DATE: 9-20-95
PROJECT: Cetacean Minor Subdivision
COMMENTS
* No Traffic Study or Soils Report submitted -
PLAT
1. There is a discrepancy in the width of the Utility Easement along the North
property line. The Plat indicates a 12' easement and the Site plan indicates a 15'
easement.
SITE and LANDSCAPE PLAN
1. See comment 1., PLAT.
2. Provide access ramps in the sidewalks as shown on the plan.
3. The 2 - 4" drainage pipes crossing the West property line should be dashed
lines indicating existing piping.
UTILITY. GRADING and DRAINAGE PLAN
1. See comments 2 and 3, SITE and LANDSCAPE PLAN.
2. Need to show all existing and proposed easements on the Utility Plan. See red
comments on the plan for examples.
3. Need to show the detention basin on the Utility Plan and designate as a
Drainage and Access Easement.
4. The area along the West property line needs to be designated as a Drainage
Easement due to the extension of the 2 - 4" PVC drainage pipes.
5. The Drainage Report says the 2 - 4" PVC pipes will be extended to Harvard
Street. The Drainage Plan does not indicate the same intention. Please bring the
two into agreement.
6. Need to indicate on the plan where Sections A -A and B-B pertain to and also
provide a view of section C-C.
PROJECT
' City of Fort Collins COMMENT SHEET
CurrentPlanning
DATE; 7 September 1995 DEPARTMENT: LNG
PROJECT: #42-95 Cetacean Minor Subdivision (Scuba Colorado)
PLANNER: Mike Ludwig
All comments must be received by: Friday, 22 September
❑ No Problems
❑Problems or Concerns (see below)
4 e �
Date: 9 12o Signature: // xj��j
CHECK IF YOU WISH TO RECEIVE v ❑ PL f
COPIES OF REVISIONS: ❑ SITE
❑ LANDSCAPE
❑ UTILITY
COMMUNITY PLANNING and
ENVIRONMENTAL SERVICES... 281 NORTH COLLEGE, P.O.BOX 580 FORT COLLINS, COLORADO 80522-0580 (303)221-6750
CURRENT PLANNING DEPARTMENT V//
PROJECT
rt Citv of Fort Collins
COMMENT SHEET
CurrentPianning
DATE: 7 September 1995 DEPARTMENT: MRtAWA7VR
PROJECT: #42-95 Cetacean Minor Subdivision (Scuba Colorado)
PLANNER: Mike Ludwig
All comments must be received by: Friday, 22 September
❑ No Problems
/Problems or Concerns (see below)
Please provide stage vs. storage calculations for the on -site detention pond. Please provide
a detention summary table, on the drainage plan, that shows the required volume, volume
provided, release rate, and HWL.
A drainage easement.must be dedicated for the detention pond.
Please show more details of off -site areas. Off -site contours should be shown to verify any
off -site flows entering or exiting the site.
Please provide more details of the detention outlet from the property to the west. How will
this system tie into the proposed system? Please show a detail of the intersection between
the existing pipe and the proposed pipe.
Date: 012e2 Signature: /a - �l .
CHECK IF YOU WISH TO RECEIVE ❑ PLAT �j1pr;m�
COPIES OF REVISIONS: ❑ SITE m,ite�y
❑ LANDSCAPE S%Nia�ri
❑ UTILITY
COMMUNITY PUNNING and
ENVIIiON�TAL SIItVICES... 231 NORTH COLLEGE, P.O.BOx 580 FORT COLLINS, COLORADO 805224590 303)221-6750
CURRENT PUNNING DEPARTMENT /
Y
5. Please indicate whether sod, wood mulch or gravel mulch is proposed within
the planting strips along the east and west property lines.
6. The City Forester has indicated that of the three Cottonwoods which are proposed to bed
removed, the north Cottonwood is in marginal condition. The south two have serious
structural problems and should be removed. Removal of the three Cottonwoods will be
allowed based upon the following conditions:
a. The size of the proposed Alberta Park Maples (Acer Platanoides "Emerald Queen')
be increased to a 3" diameter. -
b. The two proposed Pinon Pines should be replaced by two Blue Spruce (Picea
Pungens) of 10' - 12' in height.
C. The size of the two Corkscrew Hawthorns be increased to a 2.5" diameter.
Staff will schedule an administrative hearing after receiving and reviewing the requested revisions.
Please contact me at 221-6206 if you have any questions or concerns related to these comments. I
would like to schedule a meeting with you as soon as possible, if necessary, to discuss these
comments.
Sincerely,
Michael Ludwig
Project Planner
xc: Kerrie Ashbeck
Stormwater Utility
file/Project Planner
4. Comments and requested revisions from the Engineering Department are attached. A
comment was made that no traffic study or soils report were submitted. After further
conversation with the Engineering Department, the applicant may submit a traffic "letter"
which simply estimates the number of customers per hour and day and the hours of operatiorf.
However, a soils report must be submitted.
5. The Planning Department offers the following comments:
a. A bike rack should be provided. Please indicate its location on the Site/Landscape
Plan.
b. Additional landscaping is needed along the north edge of the parking lot to screen the
bumpers and headlights of cars from Harvard Street.
C. Please submit elevations of the proposed building.
d. As per our phone conversation on September 28, staff recommends the following
revisions to the parking lot layout for improved vehicle circulation, pedestrian safety
and landscape requirements:
The southwest and northwest parking stalls should be converted to
landscaped islands. This will allow a customer to back towards the west
property line and drive forward to the exit rather than backing through the
parking lot and into incoming traffic.
2. The sidewalk from the building to the public right-of-way should be moved
to the western edge of the parking lot. This will provide safer pedestrian
access and handicap access to the business. The area where the sidewalk is
currently shown should be landscaped. The handicap parking space should
be shifted to the south west corner of the parking lot.
3. The water and sewer service lines should be shifted (jogged) so as to avoid
conflicts with the landscaping on the east side of the entrance. There must be
a minimum of 4' separation for shrubs and 10' separation for trees from any
water or sewer main or service. The Water and Wastewater ijtility has
indicated that service lines may run beneath paving but requests that the
service line from the main to the stop box and meter pit be perpendicular to
the main and that the stop box and meter pit be located in a non -paved (turf)
area.
4. The proposed minor subdivision will be reviewed by the Director of Planning.
Please delete references to "Planning and Zoning Board" in the certification
and insert "Director of Planning".
Community Planning and Environmental Services
Current Planning
October 2, 1995
Dick Rutherford
Stewart and Associates
103 S. Meldrum
Fort Collins, CO 80521
Dear Dick,
Staff has reviewed your documents for the Cetacean Minor Subdivision, that were submitted on
September 1, 1995, and would like to offer the following comments:
The Zoning Department states that deciduous trees must be planted at 50' intervals along the
east property line from Harvard Street to the end of the service lane and on the west property
line from Harvard Street to the northwest corner of the proposed building.
2. U S WEST offers the following comments:
a. Review of these plans should not be construed as a commitment that telephone
facilities sufficient to serve this project are presently available. U S WEST will
provide telephone service in accordance with the rates and tariffs on file with the
Colorado Public Utilities Commission.
b. The owner is responsible for provision of all conduit, ditch crossings, and street
crossings for telephone facilities within the project. The owner also provides terminal
room space (usually 8' x 4) and power for the main at one building on each property,
generally in a utility room. The owner's vendor provides all facilities beyond the main
terminal. Contact Susan Peterson at (970) 224-7473 for conduit specifications for the
main telephone entrance cable.
7 cO The Site Plan shows a 15' utility easement along Harvard, while the Plat shows a 12'
easement. Which is correct?
d. Any relocation of existing telephone facilities required by these plans will be paid for
by the developer.
3. Comments and requested revisions from the Stormwater Utility Department are attached.