Loading...
HomeMy WebLinkAboutFOSSIL CREEK NURSERY PUD - PRELIMINARY - 40-95 - CORRESPONDENCE - REVISIONS (3)COL RATJO LANDSOURCE'° in:3032909097 Ul. I ua ' y5 14%JU IVU.UlL r.u< (303) 290.9009 October 3, 1995 Mr. Jack Fetig Fossil Crook Nursery 4914 South College Avenue Fort Collins, CO 80425 Shenandoah Land L.L.C. 8101 Eatt Prentice Ave., Suite M180 Bxglewaad, C.'ularadu 80111 RE: Easement Letter of Agreement Dear Jack: Fax (303) 290-9097 This letter is to inform you that Shenandoah Land L.L.C. is ready, willing, and able to grant to Fossil Creek Nursery a sanitary sewer easement for the Nursery subject to the following conditions. 1. Fossil Greek Nursery agrees to restore the easement area by regrading and reseeding and, if applicable, resurfucing concrete or asphalt driveways. 2. Fossil Creek Nursery is to prepare a sanitary sewer easement along with a legal description and descriptive drawing or update to the existing survey for the proposed casement at Fossil Creek Nursery's solo expense. When Fossil Crook Nursery signs an acceptable development agruument with the City of Fort Collins, Colorado, Shenandoah Land L.L.C. agrees to grant the Nursery an easwnent patterned after the easement form utilized by the City of Fort Collins. The Nursery will have the notarized casement recorded in the Larimer County Clerk and Recorder's office. A copy of the recorded casement shall be provided to Shenandoah Land L.L.C, if you concur with these requirements, please indicate by signing below and returning one fully excCutcd copy for our records. Sincerely, SHENANDOAH LAND L.L.C. James R. McCory Managing Member AGREED AND ACCEPTED this _ day of October, 1995. FOSSIL CltEEK 'NORSERY VA Jack Fctig, Owner • Northern Engineering will meet with the ditch rider for the North Louden Irrigation Ditch on Thursday October 5, 1995 to discuss the proposed changes to the ditch. Northern has previously had phone conversations with the Ditch Company and the ditch company has stated that at this time, the ditch company has no objections to the changes as proposed. The Final Utility Plan Set will include a signature block for the ditch company (Comment 9c). • The release rate for pond N1 was calculated using the per acre percentage of the culvert capacity as requested. However, the RBD report states this value as 6.19 cfs/ac not 0.7 cfs/ac as stated in the Stormwater comment sheet. The RBD value of 0.19 cfs/ac was used (Stormwater comment). • When the design and location of the retention ponds are fixed at Final submittal, a rating curve for the ponds will be submitted (Stormwater comment 8). • Attached is a letter of intent from Shenandoah L.L.C. (Jim McCory) indicating his willingness to grant an offsite easement for the sanitary sewer line. Easements throughout the site for water and sewer have been put on the plat and overall utility sheets (Engineering comment). • An Utility Coordination meeting will take place on October 12, 1995 to resolve issues concerning the 60' ROW for College Avenue and other outstanding issues. Sincerely, NORTHERN ENGINEERING SERVICES, INC. '_. • Northern Engineering Services, Inc. October 2, 1995 Mr. Michael Ludwig, Project Planner Community Planning and Environmental Services City of Fort Collins P.O. Box 580 281 North College Avenue Fort Collins, CO 80522-0580 RE: Preliminary Review Comments for Fossil Creek Nursery P.U.D. Project No. 9539.00 Dear Mr. Ludwig, Northern Engineering has received and reviewed the comments by the City of Fort Collins regarding the Fossil Creek Nursery P.U.D. project in south Fort Collins. This letter addresses the comments related to the plan set or to utility/drainage issues raised in your September 15, 1995 letter to the developers Jack and Christine Fetig. • An easement under the entrance drive has been added to the plans to provide telephone service to Tract B (Comment 2a). • The telephone pedestal will be relocated at the developer's expense (Comment 2b). • No wetlands will be dredged within the telephone easement ( Comment 2c) . • The preliminary construction drawings have been revised to reflect the Fort Collins -Loveland Water and South Fort Collins Sanitation Districts' minimum design criteria ( Comment 3 ) . • The applicant has decided to retain onsite the additional volume created by this development. This will eliminate the need for an offsite easement to Benson Reservoir (Comment 8 and Stormwater comment 9). Drainage easements have been provided for the onsite retention ponds (Stormwater comment 1). In addition, the applicant has chosen to keep the developed site flows separate from flows from Ridgewood Hills by providing a separate swale and retention ponds. No developed flows from this site should impact the wetlands (Stormwater comment 3). • The plans have been revised to show an approximate location for the 7-foot sidewalk and access easement (Comment 9b). 420 S. Howes, Suite 202 • Fort Collins, Colorado 80521 • (970) 221-4158 • Fax (970) 221-4159