Loading...
HomeMy WebLinkAboutHARMONY RIDGE, 2ND FILING - PDP - 49-95F - CORRESPONDENCE - TRANSPORTATION ISSUE (10)Steve Olt Re Street Agreement and E, ients _ Page 1 From: Marc Virata To: Jim Newcomb; kentb@jimselldesign.com Date: 2/24/04 9:18AM Subject: Re: Street Agreement and Easements Jim, I'm of the view that City staff does not have currently a formal position one way or another regarding vehicular access to Fromme Prairie Way and whether or not the street is public or private. We're more likely to have a "preferred" position based upon a reaction to a design proposal on your part. In talking with Engineering staff, I'd like to propose a meeting with you and your consultants to further discuss Fromme Prairie Way as it relates to a potential design as well as your previous questions. Meeting onsite tomorrow (and the rest of the week) is unfortunately not an option with most of Engineering staff due to a prior commitment. What is your availability next week? Thanks, Marc >>> Jim Newcomb <jnewc@verinet.com> 02/23/04 05:OOPM >>> David Pietenpol is still an owner on the property North across from Phase One (1). He said their intention with the agreement about an emergency access only was to reduce traffic for anticipated condos over another business center (mixed use required for approval). I suggested the Land Use Code (fire requirements), city staff and I were wanting to maintain the street as public and a second access to HRII but I didn't believe much traffic would be generated. His seemed to have an accepting reaction and is willing to meet and see if we can get together on the idea. He wants to see our concept plan and I want to see the agreement. We meet Wednesday 9AM at the site. Storm water files (about 6' deep) on PUD, Phase I, II and Tract 7 (Green area with wetland and detention East of Phase II) clearly delineate the several easements into the Cathy Fromme Prairie but no easement from Phase II down (Tract 7) the wetland and into the existing detention (old reservoir with outlet). It would seem helpful if we can detain most the storm water on the upper developed area and provide for no more than previous water flows into the wetland and detention. Tuesday, I talk again with Les Jones who owns several lots/homes in Phase I and assures me I am already a part of the Harmony Ridge Estate Homeowners. I am to receive the Homeowner documents, discuss Tract 7 and our probable need to complete easements for storm water and moving the 12" water line into Tract 7 (200', a N/S line, from FPW). CC: Cam McNair; Dave Stringer; dkarst@ncfspecialists.com; Steve Olt; Ted Shepard