HomeMy WebLinkAboutEVERGREEN BUSINESS PARK, LOTS 5 & 6, BLOCK 5 - I-L SITE PLAN REVIEW - 45-95 - CORRESPONDENCE -g. The Site Plan shows a note which states "Edge of Phase 2 asphalt/landscape mulch
bed typ." However, the Landscape plan has a note which designates the limit of
landscaping as the edge of Phase 1. All landscaping for Phases 1 and 2 should be
shown on the Landscape Plan and notes coordinated.
Please indicate the total square footage of each of the proposed buildings within the
footprint of each building.
Please provide typical dimensions for the standard and handicap parking spaces.
Z�19 Staff suggests that sidewalks along the north property line of lot 5 and south property
line of lot 6 be added to allow pedestrian connections from the proposed buildings to
1jjr the public sidewalk along Blue Spruce Drive. This may require four parking spaces
to be deleted.
Office facilities require safe and handicap accessible routes to the building entrances
It appears that each of the "bays" are designed to be an office/warehouse. Access to
the building entrances is gained via automobile travel lanes and/or through
travel/parking areas for vehicles accessing the proposed overhead doors to the
buildings. Staff suggests that the buildings be shifted towards the center of the site
to allow for pedestrian access to entrances on the north side of the warehouse/office
building on Lot 5 and to the south side of the warehouseloffice building on Lot 6.
If pedestrian entrances are provided as described in comment & staff suggests that
the windows and glass doors be moved to the north side of the warehouse/office
building on Lot 5 and to the north side of the warehouse/office building on Lot 6.
apt/ Please indicate the color(s) of the proposed buildings on the elevations.
This completes the review comments at this time. Additional comments may be forthcoming as the
various departments and reviewing agencies continue to review this request. Once the above stated
comments have been addressed, Staff will schedule an Administrative Hearing with the Director of
Planning for this I-L Site Plan.
Please contact me at 221-6206 if you have any questions or concerns related to these comments. I
would like to schedule a meeting with you as soon as possible, if necessary, to discuss these
comments.
Sinceerrely/
Michael Ludwig
Project Planner
xc: Sheri Wamhoff
Stormwater Utility
file/Project Planner
6. The Water Conservation Specialist offers the following comments:
The Landscape Plan shall contain a note calling for the review and approval by the
City of Fort Collins of the required landscape irrigation system, prior to the issuance
/ of a building permit.
The landscape plan shall include the total area (in square feet) for each landscape
category. Landscape categories are distinguished by their water requirements and
intended maintenance level. Examples of possible categories include, but are not
limited to, high water turfgrass, low water turfgrass, low water planting beds,
moderate water planting beds, and non -plant areas (paved areas, etc.). Please refer
to page 4 of the attached Water Conservation Standards for Landscaping for further
guidance.
0 Attached is a copy of the comments received from the Engineering Department.
8. Attached is a copy of the comments received from the Stormwater Utility.
9. The/Planning Department offers the following comments.
g( Please add a scale for the Vicinity Map.
Please revise General Note 1 on the Site Plan to state: "Existing zoning is I-L,
Limited Industrial."
Please revise General Note 2 on the Site Plan to state: "See Landscape Plan (Sheet
2 of 3) for all landscape requirements."
Please revise the Planning certification block to state:
Approved:
By the Director of Planning of the City of Fort Collins, Colorado, this day
of ,19 .
Director of Planning
Please number the Site Plan as "Sheet 1 of 3", the Landscape Plan as "Sheet 2 of 3",
and the Building Elevations as "Sheet 3 of 3".
Please clearly delineate the phasing line which separates Phases 1 and 2 and label
Phases 1 and 2.
If the applicant chooses to pave the turnaround with Phase 1, appropriate landscaping
must be installed.
Please show the location of trash dumpsters on the site plan. All dumpsters must be
fully enclosed (not visible), gated, and located on a paved surface.
c� A bike rack is needed for each of the warehouse/office buildings.
A 5' landscaping strip is required along all parking/lot lines under the Phase 2 parking
extension.
e/ A 2" caliper deciduous trees are needed on the north and south sides of the parking
lot along the property lines.
A 5' landscaping strip is required along the north and south property lines. It is
currently only 2' or 3' at the "back-up" sections of the parking lot.
City Code requires parking lots to have 6% interior landscaping. At the present time,
this proposal only provides 440 square feet of interior landscaping. A total of 1,346
square feet of interior landscaping is needed. Interior landscaping does not include
the five foot landscape strip along the property lines nor the ten foot landscape strip
between the parking lot and Blue Spruce Drive.
The Poudre Fire Authority stated that the office/warehouse buildings on lots 5 and 6 exceed
the 150' access requirement by approximately 20'. The applicant must either provide an
additional fire lane access back to Blue Spruce Drive, access to adjacent properties, or fire
sprinkler both of the buildings.
5� The Water and Wastewater Utility offers the following comments:
Please show the existing water and sanitary sewer mains in Blue Spruce Drive on the
Site Plan.
Please show the water and sewer services to the proposed buildings and identify the
proposed location for the curb stops and meter pits on the Site Plan.
Please add standard details for the water and sanitary sewer services, meter
settings/pits, etc. to the Site Plan.
7 A 4 foot separation distance for shrubs and a 10 foot separation distance for trees
must be maintained from all water and sanitary sewer services. Please coordinate the
location of all landscaping and services with the site engineer/designer.
Commt y Planning and Environmental vices
Current Planning
City of Fort Collins
November 3, 1995
Greg D. Fisher, Architect
3115 Clyde Street
Fort Collins, CO 80524
Dear Greg,
Staff has reviewed your documents for the Evergreen Park, Block 5, Lots 5 and 6, I-VAid Plan
that were submitted on October 6, 1995, and would like to offer the following comments
The Light and Power Utility states that street trees must be a minimum of 40 feet from street
lights.
The Building Inspections Department offers the following comments:
The site shall be accessible to persons with disabilities in accordance with Uniform
Building Code Section 3103 and UBC Appendix Section 3106. Provide designated
and marked accessible routes between building and the public way and accessible
parking and buildings. Provide parking and signs per Appendix Section 3107. All
required exits and all building entrances located within six inches of grade must be
accessible to a person in a wheelchair and must be connected to the public way (public
sidewalk) by an "accessible route of travel' complying with the American National
Standards Institute publication Accessible and Usable Buildings and Facilities.
Running slopes on accessible routes shall not exceed 1:20 with cross slopes not
exceeding 1:48. Accessible parking and access aisles shall comply with the above
referenced standards with slopes not exceeding 1:48 in any direction. Please show
,connections to the public sidewalk for all entrances and exits.
Oe The proposed warehouse/office buildings exceed 5,000 square feet in size and
therefore must be equipped with an automatic fire suppression system or
compartmentalized in sections of less than 5,000 square feet by fire resistive
construction in accordance with Sections 3802, UBC as amended by the City of Fort
Collins. Please add a General Note to the Site Plan regarding this requirement.
3. The Zoning Department offers the following comments:
,A! A barrier (i.e. fence) which prohibits access by vehicles other than emergency
vehicles, must be installed at the edge of the asphalt paving and the temporary gravel
turnaround. This fence can be removed once the turnaround is paved with Phase 2.
281 North College Avenue • P.O. Box 580 Fort Collins, CO 80522-0580 • (970) 221-6750
FAX (970) 221-6378 TDD (970) 224-6002