1 I 1 3 1 1 I I i I I f ]�mroxlrouFx � I mnoy ' 1 ' I 1 E z k I i uwomago , 10 I 1 3'< I� p I 1 1 ( i , 1 1 : N�wu] ► 11 1 1 I0.uq 1.._.. 1 1 1 1 1 ar rv.su��rt Ya ar] I 1mM 1 iwo]xrw?e� I } axon I ---- i1 x F ,ar]rewn r]ro I' i �r om. I 1 I 11 1 Ilp«ywu",._ «� _ wcwlws.wuussuE'a f � I k Elgl],l ]IIFA ]lllf 61fIM81i]i YOMI ]I ®N N —_- we + w__. a---- "SVKES w—w—w w w— DRIVE (J _ _----- — wo,m«i- - LAND USE PARKING DATA ,nwm iww ,aw.x vn uE�] mom. wrz Ivwornrr� �]wr _ wv.wln ..n MCY4G ]Jb SITE DATA • ,f]I«1CM,M W,M •]S]�10Viwrt.,�141 m® du-r.a I&RIA'AL ,qqqq"," to � The r i i i 07 J 4 �W�. 4/AYMM w.Gi�.]YqulYrlrm+�M1. t�AM� N W SE'=09 PUP SUMMI TA REVIEW SET NOT FOR CONSTRUCTION SIGNATURES AND APPROVALS Y MPad tlb Mq�]Nn 4M�mnllm.Wq �MY� p]Ytl W QhtllM lA�,. LubW AMA East Ridge C-Store PDP March 16, 2007 Page 4 H. A list of names of general and limited partners (if a partnership), all managers and directors (if a limited liability company) and/or officers and directors (if a corporation) involved as either applicants or owners of the project development plan: Jeff Strauss, Manager Darlene Schuster, Manager East Ridge of Fort Collins LLC 4190 N. Garfield Avenue Loveland, CO 80538 PHONE 669-0870 Fax 669-8299 A development schedule indicating the approximate date when construction of the project, or stages of the same, can be expected to begin and be completed, including the proposed phasing of construction of public improvements and recreational and common space areas: Undetermined. The project will be developed in a single phase, and there are no public improvements proposed. 6. Transportation Impact Study: (see attached memo from Matt Delich, dated March 16, 2007) 10. Soils Report: (see attached Preliminary Geotechnical Engineering Report for the 160-Acre Ryland Parcel, by Terracon, dated March 25, 1999, the Supplemental Preliminary Geotechnical Engineering Report, by Terracon, dated December 14, 2004, and the Preliminary Pavement Thickness Report, by Terracon, dated April 10, 2006) 12. Hazardous Materials Impact Analysis: The proposed development will have fuel sales and thereby be required to store petroleum on -site in underground storage tanks. There will be up to four tanks ranging from 6,000 to 20,000 gallon capacity each. At a minimum there will be a diesel fuel tank, unleaded fuel tank, and a super unleaded tank. They will more than likely be Fiberglass Reinforced Plastic Double or Triple Wall Petroleum Storage Tanks to protect against potential leaks and will be installed per standard practices and per the manufacturer's specifications. If you should have any questions, please contact me at (970)-484-1921 or via email at mattb@iimselldesign.com. Sincerely, �Matthew J. Bl ely, ASLA ASSLAA Project Manager E:WROIECT FlIISu.ANOD EASTRIDGECSTOREDOCWUBB ,US1WWI)PSUBMMTT DOCUMEMS(w-I&n.DOC East Ridge C-Store PDP March 16, 2007 Page 3 HL Statement of proposed ownership and maintenance of public and private open space areas; applicant's intentions with regard to future ownership of all or portions of the project development plan: The owner/operator of the C-Store will be responsible for maintaining the open space and plantings on the site. iv. Estimated number of employees for commercial use: The estimated number of employees will be from one to three per shift. v. Description of rationale behind the assumptions and choices made by the applicant: The applicant's rationale behind this development plan includes the need of a convenience store, with fuel sales and car wash for the neighborhood and surrounding area. The next closest convenience store with fuel sales is 1.5 miles away from the proposed project location, on East Mulberry Street. The facility has been intentionally located within proximity to Timberline Road and the Vine Drive intersection for greater visibility that is still easily accessible to the residents of East Ridge Subdivision. The fuel bays have been placed on the west side of the site for more visibility from Timberline Road and to reduce their visual impact on the neighborhood. The C-Store building is positioned on the east side of the site to provide slightly easier access from pedestrians in the neighborhood and to help reinforce the neighborhood center. vi. Evidence of successful completion of applicable criteria: To the best of our abilities and knowledge, we have prepared a plan that is compliance with the current governing codes and criteria. ix. Name of the project: East Ridge C-Store PDP D. Response Letter to Conceptual Review Meeting: Cameron Gloss, the Director of Current Planning, has waived the Conceptual Review meeting requirement. F. Legal description of the site: A tract of land situate in the east half of Section 8, Township 7 North, Range 68 West, of the 6 h P.M.; City of Fort Collins, County of Larimer, State of Colorado. Tract W of East Ridge PDP, 0.96 Acres, generally located south of East Vine Drive and east of Timberline Road. Specifically, Tract W is located at the northwest corner of the intersection between Sykes Drive and Vicot Way. G. Name and address of each owner within the boundary of the development plan area: East Ridge of Fort Collins LLC 4190 N. Garfield Avenue Loveland, CO 80538 PHONE 669-0870 Fax 669-8299 EIIUMMFUX,U-M1121b8 EAST RO)MCSPORUUXX 51UM=A.LWDP SUBWWALDOCUbEt S(03-1641).DW East Ridge C-Store PDP March 16, 2007 Page 2 Policy T-5.2 Connections Through site design, the primary entrance will be visible to all pedestrian traffic approaching from Timberline Road. Other approaches will have clear access and will be readily apparent to the pedestrian user. Policy T-5.3 Continuity The site will connect to other proposed pedestrian circulation on all sides of the site. Policy T-5.4 Sidewalks The sidewalks on site will provide connections to the greater sidewalk pattern and shall be comfortable and safe for the pedestrian. Policy CAD-1.4 Street Tree Design $treet trees will be used to create intuitive corridors on the perimeter of the site. A mixture of species will be used to provide variety and interest. Policy CAD-3.1 Modification of Standardized Commercial Architecture The Architecture of this site will be compatible with that of the greater East Ridge development and will conform to the City of Fort Collins Land Use code and will add to the City's unique appearance. Policy CAD-3.2 Compatibility with Surrounding Development The architecture of this site will solidify and enhance the character of the surrounding neighborhood. Common building materials, details and color will .be used to create this connection. Policy CAD-4.2 Lighting and Landscaping Lighting and landscaping will be used to provide adequate security to all users of the site and surrounding areas. Areas of high contrast and shadow will be avoided and landscaping will not create areas of seclusion. Policy LMN-2.7 Neighborhood Retail Uses The convenience store with fuel sales use in this location is beyond 3/ of a mile from the nearest similar facility. I Description of proposed landscaping and circulation on site and in the general vicinity of the project: Street trees planted within the parkway will buffer and enhance the surrounding community. Tree placement as well as light placement and type will minimize light pollution to the neighboring residents. This site will connect to the East Ridge development and the greater area through pedestrian, bicycle and vehicular circulation. The design of the site will separate pedestrian and bicycle circulation from vehicular traffic to avoid user conflict. E:M0=FTLPSR.A U468 EAST RD)OE C ST0REDOCS%SUBhfl TAL DMDP SUBA9TT' DOCUMENTS(0346-07)DOC t March 16, 2007 City of Fort Collins Current Planning Department 281 N. College Avenue Fort Collins, Colorado 80521 LANDSCAPE ARCHITECTURE PLANNING RE: East Ridge C-Store Project Development Plan Submittal ENGINEERING Dear Current Planning Department: GRAPHIC DESIGN Jim Sell Design, Inc. represents East Ridge of Fort Collins LLC, the applicant for the C-Store PDP Development. We are submitting for your review the East Ridge C-Store Project Development Plan. The following represents the narrative portion of the submittal and is in direct response to the Project Development Plan Submittal Requirements to the City of fort Collins. Please see the attached appropriate documentation where noted. A. Application form, Filing fee, and sign posting fee: (see attached Application Form) B. Adjacent Property Owners List: (see attached APO list and labels) C. Statement of Planning Objectives: Proiect Overview The proposed PDP is for Tract W of the East Ridge Development. This 0.96 acre site is located on the northeast comer of Timberline Road and Sykes Drive. The site is ropghly square, with distances of 200' long by 250' wide. The East Ridge Development borders the site on the north, south, and east. Timberline Road is the west boundary. This site is within the City of Fort Collins Growth Management Area (GMA) and the current zoning is LMN. This property is encompassed within the East Mulberry Corridor plan. i. Appropriate City Plan Principles and Policies achieved through the PDP: Policy LU-1.1 Compact Urban Form Provide goods and services to local residents in close proximity to their home. This area will become a Neighborhood Center that will cohesively tie existing residents and users to the new development. Policy LU-2.2 Urban Design. Will link to new neighborhood through common arch style and planting design. This project development plan will be developed and reviewed by the city through the design review process and responds to the applicable city and county codes and standards. Policy LU-4.1 Planning within the Context of City Plan This site is located within the East Mulberry Corridor plan study area This project meets the guidelines and recommendations set forth in the plan. Policy T-2.2 Transit Stons Higher density areas will support the future transit stop proposed to be located as shown in the East Mulberry Corridor Plan at the intersection of Timberline Road with the collector road. Policy T-4.1 Bicycle Facilities Bike parking will be provided on site. Bike lanes are located on the adjacent collector and arterial streets allowing easy access to the proposed development. PDP SUBMT'AL DOCUMEM^ (617647).DOC 153 WEST MOUNTAIN AVENUE FORT COLLINS, COLORADO 80524 P97D.484,1921 F-970.484.2443 INFO@JIMSELLDESIGN.COM JIMSELLDESIGN.COM �' ROP fl SITE U O N <a�e gar T ROSELAWN CEMETERY #33-98G East Ridge C-Store PDP - Type II N 11 /5/2007 1 inch: 600 feet Plannir. Development and Transportati . Services Planning and Zoning City of Fort Collins MEMORANDUM Date: December 6, 2007 To: Planning and Zoning Board Members Thru: Cameron Gloss, Director of Planning & Zoning From: Stephen Olt, Project Planner 495A Susan Joy, Project Engineer -!�5T-3 Re: East Ridge C-Store, Project Development Plan (PDP) - #33-98G Re: Recommended condition of approval on the aforementioned PDP. This recommended condition becomes part of the Staff Report & Recommendation to the Planning and Zoning Board for the December 6, 2007 hearing. City staff recommends approval of this PDP proposal provided that the following condition is addressed and satisfied prior to Final Plan approval: "The developer is responsible for redesigning Sykes Drive to accommodate the design and construction of the proposed median at the intersection of Sykes Drive and North Timberline Road; and, for obtaining the additional street right-of-way necessary to construct the new Sykes Drive road alignment and width." 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020 East Ridge C-Store, Project Development Plan, #33-98G December 6, 2007 - Planning & Zoning Board Public Hearing Page 6 • Meet a wide range of needs of everyday living in neighborhoods, including a variety of housing choices, which invite walking to gathering places, services and conveniences, and that are fully integrated into the larger community by pattern of streets, blocks, and other linkages. A neighborhood center provides a focal point, and attractive walking and biking paths invite residents to enjoy the center as well as the small neighborhood parks. Any new development in this district shall be arranged to form part of an individual neighborhood. • Typically, Low Density Neighborhoods will be clustered around and integral with a Medium Density Mixed -Use Neighborhood with a Neighborhood Commercial Center at its core. This proposal complies with the purpose of the LMN District as it is an infill project, as part of an approved ODP, which provides components of a neighborhood center on a property that is surrounded by developed and undeveloped properties. There is an existing residential neighborhood to the west, a planned neighborhood center to the east and south, and planned single-family and multi -family residential to the north, east, and south. 5. Findings of Fact/Conclusion: A. The East Ridge C-Store, PDP is in conformance with the approved East Ridge, Overall Development Plan. B. The East Ridge C-Store, PDP contains uses permitted in a neighborhood center in the LMN - Low Density Mixed -Use Neighborhood Zoning District, subject to a Planning & Zoning Board review and public hearing. C. The East Ridge C-Store, PDP meets all applicable standards as put forth in the LUC, including Standards located in Division 3.2 - Site Planning and Design Standards, Division 3.3 - Engineering Standards, Division 3.5 - Building Standards, and Division 3.6 - Transportation and Circulation of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; D. The East Ridge C-Store, PDP complies with all applicable Land Use and Development Standards contained in Article 4, Division 4.5 of the LUC. E. The East Ridge C-Store, PDP is compatible with the surrounding land uses. RECOMMENDATION: Staff recommends approval of the East Ridge C-Store, Project Development Plan - #33-98G. East Ridge C-Store, Project Development Plan, #33-98G December 6, 2007 - Planning & Zoning Board Public Hearing Page 5 "in order to form an outdoor space such as a plaza, courtyard, patio or garden between a building and the sidewalk. Such a larger front yard area shall have landscaping, low walls, fencing or railings, a tree canopy and/or other similar site improvements along the sidewalk designed for pedestrian interest, comfort and visual continuity." Also, there is a 21' wide drainage easement that runs parallel to the required 9' wide utility easement along the Vicot Way ROW. The drainage easement prohibits the building from being able to satisfy the build -to line standard without the exception. D. Division 3.6 - Transportation and Circulation Section 3.6.2. Streets, Streetscapes, Alleys and Easements The proposal satisfies the applicable standards located in this section of the LUC. Section 3.6.4. Transportation Level of Service Requirements The proposal satisfies the applicable Transportation Level of Service standards including the following: General standard. This development proposal satisfies Section 3.6.4(B), which requires that all development plans adequately provide vehicular, pedestrian and bicycle facilities necessary to maintain the adopted transportation Level of Service standards contained in Part II of the City of Fort Collins Multi -Modal Transportation Level of Service Manual for the following modes of travel: Motor vehicle, bicycle and pedestrian. 4. ARTICLE 4 - DISTRICTS A. Division 4.5 - Low Density Mixed -Use Neighborhood District Convenience stores with fuel sales and fast food restaurants (without drive-in or drive - through) are permitted in neighborhood centers in the LMN - Low Density Mixed -Use Neighborhood Zoning District, subject to a Planning & Zoning Board (Type 2) review. The LMN - District is: • Intended to be a setting for a predominance of low density housing. The housing is combined with complementary and supporting land uses that serve a neighborhood and are developed and operated in harmony with the residential characteristics of a neighborhood. East Ridge C-Store, Project Development Plan, #33-98G December 6, 2007 - Planning & Zoning Board Public Hearing Page 4 square foot building. The combined uses would be allowed to have between 20 to 40 spaces. B. Division 3.3 - Engineering Standards Section 3.3.1. Plat Standards The proposal complies with the general plat requirements as set forth in this section. However, since the subject property is Tract W of the final East Ridge subdivision plat that is not yet approved, that plat must be recorded and filed before the final East Ridge C-Store development plans can be recorded and filed. Section 3.3.5. Engineering Design Standards The proposal complies with all design standards, requirements and specifications for services as stated in this section of the LUC. C. Division 3.5 - Building Standards Section 3.5.3 Mixed -Use, Institutional and Commercial Buildings The proposal complies with all requirements and specifications as set forth in this section. Orientation to a connecting walkway. The entries into the c-store and fast food restaurant building front on a directly connecting walkway to public sidewalks on both Sykes Drive and Vicot Way, as required in Section 3.5.3(B)(1) of the LUC. Orientation to build -to lines for streetFront buildings. The c-store and fast food restaurant building is set back from Sykes Drive (a collector street) a distance of 8.8' to 16.8' from the right-of-way (ROW) line, with the average being 135; and, 70% of the length of the south building face satisfying the build -to line requirements as set forth in Sections 3.5.3(13)(2)(a) & (b) of the LUC. The same c-store and fast food restaurant building is set back from Vicot Way (a local street) a distance of 30.6' to 40.0' from the ROW line, which does not satisfy the requirement that it meet the build -to line standard of 15'. The development proposal does, however, include an outdoor patio on the southeast side of the building facing Vicot Way that satisfies the permitted exception to the build -to line standard set forth in Section 3.5.3(13)(2)(d)1 of the LUC, which states: East Ridge C-Store, Project Development Plan, #33-98G December 6, 2007 - Planning & Zoning Board Public Hearing Page 3 showed a portion of a future neighborhood center (4.03 acres) at this location. Therefore, a City -sponsored and facilitated neighborhood information meeting was not held for the specific East Ridge C-Store, PDP development proposal even though no specific land uses permitted in a neighborhood center are shown on the ODP. 3. ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS The East Ridge C-Store, PDP proposal does meet all of the applicable standards in ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS of the LUC. Of specific note are Division 3.2 - Site Planning and Design Standards, Division 3.3 - Engineering Standards, Division 3.5 - Building Standards and Division 3.6 - Transportation and Circulation. Further discussions of these particular standards follow. A. Division 3.2 - Site Planning and Design Standards Section 3.2.1. Landscaping and Tree Protection The proposal satisfies the applicable Landscaping and Tree Protection standards, including the following: Street trees. The proposed street tree plantings are in accordance with Section 3.2.1(D)(2)(a), providing trees at 30' to 40' on -center in the 6' - T wide parkways (between curb and sidewalk) of both streets (Sykes Drive and Vicot Way). Screening. The proposed Landscape Plan satisfies Section 3.2.1(E)(4)(b) of the LUC in that the on -site parking lots & vehicular use areas are being sufficiently screened from the adjacent streets to the west, south, and east and developable property on the north side with a mix of deciduous & evergreen shrubs and ornamental grasses. Parking lot interior landscaping. The proposed Landscape Plan satisfies Section 3.2.1(E)(5) of the LUC in that there is 7% interior landscaping in the parking & vehicular use areas with less than 100 parking spaces, which exceeds the minimum requirement of 6%. Section 3.2.2. Access, Circulation and Parking The proposal satisfies the applicable Access, Circulation and Parking standards, including the following: Allowable number of parking spaces. The development proposal satisfies the parking allowances for non-residential uses as set forth in Section 3.2.2(K)(2) of the LUC for the c-store and fast food restaurant uses in this project. There will be 14 parking spaces on the site, including one handicapped space, for the 4,400 East Ridge C-Store, Project Development Plan, #33-98G December 6, 2007 - Planning & Zoning Board Public Hearing Page 2 Standards located in Division 3.2 - Site Planning and Design Standards, Division 3.3 - Engineering Standards, Division 3.5 - Building Standards, and Division 3.6 - Transportation and Circulation of ARTICLE 3 - GENERAL DEVELOPMENT STANDARDS; The applicable district standards located in ARTICLE 4 - DISTRICT STANDARDS of the LUC (Division 4.5 LMN - Low Density Mixed -Use Neighborhood Zoning District). COMMENTS: 1. Background: The surrounding zoning and land uses are as follows: N: LMN; undeveloped E: LMN; undeveloped S: LMN; undeveloped W: O - Open in Larimer County; existing residential (Collins Aire Park) The property was annexed as part of the East Ridge Annexation in February, 2002 and the East Ridge Second Annexation in October, 2005. The property is part of the East Ridge, Overall Development Plan (ODP) that was approved by the Planning and Zoning Board on January 20, 2005. The subject property is being subdivided as Tract W of the East Ridge, PDP & Final Plan. Tract W, being 0.96 acre in size, is part of a larger neighborhood center (4.26 acres) consisting of Tracts D, E, V, and W of the East Ridge, PDP that was approved by the Administrative Hearing Officer on January 20, 2006. 2. ARTICLE 2 - ADMINISTRATION Section 2.2.2. Step 2: Neighborhood Meetings The proposed development is for a convenience store with fuel sales and a fast food restaurant (without drive-in or drive through), which are permitted uses in a neighborhood center in the LMN - Low Density Mixed -Use Neighborhood Zoning District, subject to a Planning & Zoning Board (Type 2) review and public hearing. The LUC does require that a neighborhood meeting be held for development proposals that are subject to a Planning and Zoning Board (Type 2) review. A neighborhood meeting was held on June 23, 2004, during the development review process for the East Ridge, ODP. This proposal is in conformance with the approved ODP (January 20, 2005) that ITEM NO. 2 MEETING DATE 12 / 6 / 0 7 6a STAFF Steve Olt OKUK An City of Fort Collins PLANNING AND ZONING BOARD STAFF REPORT PROJECT: East Ridge C-Store, Project Development Plan (PDP) - #33-98G APPLICANT: Jim Sell Design, Inc. c/o Matt Blakely 153 West Mountain Avenue Fort Collins, Colorado 80524 OWNER: East Ridge of Fort Collins, LLC 4190 North Garfield Avenue Loveland, CO. 80538 East Ridge of Fort Collins, LLC P.O. Box 40 Timnath, CO. 80547 PROJECT DESCRIPTION: This is a request for convenience store (c-store) with fuel sales and fast food restaurant (without drive-in or drive -through) uses in a neighborhood center on 0.96 acre. The PDP consists of a 4,400 square foot building containing a c-store and a fast food restaurant; a detached canopy with 4 fuel islands underneath; and, a detached 850 square foot automatic self -serve car wash building. This proposed project is located on the northeast corner of the intersection of Sykes Drive and North Timberline Road, within the East Ridge overall development plan. The property is zoned Low Density Mixed -Use Neighborhood (LMN). RECOMMENDATION: Approval EXECUTIVE SUMMARY: The proposal is in conformance with the East Ridge, Overall Development Plan (ODP) approved by the Planning & Zoning Board on January 20, 2005. The East Ridge C-Store, PDP proposal complies with the applicable requirements of the Land Use Code (LUC), more specifically: the process located in Division 2.2 - Common Development Review Procedures for Development Applications of ARTICLE 2 - ADMINISTRATION; COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. P.O. Box 580 Fort Collins, CO 80522-0580 (970) 22 I PLANNING DEPARTMENT '; 1 o is I _ .. _.. _ HC {{1_ -. f tS _ O ICL L SHIFT DRfVEWIA, TO THE EAST AS NEC133SARY I CLEARANCE FR1 164' INTERSECTION OFTIMBERLM. TU CL OF DRIVE 3 S' ADDITIONAL ROW REQUftD. RIGHT AND THRU LEFT TURN LANE ----AN SYKES DRIVE (MINOR COLLECTOR) j7- MEDIAN -0. TRAVEL APPENDIX A customers will learn that, during the peak hours, exiting via Vicot Way will be more efficient. During other hours of the day, there should not be a concern at this location. It is respectfully requested that a variance to the spacing standard from 175 feet to 164 feet.be granted. This reduction of nine feet will not be detrimental to the public health, welfare, and safety. The raised median on Sykes Drive will positively create a right-in/right-out access to the gas/convenience store. Do not hesitate to contact me if you have questions or desire additional information. Sincerely, oP"no � G/. e Matthew J. Deli h �VAL.i DELICH ASSOCIATES Traffic & Transportation Engineering 2272 Glen Haven Drive Loveland, Colorado 80538 Phone: (970) 669-2061 Fax: (970) 669-5034 "7 August 1, 2007 File: 0245LT01 Mr. Eric Bracke, P.E. Fort Collins Traffic Operations P.O. Box 580 Fort Collins, CO 80522-0580 Dear Eric: This letter is a variance request for the spacing between a driveway to/from a gas/convenience store and Timberline Road, along Sykes Drive, within the East Ridge development. A site plan is provided in Appendix A. Sykes Drive is considered to be a minor collector street. According to Table 7-3 in the Larimer County Urban Area Street Standards, the distance between a high volume driveway and a street intersection is 175 feet, on -centers. The distance shown is 164 feet. As shown on the site plan, Sykes Drive will have a raised median from Timberline Road to Vicot Way. This median will prevent left -ins and left -outs at the subject driveway. The primary issue related to the driveway location is that a number, of right -turning egressing vehicles from the subject driveway will desire to get into the westbound left -turn lane approaching Timberline Road. If there are more than two vehicles in the left -turn lane, a vehicle exiting the subject driveway will not be able to get to the back of the left -turn queue. IAnalyses in the "East Ridge Transportation Impact Study" indicate that the left -turn queue will be. approximately five vehicles during the peak hours. This would indicate that exiting vehicles from the subject driveway could not get into the left -turn lane during the peak hours. However, experience would indicate that there would be periods of time, during the peak hours, when there would be less than two vehicles in the left -turn lane, especially when/if this intersection is signalized and the traffic on Sykes Drive clears. At times when the left -turn queue extends beyond the driveway, it is likely that the right -turn lane queue would also extend beyond the driveway. At these times, vehicles exiting the subject driveway could not get on Sykes, Drive. The delays to the exiting vehicles would be within the gas/convenience store property and would not negatively impact the operation of Sykes Drive. Exiting vehicles also have the alternative of using Vicot Way, which is over 220 feet from the stop bar on Sykes Drive. Based upon the operational analyses, the queue on Sykes Drive will not extend to Vicot Way. With this alternative route, these vehicles can enter either westbound lane on Sykes Drive. It is recommended that a sign be posted at the subject driveway stating that "exiting vehicles should not block Sykes Drive." Since this land use will primarily serve East Ridge and the nearby area, HCM Signalized Intersection Capacity Analysis short total ' 6: Vine & Lemay HCM Signalized Intersection Capacity Analysis Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ►i '* Vi T+ 44 4+ Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.97 1.00 0.94 0.97 0.99 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.99 Satd. Flow (prat) 1770 1815 1770 1757 1803 1832 Fit Permitted 0.28 1.00 0.28 1.00 0.95 0.75 Satd. Flow (perm) 516 1815 526 1757 1713 1382 Volume (vph) 83 290 59 121 205 125 47 672 204 98 468 39 Peak -hour factor, PHF 0.91 0.91 0.91 0.85 0.85 0.85 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 91 319 65 142 241 147 49 707 215 103 493 41 RTOR Reduction (vph) 0 10 0 0 29 0 0 19 0 0 2 0 Lane Group Flow (vph) 91 374 0 142 359 0 0 962 0 0 635 0 Turn Type Penn Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 21.3 21.3 21.3 21.3 44.5 44.5 Effective Green, g (s) 22.3 22.3 22.3 22.3 45.5 45.5 Actuated g/C Ratio 0.29 0:29 0.29 0.29 0.60 0.60 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 152 534 155 517 1028 830 v/s Ratio Prot 0.21 0.20 v/s Ratio Perm 0.18 c0.27 c0.56 0.46 v/c Ratio 0.60 0.70 0.92 0.69 0.94 0.76 Uniform Delay, d1 22.9 23.8 25.8 23.7 13.8 11.2 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 6.2 4.1 47.9 4.0 16.3 6.6 Delay. (s) 29.1 27.9 73.7 27.8 30.1 17.8 Level of Service C C E C C B Approach Delay (s) 28.1 40.1 30.1 17.8 Approach LOS C D . C B Intersection Summa HCM Average Control Delay 28.8 HCM Level of Service C HCM Volume to Capacity ratio 0.93 Actuated Cycle Length (s) 75.8 Sum of lost time (s) 8.0 Intersection Capacity Utilization 99.1% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Joseph Matthew J. Delich P. E. 3/15/2007 Page 2 HCM Signalized Intersection Capacity Analysis short total 3: Vine & Lemay HCM Signalized Intersection Capacity Analysis r l r Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ►j j, . A . 4+ 4+ Ideal Flow (vphpq 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.6 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.94 1.00 0.95 0.98 0.99 Fft Protected 0.95 1.00 0.95 1.00 1.00 1.00 Said. Flow (prot) 1770 1754 1770 1777 1815 1830 Fit Permitted 0.17 1.00 0.57 1.00 0.95 0.93 Said. Flow (perm) 322 1754 1065 1777 1734 1711 Volume (vph) 27 99. 63 187 261 116 20 287 64 65 560 66 Peak -hour factor, PHF 0.91 0.91 0.91 0.85 0.85 0.85 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 30 109 69 220 307 136 21 302 67 68 589 69 RTOR Reduction (vph) 0 26 0 0 19 0 0 8 0 0 4 0 Lane Group Flow (vph) 30 152 0 220 . 424 0 0 382 0 0 722 0 Turn Type Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 23.7 23.7 23.7 23.7 53.1 53.1 Effective Green, g (s) 24.7 24.7 24.7 24.7 54.1 54.1 Actuated g/C Ratio 0.28 0.28 0.28 0.28 0.62 0.62 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.6 3.0 3.0 3.0 Lane Grp Cap (vph) 92 499 303 506 1081 1066 v/s Ratio Prot 0.09 c0.24 v/s Ratio Perm 0.09 0.21 0.22 c0.42 v/c Ratio 0.33 0.30 0.73 0.84 0.35 0.68 Uniform Delay, d1 24.5 24.3 28.0 29.2 7.9 10.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.1 0.3 8.4 11.6 0.9 3.5 Delay (s) 26.6 24.7 36.4 40.8 8.8 14.1 Level of Service C C D D A B Approach Delay (s) 24.9 39.3 8.8 14.1 Approach LOS C D A B -Intersection Summa HCM Average Control Delay 22.6 HCM Level of Service C HCM Volume to Capacity ratio 0.73 Actuated Cycle Length (s) 86.8 Sum of lost time (s) 8.0 Intersection Capacity Utilization 89.8% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group Joseph 3/15/2007. Matthew J. Delich , P. E. Page 1 No Text HCM Signalized Intersection Capacity Analysis 6: Vine & Lemav reen sho long bkgdq . figure 4 am Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T* rj 1. 4* 4; Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Fri 1.00 0.97 1.00 0.94 0.97 0.99 Fit Protected 0.95 1.00 0.95 1.00 1.00 0.99 Satd. Flow (prot) 1770 1815 1770 1757 1803 1832 Flt Permitted. 0.28 1.00 0.28 1.00 0.95 0.75 Satd. Flow (perm) 516 1815 526 1757 1714 1382 Volume (vph) 83 290 59 120 205 125 47 672 203 98 468 39 Peak -hour factor, PHF 0.91 0.91 0.91 0.85 0.85. 0.85 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph). 91 319 65 141 241 147 49 707 214 103 493 41 RTOR Reduction (vph) 0 10 0 0 29 0 0 9 0 0 2 0 Lane Group Flow (vphy 91 374 0 141 359 0 0 961 0 0 635 0 Turn Type Penn Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 21.3 21.3 21.3 21.3 44.5 44.5 Effective Green, g (s) 22.3 22.3 22.3 22.3 45.5 45.5 Actuated g/C Ratio 029 0.29 0.29 0.29 0.60 0.60 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 152 534 155 517 1029 830 v/s Ratio Prot 0.21 0.20 v/s Ratio Perm 0.18 c0.27 c0.56 0.46 v/c Ratio 0.60 0.70 0.91 0.69 0.93 0.76 Uniform Delay, d1 22.9 23.8 25.8 23.7 13.8 11.2 Progression Factor 1.00 1.00 1.00 1.60 1.00 1.00 Incremental Delay, d2 6.2 4.1 46.1 4.0 16.0 6.6 Delay (s) . 29.1 27.9 71.8 27.8 29.8 17.8 Level of Service C C E C C B Approach Delay (s) 28.1 39.5 29.8 17.8 Approach LOS C D C B Intersection Summary HCM Average Control Delay 28.5 HCM Level of Service C HCM Volume to Capacity ratio 0.93 Actuated Cycle Length (s) 75.8 Sum of lost time (s) 8.0 Intersection Capacity Utilization 99.0% ICU Level of Service F Analysis Period (min) 15 c Critical Lane Group Joseph Matthew J_ Delich , P. E_ 3/6/2006 Page 1 IT HCM Signalized Intersection .Capacity. Analysis recen ho ong bkg total 3: Vine & Lemay figure a am pm r Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations t• t. 4t Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Fri 1.00 0.94 1.00 0.95 0.98 0.99 Fit Protected 0.95 1.00 0.95 1.00 1.00 1.00 Satd. Flow (prot) 1770 1754 1770 1777 1814 1830 Fit Permitted 0.17 1.00 0.57 1.00 0.95 0.93 Said. Flow (perm) 322 1754 1065 1777 1734 1711 Volume (vph) 27 99 63 187 261 116 20 287 65 65 560 66 Peak -hour factor, PHF 0.91 0.91 0.91 0.85 0.85 0.85 0.95 0.95 0.95 0.95 0.95 0.95 Adj. Flow (vph) 30 109 69 220 307 136 21 302 68 68 589 69 RTOR Reduction (vph) 0 26 0 0 19 0 0 8 0 0 4 0 Lane Group Flow (vph) 30 152 0 220 424 0 0 383 0 0 722 0 Turn Type Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 .6 Actuated Green, G (s) 23.7 23.7 23.7 23.7 53.1 53.1 Effective Green, g (s) 24.7 24.7 24.7 24.7 54.1 54.1 Actuated g/C Ratio 0.28 0.28 028 0.28 0.62 0.62 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 92 499 303 506 1081 1066 v/s Ratio Prot 0.09 c0.24 v/s Ratio Perm 0.09 0.21 0.22 c0.42 v/c Ratio 0.33 0.30 0.73 0.84 0.35 0.68 Uniform Delay, d1 24.5 24:3 28.0 29.2 7.9 10.7 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 2.1 0.3 8.4 11.6 0.9 3.5 Delay (s) 26.6 24.7 36.4 40.8 8.8 14.1 Level of Service C C D D .- A B Approach Delay (s) 24.9 39.3 8.8 14.1 Approach LOS C D A B Intersection Summa HCM Average Control Delay 22.6 HCM Level of Service C HCM Volume to Capacity ratio 0.73 Actuated Cycle Length (s) 86.8 Sum of lost time (s) 8.0 Intersection Capacity Utilization 89.8% ICU Level of Service E Analysis Period (min) 15 c Critical Lane Group . Joseph Matthew J. Delich , P. E. 3/6/2006 Page 1 16 No Text SYKES DRIVE P EAST VINE DRIVE . . �n gem rw�ws wra. eeer aauwe, w wxe pro u� Dui .0 rro.se vas Q m BARNSTORMER _ STREET cc O J < Wuj O U o x / z Z 3 z' O J H / CC a O u LL 3 PROJECT SITE CONQUEST STR - — L O_ O< O —S 3 - 2 ul m 1 a N SYKES DRIVE _ SYKES DRIVE 8 .� �F KAT,� S TRF� a�Q.h y1� Oraudng Name - CAP fY[s Name Drawn Deelgned 4 - meew wwr \/"� � V"e ked Date 0� Revi.+ed V V A'aj¢ct ' 1ue Number o 1w 2W 4W i SAeet - - _ I Of ' 13 No Text 3: Vine & Timberline Recent. PM 10i6i2006 � -♦ � � � � 1 t t � 1 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4� 44 Sign Control Stop Stop Stop Stop Volume (vph). 70 168 61 40 146 9 110 197 71 4 127 35 Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.85 0.85 0.85 0.86 0.86 0.86 Hourly flow rate (vph) 81 195 71 47 170 10 129 232 84 5 148 41 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total (vph) 348 227 445 193 Volume Left (vph) 81 47 129 5 Volume Right (vph) 71 10 84 41 Hadj (s) -0.04 0.05 -0.02 -0.09 Departure Headway (s) 6.6 7.0 6.3 6.9 Degree Utilization, x 0.64 0.44 0.78 0.37 Capacity (veh/h) 501 450 538 442 Control Delay (s) 20.3 15.3 28.3 13.9 Approach Delay (s) 20.3 15.3 28.3 13.9 Approach LOS C C D B Intersection Summary Delay 21.3 HCM Level of Service _C Intersection Capacity Utilization 62.9% ICU Level of Service B Analysis Period (min) 15 Synchro 6 Light Report Matthew J. Delich , P. E. Page 1 it 3: Vine & Timberline Recent AM 10/6/2006 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR . SBL SBT SBR Lane Configurations +T, 41, 41, Sign Control Stop Stop Stop Stop Volume (vph) .. 20 90 74 75 119 A 38 51 20 6 184 47 Peak Hour Factor 0.94 0.94 0.94 0.85 0.85 0.85 0.94 0.94 0.94 0.85 0.85 0.85 Hourly flow rate (vph) 21 96 79 88 140 1 40 54 21 7 216 55 Direction, Lane # EB 1 WB 1 NB 1 SB 1 Volume Total (vph) 196 229 116 279 Volume Left (vph) 21 88 40 7 Volume Right (vph) 79 1 21 55 Hadj (s) -0.19 0.11 -0.01 -0.08 Departure Headway (s) 5.2 5.4 5.5 5.2 Degree Utilization, x 0.28 0.34 0.18 0.40 Capacity (veh/h) 636 618 578 648 Control Delay (s) 10.2 11.2 9.7 11.6 Approach Delay (s) 10.2 11.2 9.7 11.6 Approach LOS B B A B Intersection Summary Delay 10.9 HCM Level of Service B Intersection Capacity Utilization 53.0% ICU Level of Service A Analysis Period (min) 15 Matthew J. Delich , P. E_ Synchro 6 Light Report Page 1 HCM Signalized Intersection Capacity Analysis 6: Vine & Lemay recent pm 4% f Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations I A 4 4 Ideal Flow (vphpD 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1000 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.96 1.00 0.93 0.99 1.00 " Fit Protected ' 0.95 1.00 0.95 1.00 1.00 0.99 Satd. Flow (prot) 1770 1783 1770 1733 1830 1842 Fft Permitted . 0.32 1.00 0.39 1.00 0.92 0.82 Satd. Flow (perm) 599 1783 730 1733 1693 .1522 Volume (vph) 26 167 66 37 143 123 57 599 74 75 452 18 Peak -hour factor, PHF 0.85 0.85. 0.85 0.85 0.85 0.85 0.88 0.88 0.88 0.90 6.90 0.90 Adj. Flow (vph) 31 196 78 44 168 145 65 681 84 83 502 20 RTOR Reduction, (vph) 0 21 0 0 45 0 0 3 0 0 1 0 Lane Group Flow (vph) 31 253 0. 44 268 0 0 827 0 0 604 0 Turn Type Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 15.5 15.5 15.5 15.5 44.2 44.2 Effective Green, g (s) 16.5 16.5 16.5 16.5 45.2 45.2 " Actuated g/C Ratio 0.24 0.24 0.24 0.24 0.65 0.65 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0. 3.0 Lane Grp Cap (vph) 142 422 173 410 1098 987 v/s Ratio Prot 0.14 c0.15 v/s Ratio Perm 0.05 0.06 c0.49 0.40 v/c Ratio 0.22 0.60 0.25 0.65 0.75 0.61. Uniform Delay, d1 21.4 23.7 21.6 24.0 8.4 7.1 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental.Delay, d2 0.8 2.4 0.8 3.7 4.8 2.8 Delay (s) 22.2 26.1 22.4 27.7 13.2 10.0 Level of Service C C C C B A Approach Delay (s) 25.7 27.1 13.2 10.0 Approach LOS C C B A Intersection Summary HCM Average Control Delay 16.4 HCM Level of Service B HCM Volume to Capacity ratio 0.73 Actuated Cycle Length (s) 69.7 Sum of lost time (s) 8.0 Intersection Capacity Utilization 74.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Joseph 3/15/2007 Matthew J. Delich , P. E. G� Page 1 HCM Signalized Intersection Capacity Analysis 3: Vine & Lemay recent am Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations ►j T4 V A 44 4+ Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 1.00 0.94 1.00 0.95 0.99 0.99 Fit Protected 0.95 1.00 0.95 1.00 1.00 1.00 Said. Flow (prot) 1770 1756 1770 1763 1836 1840 Fit Permitted 0.32 1.00 0.54 1.00 0.94 0.93 Satd. Flow (perm) 596 1756 998 1763 1737 1726 Volume (vph) 8 100 61 54 159 88 20 279 27 61 570 37 Peak -hour factor, PHF 0.89 0.89 0.89 0.85 0.85 0.85 0.85 0.85 0.85 0.89 0.89 0.89 Adj. Flow (vph) 9 112 69 64 187 104 24 328 32 69 640 42 RTOR Reduction (vph) 0 28 0 0 25 0 0 3 0 0 2 0 Lane Group Flow (vph) 9 153 0 64 266 0 0 381 0 0 749 0 Turn Type Perm Perm Perm Perm Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Actuated Green, G (s) 16.9 16.9 16.9 16.9 53.5 53.5 Effective Green, g (s) 17.9 17.9 17.9 17.9 54.5 54.5 Actuated g/C Ratio 0.22 0.22 0.22 0.22 0.68 0.68 Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 Lane Grp Cap (vph) 133 391 222 393 1177 1170 v/s Ratio Prot 0.09 c0.15 v/s Ratio Perm 0.02 0.06 0.22 cOA3 We Ratio 0.07 0.39 0.29 0.68 0.32 0.64 Uniform Delay, d1 24.7 26.6 26.0 28.6 5.3 7.4 Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 Incremental Delay, d2 0.2 0.6 0.7 4.6 0.7 2.7 Delay (s) 24.9 27.3 26.7 33.2 6.1 10.1 Level of Service C C C C A B Approach Delay (s) 27.1 32.0 6.1 10.1 Approach LOS C C A . B Intersection Summa HCM Average Control Delay 15.7 HCM Level of Service B HCM Volume to Capacity ratio 0.65 Actuated Cycle Length (s) 80.4 Sum of lost time (s) 8.0 Intersection Capacity Utilization 78.4% ICU Level of Service D Analysis Period (min) 15 c Critical Lane Group Joseph 3/15/2007 Matthew J. Delich , P. E. f,. Page 1 No Text MATTHEW J. DELICH, P.E. 2272 GLEN HAVEN DRIVE LOVELAND, CO 80538 Phone: (970)669-2061 TABULAR SUMMARY OF VEHICLE COUNTS Date: 8/1012006 Observer: Joe Day: Thursday Jurisdiction: Fort Collins R = right turn F—Intersection: Vine / Timberline S = straight L = lett turn Time Northbound: Southbound: Total Eastbound: Westbound: Total Total L S R Total L 8 R Total L 8 R Total L S R Total Begins northlsouth east/west All 7:30 11 16 2 2 55 18 75 104 6 17 16 25 35 0 so 99 2 03. 7:45 8 133 8 il?J ��!I§ 1 55 11 96 4 22 21 47 1 17 37 1 102 10 1 i 8:00 1 13 3 1 36 9 dd- 73 5 23 21 4 18 30 0 97 170 8 9 9 7 2 38 ,49 -1 73 5 5 28 16 15 17 0 3.2 81 154 i il!!i 7:30-8:30 51 20', " `109 237 346 it 2 90::� 44:':! 84 75:11ti" 195 379 PHI 0.94 0.79 0.94 0.81 LE 4:30 41 48 15 ... 10 : I 1 1 38 1 8 Ij 4 j! 7.. - , I 151 17 54 16 i� 1:1 � 87if .i 12 43 2 1'' .1;! 57 144 4:45 23 43 22 88 2 29 6 125 .21 32 20 :1� 13!1� : ;I 9 37 47. 120 245 1 5:00 34 67 15 1; A 41i 0 37 11 11 164 16 52 7 6 34 3 41 118 282, it 5:115 12 1 39 19 j4Y 1 23 10 K! 16 30 18 13' 32 3 112 4:30-5:30 iW! 119 ;. t� 1Ej 378 1 166 6 E 544 , 299 9::: 195 494 :103 PHFJ 0.81 0.86 6 0.86 2007/FEB/22/THU 07:19 AM TRAFFIC OPERATIONS FAX No.970 221 6262 P.007 City of Fort Collins Traffic Operations M Unden Street. PO Box 5t30 Fort Col ins, CO W522-MW North/South Street Lemay Turning Movement Study File Name : Lemay & Virw 2-21-07 EestANest Street: Vine Site Code : 000W127 Time: PM Start bate : 2/21/2007 ICU Number. 127 Page No : 2 y� La,n.y me gpphb�A 1Nedboand Northbound Eastbound eyr 1Mu Left Pom tiv -FIRM 11+u. I Left I Ptm agt 71ru 'Left Pd@ ror RVi Mn Left I Mae FM* -HOW Arla)YUS Rom 04:30 PM t0 06:15 PU - Peak 1 Of 1 Peak Hour f Yr Each aech Reaft at +0 mtrts. mom 4 117 10 ' 0 131 -35 9 0 69 17 129 11 0 15T oa 14 14 37 5 0 56 +15 Nn& 4 117 26 0 141 .25 40 37 8 0 85 22 148 9 ' 0 179 18 .S1 . 7 0 76. T. 0 65 ' +30 firs 5 124 23 0 .152 18 31 3 0 52 . 19 170 19 0 208 13 45 " 7 0 82 +45 ft s. 5 94 0 115 545 40 40 17 0 123 U3 37 16 152 18 74 57 0 0 188 730 21' 34 86 167 28 0 250 TcWud� x .18 452 75 3.3 6ZO 13.8 0 0 - 40.6 472 122 0 10.1 W-1 7.a 0 25.5. 64.5 10 0 - .7oLd PFiFSW.e11 .000 .ag8 .766 .ON _W .oW 1 .841 1 . 50 '.000 .577 Ja5 1 .020 ..ow .852 i 2007/FEB/22/THO 07:19 AM TRAFFIC OPERATIONS FAX No.970 221 6282 City of Fort Collins Traffic Operations 626 Linden Street, PO Box 580 Fat Collins, CO 80522-0580. NorttdSouth.Street Lemay Turning Movement Study East/West Street: Vme . Tme: PM ICU Number: 127 P. 006 File Name Lemay & Vim 2-21-07 Site Code :00000127 Start Date : 2/21/2007 Page No : 1 SOuthbound WestbWnd Vow. - - - - Northbound ��y vM0 Eastbound start rati Tlev Lett Peas .. TMu Loft Pack Tfty Loft Pam »;.. T1tu Lelt P� r ss a scan .30 PM' 04.46 PM 4 11T 1 0 4 117 26 . 0' t31 747 25 35 40 37 8 . 8 0 0 69 85 17 129 22 148 11 9 0 0 157 1791 1 S 0 78 51 7 0 58. 78 473 . 487 234 38 0. 278 65 7-2 17 0 154 39 277 20 0 338 8 1 0 32 88. 132 .900 05:00 PM 5 '124 23 ' 0 162 18, 31 3 0. - 52 19 170. 19 0 208 13 '45 7 0 e5 477 05:15 PM 5 84 18 0 115 40 40 17 0 97 18 152 18 0 186 21 34 . 7 0 _.62 460 Ordd Toed 18 452 T5 0 545 123 143 37 0 303 74 599 57 0 T30 66 167 26 0 259 1837 Apprch % 3.3 829 13.8 0 4" 47.2 122 D 10.1 B21 7.a 0 25.5 64.5 10 0 . Told % 1 24.6 '4.1 o 29.7 . 6.7 7.8 2 0 1e_5 4 328 3.1 '0 39-7 3.6 9.1 1.4 0 14.1 2007/FEB/22/THU 07:19 AM TRAFFIC OPERATIONS FAX No.970 221 6282 P.003 City of Fort Collins Traffic Operations 626 Linden Street. PO Box 580 FortCoNeis, CO 80522-D580 No&vSouth street Lemay . Tuming Movement Study File Name : Lemay 3 Vine 2-21-07 East/West Street: vine Site Code : 00000127 Time: AM Start bate :212V2007 ICU Number: 127 ' Page No : 2 Vine.. Lcmay virm Southbound westbound Nartfibarld Eastbwnd Smart � Thin Laft Path r� re�put Thru Lr1t. Peas rw. RaAt 11.v LCR Peen ,`.,..: ;NUN I" LeftP*ft r•.. Mt>w Peak Hour Analpis From 07:30AMIOUVIS AM - eak 1 of 1 . , .P Hoturfor Eadi ' at: •0 mbm - 10 165 13 0 IN�18 27 .13 - 0 58 8 65 . 1 0 74 MOM 19 ' 27 1 0 47 +15 rains: 11 151 . '19 0 181 31 45 - 13 0 .89 9, a5' 5 0 99 •18. 29 0 .1 -48 . +30 mins. 8 110. ' 14 0 132 24 '50 15 .. 0- 89 8 66 8 0 82 13 21 3 0 37 +45 mins. 8 15 1 _ i8B 15 37 13 0 65 2 63 8 0 71 11 23 4 0 38' Teta Vdu ro 37 570 61. '1 88 156 0 Sot 27 279 20 0 328 81 100' 8 1 170 . x App,Tar 5.5 852 9.1 0.1 292' 52"8 17-0 0 .8.3 85-8 6.1 0 35.9 56.8 4.7 0.6 .. PHF -541 MA W3 , 250 .890 .710 .795 .845 .750 .921 .625 .000 -803 .Bll2 -5m -250 M . j. . 2007/FEB/22%THU 07:19 AM TRAFFIC OPERATIONS FAX Na•970 221 6282 City of Fort Collins Traffic Operations ' 626 Lilden Street, PO Box 580 Fort Coilins, CO 80522-0580 wlevsOuth sueet.Lemay Turning Movement Study East/West Street: Vine Time: AM ICU Number. 127 P. 002 File Name _ Lemay & Mile 2-21. 07 Site Code : 00000127 Start Date : 2/21/2007 Page No .. :1 loyal n aw ac v 0&00 AM 8 110' "14 0 132 24 50 15 0 80 8 fits 8 0 82 71 13 21 3 4 0. 0 37 38 340 342 08:15 AM 8. 144 15 1 168 -15. 37" 13 0 65 2 63. 27 279 8 20. 0 0 11 81 23 100 8 - 1 170 1466 ` Grog otal °l. 37 570 61 1 969 t18 293 159 5ZB 54 17.9 0 D 301 8.3 95.8 6.1 0 .328 35:9 58.8 4.7 0:6 gpprrh 7oW 1L 5.5 2.5 852 3&9 "e.t 4.2' Al 0.1 45.8 6 10.5 3.7 0 20.5 1.8 19' . 1.4 .0 . 222 4.2 .8 0.5 0.1 11.6 No Text TABLE 3 Short Range (2010) Total Peak Hour Operation With Approved Projects Plus Build Out of East Ridge F TA �S M1�: Y S I &.i .1 i'J i i Inteirsection f } q V5J Rs YM n i AAovemerrt � tt ><.JY.I f t75 ft .r G f .+ C "Vel O. S6N�C9 > C'h'A YtL Ue�( w, IAA aAWF Y rv� ii� S Y i PM; p a3s s Vine/Lemay (signal) EB LT C 26.6 C 29.1 EB T/RT C 24.7 C 27.9 EB APPROACH C 24.9 C 28.1 WB LT D 36.4 E 71.8 WB T/RT D 40.8 C 27.8 WB APPROACH D 39.3 D 39.5 NB LT/T/RT A 8.8 C 29.8 SB LT/T/RT B 14.1 B 17.8 OVERALL I C 22.6 C 28.5 TABLE 4 Short Range (2010) Total Peak Hour Operation With Approved Projects Plus Build Out of East Ridge With Convenience/Gas Store on Parcel B ;'• Fiit � '{1W 4 �-`_`y,l�i ��ntav$a�' F��+ � Zvi"r" y ?'fIf ', '"e'er a-4� is;u -r.fa ,+ ,,w,'F c_ �p .. t r '•;7 P 4.� tix , t s•'4 r i v �,/ a ;4 i �4Y � t t } `4tvS Le�Q1 � a�o� .� 5i *''Y � ✓ s 1�. 5.�. i r `,"ai'�' •r�,�+ i-� i ': z"'� IIIiCiV@F17e`i1� � nX, Zr t ,. 3i r� Intersect�.on�_; EB LT C 26.6 C 29.1 EB T/RT C 24.7 C 27.9 EB APPROACH C 24.9 C 28.1 Vine/Lemay (signal) WB LT D 36.4 E 73.7 WB T/RT D 40.8 C 27.8 WB APPROACH D 39.3 D 40.1 NB LT/T/RT A 8.8 C 30.1 SB LT/T/RT B 14.1 B 17.8 OVERALL C 22.6 C 28.8 N vrnco m � 0 116/125 co `° co - 261 /205 187/121 27/83 --)� Vine Drive t I (� 99/290 63/59 1-- N v N .m Go to N �— AM/PM 2010 TRAFFIC VOLUMES WITH APPROVED PROJECTS PLUS BUILD OUT OF EAST RIDGE WITH CONVENIENCE/GAS STORE ON PARCEL B Figure 6 m c a� Q m E a� co rn v co co 0 0 116/125 co to`O U') CO f 261/205 187/120 27/83 1 1. 99/290 ^I N IM 63/59 g m N N coLO coo N f AM/PM d Vine Drive 2010 TRAFFIC VOLUMES WITH APPROVED PROJECTS PLUS BUILD OUT OF EAST RIDGE Figure 5 Q ca E. J CHANGE IN PEAK HOUR TRAFFIC - DUE TO CHANGE OF LAND USE. U A N Figure 4 v o Q E J SITE GENERATED PEAK HOUR TRAFFIC OF PARCEL B WITH CONVENIENCE/GAS STORE LAND USE N Figure 3 w ca O Q E E J F A& N SITE GENERATED PEAK HOUR TRAFFIC OF PARCEL B WITH RETAIL LAND USE Figure 2 TABLE 1 Current Peak Hour Operation ,;fir �o tYY,,ti� y , ur 5 r v ✓yr �,T Y i� v yl A r a7. A4 ri6F" t t "r- v .v' 'C j�/�pt y T, vC /►} k 1 ...) 7e•Y�t t s .h,x ,} lntersection�(! �� "?, f.�'+nb n�vl Il ip "'r o! x j �v�w� iAA.��t1���.�'.�{{e�4'r'� M, i", lit I I�dC i� y l F 7 1C()f'C Y, ".'li.�l.}%�1...{^�'... ir•a, Ml' Q 1 } fY ,rJ 9 K ^Y (signaal)l) Vine EB LT C C EB T/RT C C EB APPROACH C C WB LT C C WB T/RT C C WB APPROACH C C NB LTIT/RT A B SB LT/T/RT B A OVERALL B B Timberline/Vine (stop sign) EB LT/T/RT B C WB LT/T/RT B C NB LTIf/RT A D SB LTrr/RT B B OVERALL B C TABLE 2 Trip Generation K�AWDTEh !�: - bfAM,PeaksHau t PM PeakHoury - --Cade; +..GKr Tr}a Ttif-1 —:lp -0 ...J+ .w 946 Convenience/Gas Store 8 positions 152.84 1220 1 5.43 1 43 15.21 1 42 16.67 1 53 16.67 53