Loading...
HomeMy WebLinkAboutSIENA (OVERLAND RIDGE) PUD - FINAL ..... APPEAL TO CITY COUNCIL - 39-95A - CORRESPONDENCE - CITY COUNCILWater Utilities Stormwater City of Fort Collins MEMORANDUM TO: Mayor Azari and City Council Members FROM: Glen Schlueter, Stormwater Utility THRU: John F. Fischbach, City Manager�� Mike Smith, Water Utilities Gene Mana er Bob Smith, Stormwater Utility Manage DATE: May 6, 1996 RE: Item #33 - Siena Final P.U.D. Appeal This memorandum is for clarification of the second paragraph of the "Response" from Ted Shepard on page 5 under number 3 "Allegation: Natural Resources" where it inaccurately states the detention ponds were built incorrectly and are undersized. The fact is the detention ponds were built correctly. In their present form they are undersized for existing runoff; however, their size will be adequate when future master planned improvements identified in the Canal Importation Basin Master Plan are built. This may seem contradictory but it isn't. Presently, land to the west of Overland Trail drains through these ponds but it will not when the improvements in the master plan are built. Drainage west of Overland Trail will be diverted south to Spring Creek. During the past several years the Stormwater Utility has been purchasing R.O.W. for the improvements and once this is completed the final design of the system will proceed. The existing detention ponds were sized for runoff from lands adjacent to them and east of Overland Trail. The developer is required to ensure his development does not negatively affect downstream properties. Additional detention volume is being provided since the master planned improvements will not be built for several years. This will also provide for additional protection in the future for land owners downstream of the detention ponds. Also, improvements have taken place below the detention ponds to reduce the potential for damages to private and public property. If you have any questions on the above please don't hesitate to contact me.