Loading...
HomeMy WebLinkAboutEVERGREEN BUSINESS PARK, LOTS 5 & 6, BLOCK 5 - I-L SITE PLAN REVIEW - 45-95 - CORRESPONDENCE - REVISIONSEvergreen Park Lots 5 & 6, Block-2 Comments Response Page t November 13, 1995 5a-c. information has been added to the site plan. 5d. Noted and revised. 6a: Note has been added. 6b. Information has been added to the landscape plan.. 7-8. Noted. See separate engineers response. 9a-e. Information has been added or revised as requested. 9f-g. A phase line has been added to the site plan and landscape plan. 9h. Provided. 9i. All parking stalls are dimensioned' on site plan and noted in parking section of landuse breakdown: 9j. Noted: A sidewalk cannot be added at either end of the parking lot due to the fact that this would require a reduction of 4'parking spaces to accomodate the area required. The .site will already undergo a reduction of 4 parking spaces to meet the landscape requirements. A total reduction of 8 spaces would be detrimental to the site. It should also be noted that there is an existing electrical vault located at the southwest comer of the site that would block a sidewalk along the south property line. 9k-1. See response note 2a. 9m. A note has been added to the character elevations to address proposed colors. Should you .have any questions related to these responses or if .you require anything further please do not hesitate to. call me. Also, please let me know once a hearing date has been scheduled. Best Regards,.. � • r„' n A �, ' Greg D, Fisher XC: Denny Meyer . Sierra Builders Sack Fetig - Fossil Creek Nursery Brian Shear - S.hear Engineering `_.EC D. FISHER, ARCHITEk , 3115 Gyde St. Ft. Collins. CO 80524 (303) 48478433 November 13, 1995 Mike Ludwig Planning Department City of Fort Collins M l No. College Ave. Fort Collins, CO 80524 RE: Evergreen Business Park Lots 5 & 6, Block 5 Revisions to address staff comments Dear Mike, This, letter is in response to staff comments of November 3, 1995 for the above' referenced project. The response numbers correspond to those of staff comments. The engineering, comments will be addressed separately by the project engineer (Shear Engineering). i! Tree locations have been revised. dw� The required accessible routes and proper site slopes were provided. However, a sidewalk has been added along the entrance sides of the buildings to delineate the pedestrian circulation from the vehicular circulation. W./A general note has been added to the site plan. 3a. Turnaround will be paved and required associated landscape will be provided with phase 1 construction. 3b. A trash enclosure has been added at the east end of the turnaround. 3c. A bike rack location has been indicated on the site plan for each of the buildings near the turnaround. 3d. Noted and provided. 3e. Noted and provided 3f. Parking lot dimensions have been.revised to provide 5' landscape requirement. 3g. Parking lot and paving area dimensions have been revised and landscape islands havebeen enlarged and added to meet requirements. )t At the Fire Departments request, a note has been added to the site plan to indicate a potential future access location to the adjacent north property.