Loading...
HomeMy WebLinkAboutHARMONY RIDGE, 2ND FILING - PDP - 49-95F - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSFORT COLLINS•LOVELANDWATER DISTRICT /v V August 20, 2004 Mr. Steve Olt City of Fort Collins P.O. Box 580 Fort Collins, CO 80525 RE: #49-95F Harmony Ridge Phase 2 PDP Dear Mr. Olt, SOUTH FORT COLLINS SANITATION DISTRICT F� R�N� Q�NN�NG 00R The Fort Collins - Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned request and submit the following comments. The District signature block is to be replaced with the District's standard signature block. The sanitary sewer connection to the existing manhole is to be core drilled. The building envelopes along Fromme Prairie Way need to be set back at least 20 feet from the 12 inch water line. The District does not allow service line crossings under planted islands or water quality ponds. The general notes need to be corrected to reflect District specifications and requirements. It is likely that significant damage to tree canopies will occur due to the location over the water and sanitary sewer easements. The District will not be responsible for landscaping. The sanitary sewer profiles were not included in the utility plans submittal. Please do not hesitate to contact me at 226-3104, ext. 14, if you have any questions or require additional information. Respectfully, rGl% z5 W. Farrill, P.E. District Engineer xc: Mr. Michael D. DiTullio, District Manager 5150 Snead Drive, Fort Collins, CO 80525 Phone (970) 226-3104 Fax (970) 226-0186