HomeMy WebLinkAboutFOSSIL CREEK NURSERY PUD - PRELIMINARY - 40-95 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYCenter For Microcomputers
In Transportation
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release
2.1
Page 1
HCS: Unsignalized Intersection Release 2.1
Page2
x+++x+xx++xxxxxxxxx++xxxxx++++++xxxxxxxxxx++xxx++xx+++xxxx++++xx
xxxxxxxxxxxxxxxx++++++xxxxxx+++++++xxxxxxxxxxxxxxxx+++++++++xx+w
File Name ................ LRPM.HCO
Streets: (N-S) US 287
(E-W) ACCESS
DRIVE
Major Street Direction.... NS
Worf:Sheet for TWSC Intersection
Lenpth of Time Analyzed... 60 (min)
-------------
Step 1: PT from Miner Street WBEb
Analyst ................... DP.0
Date of Analysis.......... 7/I1/95
Conflictin❑ Flows: (vph)
911
Other Information......... LONG RANGE
- PM PEAT: HOUR
Potential Capacity: (pcph)
478
Two-way Stop -controlled Intersection
Movement Capacity: (pcph)
478Prob.
of Queue -free State:
0.96
Northbound Bouthbountl
Eastbound
Westbound
Step 2: LT from Major Street SB
L T R; L T
L T R;
L T P.
___________________________________
NB
Lanes 1 O; 0
-:
1; 1 O 1;
U 0 U
Conflicting Flows: (vph)
186,
Stop/Yield ; N;
St
N:
Potential Capacity: (pcph)
172
Volumes 15 1645 1822
40; 41 15;
Movement Capacity: (pcph)
172
PHF � .95 .95 � .95
.95 .95 .95,
Prob. of Queue -free State:
0.90
Grade O O
; 0 ;
0
Step 4: LT from Minor Street WB
Eb
SU/RV's (%); 0 O ; O
01 O 0;
CV's C%) 0 0 0
0; 0 0;
Conflicting Flows: (vph)
3502
PCE's ; 1.1 1.1 � 1.1
1.1: 1.1 1.1:
Potential Capacity: (pcph)
6
________________________________________________________________________
Major LT, Minor TH
Impedance Factor:
0.90
Adjusted Impedance Factor:
0.90
Capacity Adjustment Factor
Adjustment Factors
due to Impeding Movements
0.90
Movement Capacity: (pcph)
5
Vehicle
Critical
Follow -up
________________________________________________________
Maneuver
__________________________________________________________________
Gap (tg)
Time (tf)
Left Turn Major Road
5.50
2.10
Fight Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Center For Microcomputers In Transportation
Left Turn Minor Road
7.00
3.40
HCS: Unsignalized Intersection Release 2.1
Page 3
+++++x+xxxx++++xxxxx+++++++xxxxxxx+++xxxxxx+++xxxxxxxx++xxxxxxxx
Intersection Performance Summary
F1owRate MoveCap SharedCap Avq.Total
Delay
' Movement v(pcph) CM(pcph) Csh(pcph) Delay
________ ______ ______ ______ ____________
LOS by App
EB L 47 5 x
______ _______
F
Eb R 18 478 7.8
+
B
NB L 18 172 3.4
D 0.2
Intersection Delay = 190.4
0
c
Center For Microcomputers In Transportation
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1
Page I
HCS: Unsignalized Intersection Release 2.1
Pace 2
File Name ................ LRAM.HCO
Streets: (N-S) US 287
(E-W) ACCESS DRIVE
Major Street Direction.... NS
Work6heet for TWSC Intersection
Lencth of Time Analyzed... 60 (min)
________________________________________________________
Analvst................... DP.0
Step 1: PT from Minor Street WB
EB
Date of Analysis.......... 7/11/95
______________________________________-________________
Other Information......... LONG RANGE
- AM PEAK HOUR
Conflicting Flows: (vph)
46e
Potential Capacity: (pcph)
802
Two-way Stop -controlled Intersection
Movement Capacity: (pcph)
802
Pr-ob. of Queue -free State:
0.99
I Northbound Southbound Eastbound 1
Westbound
________________________________________________________
L T R: L T
�____ ____ ---- ;---- ____
R: L T P:
---- :---- __-_ ---- i----
L T P.
____ ____
Step 2: LT from Major Street SB
NB
No. Lanes 1 01 0 2
11 1 0 li
0 0 0
________________________________________________________
Conflicting Flows: (vph)
Sto=/Yield N:
N�
Potential Capacity: (pcph)
530 530
Volumes 6 1360 i 937
13I 13 6:
Movement Capacity: (pcph)
530
PHF .95 .95 .95
.93: .95 .95:
Prob. of Queue -free State:
0.99
Grace 0 ! 0
I 0 1
0
MC'=_ (%) I 0 0 0
01 0 0:
Step 4: LT from Minor Street WB
EB
SU/RV's (%)1 0 0 7 0
0: 0 o:
Conflicting Flows: (vph)
2310
PCE's 11.1 1.1 1.1
1.1: 1.1 1.1:
Potential Capacity: (pcph)
35
____________________________________________________________________
---
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
Adjustment Factors
due to Impeding Movements
0.99
Movement Capacity: (pcph)------------------------------35
Veh:_le
Critical
Fellow -up
_________________________
Maneuver
__________________________________________________________________
Gap (tq)
Time (tf)
Left Turn Major Road
5.50
2.10
Rioht Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
3.30
Left Turn Minor Road
7.00
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1
Page 3
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Intersection Performance Summary
FlowRate MoveCap SharedCap Avq.Total
Delay
Movement v(pcph) Cm(pcph) Csh(pcph) Delay
________ ______ ______ ______ ------------
LOS
By App
EB L 15 35 174.9
______
F
_______
121.1
EB P. 7 802 4.5
A
NB L 7 530 6.9
B
0.0
Intersection Delay = 1.0
APPENDIX C
Center For Microcomputers
In Transportation
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release
2.1
Pace 1
HCS: Unsignalized Intersection Release 2.1
Page 2
File Name ................ SP.PM.HCO
Streets: (N-S) US 287
(E-W) ACCESS DRIVE
Major Street Direction.... NS
WorkSheet for TWSC Intersection
Lenath of Time Analyzed... 60 (min)
-
--------------------------------------------------------
Analyst................... DRC
Step 1: PT from Minor Street WB
EB
Date of Analysis.......... 7/11/95
________________________________________________________
Other Information......... SHORT RANGE
- PM PEAT: HOUR.
Conflicting Flows: (vph)
472
Potential Capacity: (pcph)
798
Two-way Stop -controlled Intersection
Movement Capacity: (pcph)
798
Prob. of Queue -free State:
0.98
' Northbound Southbound
1 Eastbound
Westbound
--------------------------------------------------------
L T R; L T
P.1 L T P,
L T P.
Step 2: LT from Major Street SB
________________________________________________________
NS
;____ ____ ---- ;---- -___ ----
No. Lanes 1 2 01 0 2
;---- ____ ---- ;----
11 1 0 11
____ ____
0 0 0
Conflicting Flows: (vph)
983
Stop/Yield N;
N:
Potential Capacity: (pcph)
509
Volumes 15 851 i 943
40: 41 15:
Movement Capacity: (pcph)
509
PHF .95 .95 .95
.951 .95 .95:
Prob. of Queue -free State:
0.96
GradeI 0 1 0
i 0 I
0
--------------------------------------------------------
MC s (%) O O 0
01 O 01
Step 4: LT from Minor Street WB
EB
SU/RV's (%>: 0 0 1 0
Of O OI
________________________________________________________
CV's C%) 0 0 0
0� 0 01
Conflicting Flows: (vph)
1829
PCE's 1.1 1.1 1.1
1.1: 1.1 1.11
Potential Capacity: (pcph)
72
________________________________________________________________________
Major LT. Minor TH
Impedance Factor:
0.96
Adjusted Impedance Factor:
0.96
Capacity Adjustment Factor
Adjustment Factors
due to Impedina Movements
0.96
Movement Capacity: (pcph)
69
Vehicle
Critical
Follow-up
--------------------------------------------------------
Maneuver
__________________________________________________________________
Gap (tg)
Time (tf)
Left Turn Major Road
5.50
2.10
Riaht Turn Minor Road
5.50
2.60
Through Traffic Minor Road
6.50
2.30
Left Turn Minor Road
7.00
3.40
Center For Microcomputers In Transportation
HCS: Unsignalized Intersection Release 2.1
Page 3
Intersection Performance Summary
F1owRate
MoveCap SharedCap
Avg.Total
Delay
Movement
________
v(pcph)
______
Cm(pcph) Csh(pcph)
______ ______
Delay
------------
LOS By App
EB L
47
69
147.7
------ -------
F
109.4
EB R
18
798
4.6
A
NB L
IB
509
7.3
B 0.1
Intersection Delay =
3.3
Center For Microcomputers In Transportation
HCS: Unsianalized Intersection Release 2.1 Page I
File Name ................ SRAM.HCO
Streets: (N-S) US 287 (E-W) ACCESS DRIVE
Major Street Direction.... NS
Length of Time Analyzed... 60 (min?
Analyst ................... DRC:
Date of Analysis.......... 7/11/95
Other Information......... SHORT RANGE - AM PEAK HOUR
Two-way Stop -controlled Intersection
Northbound Southbound Eastbound Westbound
L T R: L T R: L T R: L T R
-_ ____ ____ ____ ____ ----
No. Lanes 1 _ 0: 0 2 1 1 0 1 0 O O
Stop/Yield : N: N:
Volumes 6 704 485 13: 13 6:
PHF .95 .95 .95 .951 .95 .55:
Grade i 0 0 0 O
Mnrg r%) 0 0 0 0: 0 0:
SU/RV's (%?: 0 0 0 0: O 0:
CV's C%) 0 C, O 0: 0 0:
PCE's : 1.1 1.1 1.1 1.1: 1.1 1.1:
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major
Road
5.50
2.10
Riaht Turn Minor
Road
5.50
2.60
Through Traffic
Minor Road
6.50
3.30
Left Turn Minor
Road
7.00
3.40
Center For Microcomputers In Transportation
HCS: Unsionalized Intersection Release 2.1 Page 2
xrtxxrtxxxx++xxrtrtx++++++xxx+++++xxxx+++++++x+xxxxx+++x++++++rtrtxxxx
WorkSheet for TWSC Intersection
--------------------------------------------------------
Step 1: PT from Minor Street W8 E8
Conflicting Flows:
(vph)
242
Potential Capacity:
(pcph)
1044
Movement Capacity:
(pcph)
1044
Prob. of Queue -free
State:
0.99
--------------------------------------------------------
Step 2: LT from Major
Street
S8 NE
________________________________________________________
Conflicting Flows:
(vph)
498
Potential Capacity:
(pcph)
926
Movement Capacity:
(pcph)
926
Pro-. of Queue -free
State:
0.99
__________________________
Step 4: LT from Minor
Street
ED
_______________________tree_
Conflicting Flows:
-------------WP-------------
(vph)
1202'
Potential Capacity:
(pcph)
ISO
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Impeding Movements
0.99
Movement Capacity:
(pcph)
179
Center For Microcomputers In Transportation
HCS: Unsionalized Intersection Release 2.1 Page 3
rtx++xxxxxxxxrtrtxxxxxxxrtrtrtrtrt++x+xxxrt++++xxxrtxx++++xxxxxxxx++++rtxx+
Intersection Performance Summary
F1owRate MoveCap SharedCap
Avg.Total
Delay
Movement
________
v(pcph) Cm(pcph) Csh(pcph)
______ ______ ______
Delay
------------
LOS 8y App
j E8 L
15 179
21.9
______
D
16.1
ES R
7 1044
3.5
A
N8 L
7 926
3.9
A 0.0
Intersection Delay
0.3
APPENDIX B
MATTHEIN J. DELICH, P.E.
3413 BANYAN AVENUE
LOVELAND, CO 80538
TABULAR SUMMARY OF VEHICLE COUNTS
Observer Date 6 -Ac:2 Day City 1'70P-T COLLIU—"' Co R = Right turn
Uri 781 S = Straignt
INTERSECTION OF AND U ILTafZI A L = Left tum
TIME
BEGINS
US Zh'1
l 5 7 �rl
TOTAL
North
South
TOTAL
East
I W'
TOTAL
ALL
from NORTH
from SOUTH
from EAST
from WEST
R I S
I L
I Total II R
I S I L I Total I
R I S I L I Total
I R
S I L( Total
\SA
o
1130
0 l- I II
1 2 1- I o I
I
II
II
�'• �, II
- I sa
1
II 1
3zi I - I II
I �- I - I � I
II
I
I
II
o I
I
I I I
I
II
o I
I I I
II
II
II I
I
II
I t II II
I I I
II
i I I
I
II
II I
I I
II i
i I II II
I I I
II
I I I
II
II
II I
i I II I
I I II II
I I I
II
I I I
II
It
_
II- I�io21
I II i'zi l -I II II
bl - 12 I
II
I I I
II
II
4 II- I�3�1
I IIbI3sAl-I II I�-I
- I0I
I
I I I
I
II
�'^�- II- Iqo-�lal
III I?q II II II�
I II 1 II
I
I
II
II
'III I=�bI
=I II�I�Ici "I II II
d1- 101
I I
I I II
II
`o'rj?(. II ' I t 5011
1� I II 2 113b51 - I II II
b I I I II
I
I I II
II
II I I
I II I I II II I I I II
i
I I I
II
II I i
I II I I I II I I I I II
I
I I II
II
II I f
I II I I i II II I I i II
I
I I II
II
II I
I it I I I II II I I i I
I
i I
II
II I (
I II I I I II II I I I
I I
I I I
II
II I I
I II I I
I II II I I I II
I
I I II
� it
APPENDIX` A
Table 1
Trip Generation
Daily A.M. Peak
Land Use Trips Trips Trips
in out
Fossil Creek Nursery 1,440 19 19
15 acres
Table 2
Short Range Peak Hour Operation
Intersection
US 287/Access Drive (stop sign)
EB LT
EB RT
NB LT
Table 3
P.M. Peak
Trips Trips
in out
55 56
Level of Service
AM PM
D F
A A
A B
Long Range Peak Hour Operation
Level of Service
Intersection AM PM
US 287/Access Drive (stop sign)
EB LT F F
EB RT A B
NB LT B D
AM / PM (DHV)
3
vi
.
N
NO SCALE
1995 PEAK HOUR TRAFFIC
AND DESIGN HOURLY VOLUMES Figure 3
p
Lo
CD
M_ol
1
13/41
6/15 —1 Lo M
N
N
AM / PM (DHV)
A&
N
NO SCALE
SHORT RANGE PEAK HOUR TRAFFIC ::j
AND DESIGN HOURLY VOLUMES Figure 4
�o
N
M
NO SCALE
O
N
N
LONG RANGE PEAK HOUR TRAFFIC
AND DESIGN HOURLY VOLUMES
AM / PM (DHV)
Figure 5
---------------
Fire Access
I
III i`
II
II
1 I I Access
1 I I Drive
II ��
II �
Fire Access
Future
Access
A&
N
NO SCALE
r`
N
SITE PLAN
Figure 2
4-
N
BM 4954
ilia
TT.
00 - -sQfsix, MIT
go qA. T9 I' 141.
litilh Growl Pit
t-,
R
Tadic
------ k— .0715
22 f h n
, . , ri, I
LAWN101, 20
'Inyon K Theati
ties
Da.
I .�Bm,
2 7_'
26 1.k
F
77
q ,
PG,,tav I x 2
0.6,
s,
1549
all
D,!
9, 5,
Sp,ing Can . . . . ."Gravel I
.91
Dmn pit Me Cleilands.
Mir ;y
'A
00
p
Pe
iAT
CIP 4116
C-4
Ift
Tilli9ij
FOSSIL CREEK NURSERY
If U; A.,hl. 1, 1 P ..... ..
it
Redmond 7�----.ond
.Res1ba-n Memaul Gardens rt
1 11 (C hetery)
#
Theater
5,32A�t
p
NO SCALE
m
SITE LOCATION Figure 1
no additional auxiliary lanes associated with this development are
required.
It is expected that development will occur to the south and
west of the site. Preliminary plans for this development indicate
an access street west of US 287, across from Victoria Drive. It
is the desire of Fossil Creek Nursery that a driveway from the
nursery connect to that street. This driveway would be through the
rear of the Fossil Creek Nursery property. The land to the south
will likely be developed at higher trip intensity uses than the
nursery. A signal may be warranted at the US 287/Victoria
intersection. This should be the subject of a future traffic study
for that future development. When the connection is made to the
future street, users of Fossil Creek Nursery will have alternative
access. If this occurs, the stop sign controlled left turns that
are shown to experience delays will have an alternative access
through the signalized intersection. This would allow the direct
access to the site to be limited to right-in/right-out, and
potentially left -in. It is likely that the geometry of US 287 will
allow left -in access.
It is concluded that the key access intersection will operate
acceptably in the short and long range future with the exception
of the left turns exiting the site. A southbound right -turn
deceleration lane along US 287 is required with this development.
the 1995 peak hour counts, is approximately 5 percent higher than
the calculated 1993 Traffic Data DHV, factored to reflect 1995
conditions.
Trip generation for this proposed development was determined
using equations and factors contained in Trip Generation,_5th
Edition, ITE. Table 1 shows the trip generation on a daily and
peak hour basis. The trip distribution assumed that 70 to 75
percent of the site generated traffic was to/from the north and 25
to 30 percent of the site generated traffic was to/from the south.
Two future years were analyzed with regard to the key access.
The short range future assumed that the nursery would be relocated
by 1996. A long range (2015) analysis was also performed.
Figure 4 shows the short range peak hour and DHV traffic
expected at the proposed access drive to US 287. The DHV traffic
was calculated by averaging the morning and afternoon peak hour
traffic. This procedure is in accordance with Section 4.3.3 of the
State Highway Access Code. A level of service analysis was
performed to determine the future operating conditions at the
access drive upon completion of the proposed project. With stop
sign control, the intersection would operate as indicated in Table
2. Calculation forms are provided in Appendix B. The intersection
operation will be acceptable with the exception of the left -turn
exits from the site. Acceptable operation is defined as Level of
Service D or better. As indicated in Table 2, it is expected that
the left -turns exiting the project site would experience delays,
particularly during the afternoon peak hour. This is typical at
intersections of driveways and major roadways. The delays to
motorists exiting the site would be similar to those currently
experienced by customers of the existing Fossil Creek Nursery.
Based upon the traffic projections provided in Figure 4, a
right -turn deceleration lane would be required at the proposed
access drive in the southbound direction. This lane should be 450
feet long plus 270 feet of taper. This assumes that the right -
turning vehicles could make their turn at 15 mph. The deceleration
lane would be located in the existing paved shoulder area. If the
taper of 270 feet would not be achievable, the taper could be
reduced to a minimum of 220 feet. No other auxiliary lanes are
required at the access drive. It should be mentioned that the DHV
estimated for the northbound left -turn into the site is very close
to requiring a deceleration lane for this movement. However, a
center two-way left -turn lane currently exists on US 287 which
would serve as a left -turn lane into the site.
Figure 5 shows the long range -peak hour and DHV traffic
expected at the proposed access drive to US 287. With stop sign
control for the driveway, this intersection is projected to operate
acceptably with the exception of the exiting left -turns, as
indicated in Table 3. Calculation forms are provided in Appendix
C. As noted earlier, it is typical for vehicles exiting driveways
onto major roadways to experience delays. With the long range DHV,
c
co
C
MEMORANDUM
O
To: Jim Sell, Jim Sell Design
Oo
01
Mike Ludwig, Fort Collins Planning Department
O
19
Eric Bracke, Fort Collins Traffic Engineer
v
o
o
�
From: Matt Delich
Date: August 14, 1995
O
J
Subject: Traffic analysis for the proposed relocation of the
Z)
Fossil Creek Nursery (File: 9568MEM1)
z
w
a
z
This memorandum documents the traffic analyses related
>
to relocating the Fossil Creek Nursery from its current
a
location at 4919 S. College Avenue, to a location at 7029 S.
0°
College Avenue (US 287) south of Trilby Road, in Fort Collins,
Colorado. The proposed project would be. -located on the west
side of US 287, with one access drive. Figure 1 shows the
location of the proposed development and Figure 2 illustrates
the proposed site plan. This memorandum was prepared to
specifically address the access needs to US 287 as required
by the State Highway Access Code (SHAC) and by the City of
Fort Collins Transportation Department.
US 287 is a state administered highway that passes
through Fort Collins in a north/south direction. It serves
both local and through traffic. It is a four lane highway
with a center two-way left turn lane. The shoulders on both
sides of the highway are paved with curb and gutter. The
shoulders are used as right -turn auxiliary lanes at various
z
driveways and streets that intersect US 287. Adjacent to the
w
project site, the speed limit is posted at 55 mph. To the
z
north of the site, the speed is reduced to 45 mph near Trilby
z
Road. The central area of Fort Collins is north of the site,
w
J
while the City of Loveland is to the south. The proposed
a
�_
access drive would have no sight line constraints along US
287.
C-3
o
The 1993 Traffic Data (Colorado Department of
Transportation) shows the average daily traffic (ADT) in this
c
o
segment of US 287 to be 21,300. The design hourly volume
a
(DHV) is 10 percent of the ADT. The twenty year factor is
a
2.0, indicating an annual growth rate of 3.5 percent per year.
The truck factor is approximately 4 percent. In addition to
•
the above information, peak hour traffic counts were obtained
3
a:
at the US 287/Victoria Drive intersection in July 1995. This
W
s
intersection is located to the south of the project site. Raw
¢
traffic data is provided in Appendix A. These counts are
H-
shown in Figure 3. The design hourly volume, calculated from