October 3, 1995
Mr. Jack Fetig
Fossil Crook Nursery
4914 South College Avenue
Fort Collins, CO 80425
Shenandoah Land L.L.C.
8101 Eatt Prentice Ave., Suite M180
Bxglewaad, C.'ularadu 80111
RE: Easement Letter of Agreement
Dear Jack:
Fax (303) 290-9097
This letter is to inform you that Shenandoah Land L.L.C. is ready, willing, and able to grant to Fossil Creek
Nursery a sanitary sewer easement for the Nursery subject to the following conditions.
1. Fossil Greek Nursery agrees to restore the easement area by regrading and reseeding and, if
applicable, resurfucing concrete or asphalt driveways.
2. Fossil Creek Nursery is to prepare a sanitary sewer easement along with a legal description
and descriptive drawing or update to the existing survey for the proposed casement at Fossil
Creek Nursery's solo expense.
When Fossil Crook Nursery signs an acceptable development agruument with the City of Fort Collins,
Colorado, Shenandoah Land L.L.C. agrees to grant the Nursery an easwnent patterned after the easement form
utilized by the City of Fort Collins. The Nursery will have the notarized casement recorded in the Larimer
County Clerk and Recorder's office. A copy of the recorded casement shall be provided to Shenandoah Land
L.L.C,
if you concur with these requirements, please indicate by signing below and returning one fully excCutcd copy
for our records.
Sincerely,
SHENANDOAH LAND L.L.C.
James R. McCory
Managing Member
AGREED AND ACCEPTED this _ day of October, 1995.
FOSSIL CltEEK 'NORSERY
VA
Jack Fctig, Owner
• Northern Engineering will meet with the ditch rider for the
North Louden Irrigation Ditch on Thursday October 5, 1995 to
discuss the proposed changes to the ditch. Northern has
previously had phone conversations with the Ditch Company
and the ditch company has stated that at this time, the
ditch company has no objections to the changes as proposed.
The Final Utility Plan Set will include a signature block
for the ditch company (Comment 9c).
• The release rate for pond N1 was calculated using the per
acre percentage of the culvert capacity as requested.
However, the RBD report states this value as 6.19 cfs/ac not
0.7 cfs/ac as stated in the Stormwater comment sheet. The
RBD value of 0.19 cfs/ac was used (Stormwater comment).
• When the design and location of the retention ponds are
fixed at Final submittal, a rating curve for the ponds will
be submitted (Stormwater comment 8).
• Attached is a letter of intent from Shenandoah L.L.C. (Jim
McCory) indicating his willingness to grant an offsite
easement for the sanitary sewer line. Easements throughout
the site for water and sewer have been put on the plat and
overall utility sheets (Engineering comment).
• An Utility Coordination meeting will take place on October
12, 1995 to resolve issues concerning the 60' ROW for
College Avenue and other outstanding issues.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
'_. •
Northern Engineering Services, Inc.
October 2, 1995
Mr. Michael Ludwig, Project Planner
Community Planning and Environmental Services
City of Fort Collins
P.O. Box 580
281 North College Avenue
Fort Collins, CO 80522-0580
RE: Preliminary Review Comments for Fossil Creek Nursery P.U.D.
Project No. 9539.00
Dear Mr. Ludwig,
Northern Engineering has received and reviewed the comments
by the City of Fort Collins regarding the Fossil Creek Nursery
P.U.D. project in south Fort Collins. This letter addresses the
comments related to the plan set or to utility/drainage issues
raised in your September 15, 1995 letter to the developers Jack
and Christine Fetig.
• An easement under the entrance drive has been added to the
plans to provide telephone service to Tract B (Comment 2a).
• The telephone pedestal will be relocated at the developer's
expense (Comment 2b).
• No wetlands will be dredged within the telephone easement
( Comment 2c) .
• The preliminary construction drawings have been revised to
reflect the Fort Collins -Loveland Water and South Fort
Collins Sanitation Districts' minimum design criteria
( Comment 3 ) .
• The applicant has decided to retain onsite the additional
volume created by this development. This will eliminate the
need for an offsite easement to Benson Reservoir (Comment 8
and Stormwater comment 9). Drainage easements have been
provided for the onsite retention ponds (Stormwater comment
1). In addition, the applicant has chosen to keep the
developed site flows separate from flows from Ridgewood
Hills by providing a separate swale and retention ponds. No
developed flows from this site should impact the wetlands
(Stormwater comment 3).
• The plans have been revised to show an approximate location
for the 7-foot sidewalk and access easement (Comment 9b).